MR DI Dr. Leo GRILL Budapest, January 29th 2009 Integrated River Engineering Project on the Danube to the East of Vienna www.donau.bmvit.gv.at.

Slides:



Advertisements
Similar presentations
Water.europa.eu Water quality in the Danube basin Third Conference on the EU Strategy for the Danube Region 21 April 2010 Marieke van Nood Water Unit DG.
Advertisements

Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
1. 2 Montlhy and biannually, USA provides information about forecast and status of Colorado River Basin. Since 2000, drought in the basin caused low levels.
Strategic Projects The Ireland Wales Experience INTERACT – Rome, November 10 th 2011.
Sustainable development of inland waterways transport Tamás Marton – Ministry of Transport, Communications and Energy – Hungary
Zagreb, th of February 2014 Project funded by the European Union Involvement of public & transparency of the planning process in IWWs infrastructure.
Project presentation. Network of Danube Waterway Administrations – data and user orientation SVP via donau OVFRSOE AVP Plovput ACN EAEMDR AFDJ Photo credits:
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
Gravel Mining Ryan Kindt Kristina Lowthian CIVE 717 April 9, 2012 Gualala River, California fly-over, Courtesy: Jamie Hall.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
Drainage Channel Restoration Construction Project Wood Co. Engineer’s Office Great Lakes Protection Fund A.D. Ward, D. Mecklenburg, R. McCall, D.J. Mears.
Draft River Basin Management Plan Workshop Freshwater Pearl Mussel December 2008.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Project situation analysis and technical reporting UNEP/GEF FNR_Rio project – 3 rd Project Steering Committee, March 13 th, 2012, Tehran, Iran Peter Herkenrath,
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
FAIRway Danube Commission Meeting in Budapest
Development of Environmental Law in China: Prof. Dr. Qin Tianbao Research Institute of Environmental Law Wuhan University.
1 State of navigational bottlenecks in the German Danube section Nicolai von Rimscha Bavarian Ministry for Economic Affairs, Infrastructure, Transport.
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
Replacement of existing rock groynes and other in river restoration works to improve rapids and habitats in the River Wye at Symonds Yat.
1 IRIS Europe 3 – Implementation of River Information Services in Europe The European Union's TEN-T programme supporting …
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.
Selected Activities of the Sava Commission DANUBE INFORMATION SERVICES CONFERENCE – DISC, Belgrade, 3rd-4th December, 2013.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Sergey Tzarnakliyski Belgrade, December 4, 2013 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
Available Review Cycles Tokyo to Vienna Assumptions: ExC Review limited to 5 days Specification submitted for QR by 11/2 Editing/Integration limited to.
Community of Practice on partnership in the ESF October 2008 Open Days Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
Lake Tahoe Stream Channel Load Reduction and Costs Virginia Mahacek Valley & Mountain Consulting September 2007 Focus Team Workshop 1.
EC Working Group on Rivers 19 th of February 2009 Inland waterways transport on the river Danube.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Platina Manual on Sustainable Waterways ICPDR Philip Weller Brussels, Nov 21, 2010.
Water Director Meeting 30th November 2006, Inari / SF WFD and Hydromorphology Technical report on “Good practice in managing the ecological impacts of.
Upper White Pine Floodplain Reconnection Presentation to PRCC Nov. 13, 2014.
United States adults in the 6 Americas, March 2012 (992 people surveyed by Yale/George Mason University) How do our class data compare to the national.
Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
JOINT STATEMENT FOLLOW UP MEETING `09 Horst Schindler, Ivana Tomic Budapest, January 29, 2009 Danube Commission, Budapest.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
RIS NÖ Irma Priedl Zilina, Niederösterreich – some geographical & structural data Largest province of Austria 1.55 mill. Inhabitants Area of.
Department of Municipal Affairs Community Sustainability Partnership.
January 2009 Phase IVB Construction Photographs by Brent Anderson.
DEVELOPMENT OF A TIMELINE FOR A REVIEW OF SCIENCE AND POSSIBLE MANAGEMENT ACTIONS FOR COYOTES Fish and Game Commission October 8, 2014 Agenda item 16 (b)
PERFORMANCE REVIEW Outlook for 2005/06 Financial Year Performance/Expenditure Expenditure review 2001/02 – 2007/08 Department of Local Government & Housing.
Thematic assessments based on results from RBMPs Coastal and transitional ecological status & related presures Inland surface waters Hydromorphological.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
Danube Transnational Programme
EEA 2017 State of European waters
Project DREAM Danube River REsearch And Management
Interdisciplinary dialogue on IWT infrastructure preparation
A European Network of Resource Efficiency Service Providers
Projects under DTP Thematic Pole 2 TP2 (Framework Support for RDI)
Károly Gombás SDR PA5 HU coordinator , EU WG-F 21st meeting, Bucharest.
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Projects related to PA 10 Overview
EEAs assessments of the status of Europe’s waters
Water Directors meeting Warsaw, 8-9 December 2011
Austrian inland waterways management policy
Projects related to PA 10 Overview
Water and Adaptation Modelling
Water Director's Meeting December 2013, Vilnius DG Environment
Presentation transcript:

