PLATO : TOU PROGRESS MEETING 14-15/12/2010 S. Mellé (CNES, PLATO Instrument PA Manager) Outline 1- PLATO and TOU PA organization 2- CNES PA organization.

Slides:



Advertisements
Similar presentations
Welcome & Introduction
Advertisements

Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Isabella Pagano & Roberto Ragazzoni -
Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec.
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Battery Safety and Design Manual for Payloads presented by Jerri S. Ling September 13, 2004 presented by Jerri S. Ling September 13, 2004.
Fermilab’s New Quality Assurance Program Irwin Gaines 23-Jan-2008.
DAVOS, November 2010 group GETCU (JP Marcovici) PICARD : Consortium meeting 1 PMOD/WRC Davos november 2010 Présenté par : JP. Marcovici Sigle.
Cheryl McCarthy Manager, Quality Assurance MBC Session October 3, 2008 GCP Compliance in our Vendors.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Development plan and quality plan for your Project
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
LSST Camera Performance and Safety Assurance Plan and Safety Overview Joe Kenny Camera Safety Manager LSST Safety Council Review 18 August 2015.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Software Quality Assurance Activities
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
QA/QC and QUALIFIERS LOU ANN FISHER CITY OF STILLWATER, OK
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
Laser-Astrodynamics, Space Tests of Relativity, and Gravitational Wave Astronomy 3 rd International ASTROD Symposium – Beijing, China – July 2006 TIME.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
SWEA Product Assurance SWEA Peer Review March 28-29, 2011 IRAP, Toulouse.
THEMIS Mission Assurance
ISUAL Product Assurance
University of California - Berkeley
0.0 Instrument Suite Name Presenter’s name
Overview of Project Management
Medical Cannabis Project
GLAST Large Area Telescope:
Radiation Requirements for the AO Response
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
DOE Review of the LCLS Project October 2006
Overview of Project Management
Presentation transcript:

PLATO : TOU PROGRESS MEETING 14-15/12/2010 S. Mellé (CNES, PLATO Instrument PA Manager) Outline 1- PLATO and TOU PA organization 2- CNES PA organization 3- PLATO PA specification 4- PA documentation to be produced 5- Remarks on the first proposed materials

PLATO : TOU progress meeting, 14-15/12/ PLATO PA organization (1/2) Proto Camera AIT F. Madec Telescope Optical Unit R. Ragazzoni CAMERAS D. Laubier Thermal support PLATO Instruments Manager P. Bodin RAIV R. Pérez PLATO instrument PA manager S. Mellé TOU Optical tests Structure Management Optics straylight OMT Thermal N-TOU R. Ragazzoni AIV GSE F-TOU W. Benz AIV GSE Filters CAMERAS/System team Manager P. Levacher (LAM) Instrument System coordinator P. Levacher PLATO Project Manager PLATO Payload Manager PLATO PA manager: ??? PLATO Project Team TOU PA manager: Giacinto De Paris TOU structure PA manager: ??? Filters PA manager: ???

PLATO : TOU progress meeting, 14-15/12/ PLATO PA organization (2/2) TOU PLATO instrument PA manager S. Mellé Structure Filters PLATO PA manager: ??? TOU PA manager: Giacinto De Paris TOU structure PA manager: ??? In charge of: - Instrument PA management - Interface/reporting with/to the ESA PLATO PA manager - Following of the respect of ESA PA specification at equipment level In charge of: - Satellite PA management In charge of: - TOU PA management - Interface/reporting with/to S. Mellé - Following of the respect of ESA PA specification at subcontractors level Filters PA manager: ??? In charge of: - Filters PA management - Interface/reporting with/to TOU PA manager In charge of: - Structure PA management - Interface/reporting with/to TOU PA manager

PLATO : TOU progress meeting, 14-15/12/ PA organization in CNES Samuel Mellé PLATO instrument QA Experts Eric Verlet Delphine Faye (contamination) + ….. Grégory Navarro Gilles Codou Guy Rolland Myriam Cournet Hélène Combes Patrick Saunier Gilles Dorléac Project Quality Jean-Paul Etienne Configuration and documentation Roland Laulheret Dependability Philippe Lay EEE Parts and Qualification Jean-Louis Venturin Environnement and new parts Christian Durin Technologies Materials and Processes Jean-Louis Pédron Ground and operations QA Software Francis Pressecq Laboratories and Expertises EEE partsDependabilityDocumentation Configuration RadiationsMaterials and Processes SofwareExpertises PA manager Roland Catala Integration QA QA Experts can provide a support in methodology (how to perform dependability analyses, MCP lists, radiaton analysis, etc…) and will analyse the provided documents EEE and materials qualification (DPA, outgassing characterization, radiation tests, etc… ) can be performed at the CNES laboratory

PLATO : TOU progress meeting, 14-15/12/ PA Management: - Risks management - Configuration and documentation management - Discrepancies management - Alerts management - Integration QA - … Product Assurance Specification PA Plan: QA expertise : - Safety, Dependability, EEE parts, Radiations, Materials and Processes, Software, Contamination PA specification not yet provided by ESA  CNES PA plan (under approval circuit) is applicable to cooperatings labs  CNES PA specification based on ECSS tailoring to be written

PLATO : TOU progress meeting, 14-15/12/ Documentation to be produced (1/2) Product assurance management Materials and Processes Contamination Radiations

PLATO : TOU progress meeting, 14-15/12/ Documentation to be produced (2/2) NA for TOU Dependability EEE parts Software

PLATO : TOU progress meeting, 14-15/12/ Remarks on the first proposed materials Albemet: Ok but not from Brush Wellman because of ITAR licence Al 7075: Ok but do not use OAN because of holding issue and prefer the use of T7351 thermal treatment instead of T6 (see ECSS recommandation). Al 6061: Ok (thermal treatment T6 ok) Ti6Al4V-STA: Ok but not from Western Titanium because of ESA alert file (ESA-EA-2009-Mat4). Dispal: Materials QA experts don’t know this material => provide the datasheet and the flight heritage