MR DI Dr. Leo GRILL Budapest, January 29th 2009 Integrated River Engineering Project on the Danube to the East of Vienna

© via donau I 2 Integrated River Engineering Project Project area Project area: stream-km 1.921, ,7 from the Freudenau Power Plant to the Austrian-Slowak border

© via donau I 3 Low water regulation River bed stability Improvement of ecological functions Improvement of fairway conditions River bank restoration Side arm reconnection Granulometric river bed improvement AIMS MEASURES Integrated River Engineering Project Aims and measures

© via donau I 4 The Integrative River Engineering Project … is the result of an integrative planning approach (official starting point: installation of an interdisciplinary steering committee by the bmvit in 2002) therefore complies with the objective of the Joint Statement presents a living and successful example for integrative planning for combining the needs of navigation and ecology is honoured as best practice for integrated planning approaches in the Joint Statement The process for achieving the Joint Statement was supported by the bmvit, via donau and the Danube Floodplain Nationalpark by sending experts hosting the first workshop in April 2007 Integrated River Engineering Project & Joint Statement

© via donau I 5 Environmental Impact Assessment March 2006 – approx. 2nd quarter of 2009 Submission of the Environmental Impact Statement (EIS) – March 2006 public edition of the EIS: December 2007 – January 2008 public hearing: October 21st – October 23rd, 2008 Afterwards: detail planning, approval and construction of the lots Detailed Model Studies completed Implementation of 1:1 Pilot Projects Pilot Project Witzelsdorf: construction work started in late2007 Pilot Project Bad Deutsch-Altenburg: tender in progress; beginning of construction work is anticipated for 2009 Integrated Monitoring-Program since 2005 and further on accompanying implementation Integrated River Engineering Project Project status

Pilot Project Witzelsdorf example for combining the needs of navigation and ecology

© via donau I 7 Pilot Project Witzelsdorf Overview innovative groynes river bank restoration Pilot Project Thurnhaufen

© via donau I 8 Pilot Project Witzelsdorf Overview stream-km 1.893,4 to 1.891,7 river bank restoration and reconstruction of low water regulation Aims: increasing dynamics at the riverbank implementing innovative groynes (new shape, fewer and lower groynes with same effect during low water conditions) gaining building experience for the Integrated River Engineering Project construction works: since late 2007 to approx. March 2009

© via donau I 9 Pilot Project Witzelsdorf Reconstruction of low water regulation New groynes are downstream faced for redirecting the current to the river bank > higher dynamics at the river bank. old groyne new groyne

© via donau I 10 Pilot Project Witzelsdorf Reconstruction of low water regulation Removal of an old groyne – note the height.

© via donau I 11 Pilot Project Witzelsdorf Reconstruction of low water regulation Lower new groyne at the same day / water level. Effective under low water conditions only.

© via donau I 12 Pilot Project Witzelsdorf Reconstruction of low water regulation By-pass channel at low water level for higher dynamics in the groyne field and as fish path for young fish along the river bank.

© via donau I 13 Pilot Project Witzelsdorf River bank restoration River bank before the construction work

© via donau I 14 Pilot Project Witzelsdorf River bank restoration Construction work - excavators in the service for ecology.

© via donau I 15 Pilot Project Witzelsdorf River bank restoration River bank just after the construction work. The river will shape its new river bank for its own.

© via donau I 16 Pilot Project Witzelsdorf River bank restoration Typical natural river bank after some months/years (depending on hydrological conditions). Picture taken at the already completed river bank restoration section Thurnhafen vis-à-vis Hainburg.

© via donau I 17 MR DI Dr. Leo GRILL Bundesministerium Verkehr, Innovation und Technologie - bmvit Leiter Abteilung IV/W 3 - Bundeswasserstraßen Radetzkystraße 2, A1030 Wien tel fax