9/30/2000 2-1 Module 2 Set-Up Your Workspace to Contain Lead Dust.

Slides:



Advertisements
Similar presentations
October Module 5: Cleaning Activities and Checking Your Work Overview Interior cleaning techniques. Exterior cleaning techniques. How to check.
Advertisements

IN-PLACE PROTECTION. LEARNING OBJECTIVES Explain the objective of In Place Protection Identify the means of warning List the criteria in choosing room.
Architecture CAD living sleeping service SPACE PLANNING
Home Fire Hazard Inspections. What we will learn today We will learn how to keep our homes and families safer by conducting home inspections to find the.
V-1 MODULE V - DOING LEAD-BASED PAINT MAINTENANCE JOBS  Explain lead safe work practices: Work Smart, Work Wet, Work Clean.  Use cleanup procedures for.
October Module 4: Contain Dust During Work Overview What is containment? Containing dust for interior activities. Containing dust for exterior.
Overview for Resource Room 203 Day 2 Part
SETUP Chapter 6 Lead Abatement for Workers Course.
Lead-Safe Certified 2-Hour Hands-On Session “2-hour hands-on training is required.” “Students must complete all required Steps.” “Instructors shall evaluate.
Free house located at 130 W. Sheboygan Street, Campbellsport, WI.
EDT Floor Plan Design-Bedrooms1 Weekend Cabin Retreat Project Designing the Floor Plan - Bedrooms Sacramento City College EDT 300.
1 Shelter-In-Place Everyone needs to know how... The protective action recommended by the Fire Department and Health Services Department after a chemical.
6/11/ Module 3 Safe Work Practices. 6/11/ Module 3 Overview — High risk practices to avoid — Safe work practices and safe work practices toolkit.
Soil Abatement & Cleanup Chapter 9 Lead Abatement for Workers Course.
Hard Floor Care VCT floor stripping This presentation is available for review at:
© Pearson Education Limited, Copying permitted for the purchasing institution only. This material is not copyright free. Painting and Decorating.
October Module 4: Review of Prohibited Practices, Personal Protective Equipment and Dust Control Overview: Prohibited practices. Protect yourself.
Lead-Based Paint in Your Home: What the Risks Are and What is Being Done About it About Lead-Based Paint Why is lead used in paint? Lead gives the paint.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
1 CHILDHOOD LEAD POISONING PREVENTIVE MAINTENANCE PROGRAM.
Room Planning Living Area 1.
GOING BLUE Making your home and your vehicle smoke-free.
Geometry Point Line Line segment Ray Plane Parallel lines
9/30/ Module 3 Safe Work Practices. 9/30/ Video Segment: Safe Work Practices — Think about the following points as you view the video.
IV-1 MODULE IV-PLANNING THE JOB  Plan a lead-based paint maintenance job.  Recognize an activity as either low risk or high risk.  Choose appropriate.
Housing to Meet Special Needs of Families Competency 1.03.
Fire Safety 7th Grade.
Do: Limit movement in the home to prevent soot particles from being imbedded into upholstery and carpets. Keep hands clean. Soot on hands can further soil.
Tenement Housing 1800’s. Crowded Street Dumbbell Tenement was the most popular.
6/11/ Module 5 Planning the Job. 6/11/ Module 5 Overview — Evaluate the property — Evaluate the job — Schedule the work — Choose the right.
Planning Living Areas.
Managing Care and Upkeep. Saving Money Caring for possessions makes them last longer and stay in better condition Caring for possessions makes them last.
6/11/ Module 2 Set-Up Your Workspace to Contain Lead Dust.
Finishing the Building
Wildfires. Facts About Wildfires Wildfires are usually triggered by lightning or accidents Wildfires spread quickly igniting brush, trees, and homes.
Room Relationships and Sizes
Objective 9.01: EXPLAIN the benefits of interior home care.
*Baby-Proofing* Make your home safe for your child.
Basic Cleaning Tools and Procedures
Michael Kruse Chance Guthrie If we use the money wisely then the specifications of the house will be met. And we could build a house that meets the requirements.
October Module 6: Cleaning Activities and Checking Your Work Overview What is effective cleanup? Interior cleaning techniques. Exterior cleaning.
Objective 1.03: Explain ways to adapt housing to meet special needs.
9/30/ Module 4 Clean-up and Check Your Work.
Should we pay more on air pollution? Yayu Yu Policy Speech April 27, 2007.
Electrical Plans.
Objective 1.03: Explain ways to adapt housing to meet special needs.
LIVING AREAS. Living area Part of the house that friends and guest see. It is usually a place of show, recreation and entertainment. It roughly consumes.
7 Planning the Living Area Chapter. Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the three.
Floor Plan Sketch on 17” x 22” Graph Paper  Rough Scale Drawing  Room dimensions  Room Names  Basic House Characteristics AutoCAD floor plan including:
October Module 5: During the Work Overview: Traditional renovations create airborne dust. Prohibited practices. Protect yourself and make a personal.
The exterior rebuild is nearly complete. We are about finished with the first fix in the classrooms and toilets. All the flooring, fixtures and fittings.
 Where the family sleeps, rests, and bathes  Takes up about 1/3 of the house  Should be in the quietest part of the house  Should be on the south.
Chapter 21 Roof Plan Layout. 2 Links for Chapter 21 Lines and Symbols Materials Drawing Roof Plans.
Lead Poisoning Judith M. Khanuja, MPH Student Walden University PH 6165 Instructor: Dr. Stephen Arnold Spring Quarter, 2009.
Residential planning. Zones Social: public area and most used portion of the home. Comprised of the entry, family room, living room, media room, game.
A HOUSE.
Drawing Floor plans.
Presented by: NAME HERE
WORKSITE PREP AND THE DECON
Public and Private Area Landscaping
Portfolio Activity Find 5 pictures of bedrooms/master bedrooms (with bathroom) that are appealing to you Paste in portfolio and label desirable features.
Area and Perimeter.
Area and Perimeter.
realestatemarket.com.
GLOVE BAGGING & PLASTICIZING
EPA Lead Certification Requirements
Area and Perimeter.
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
How to Stay Away from Lead
Area and Perimeter.
Presentation transcript:

9/30/ Module 2 Set-Up Your Workspace to Contain Lead Dust

9/30/ Video Segment: Set-Up Your Workspace  Think about the following points as you view the video  What are the most important things you see to properly set-up a workspace?  What would it take for you to begin doing these practices in your work?

9/30/ Module 2 Overview  What is containment?  Four steps for interior activities  Special considerations for high dust jobs  Two steps for exterior activities  Special considerations for high dust jobs

9/30/ What Is Containment?  Keeping lead-contaminated dust in the work area  Benefits of containment  Protects residents and workers  Easier clean-up at the end of the job

9/30/ Current Interior Set-Up Practices Spread Lead-Contaminated Dust  Reusable drop cloth  Furniture in the room  Open doors and windows  Broom or shop vacuum Do not use these practices when lead is present!

9/30/ Overview of Interior Set-Up Steps  Step 1: Limit access  Step 2: Cover belongings that can not be moved  Step 3: Cover floors  Step 4: Close windows, doors, and HVAC system  Special consideration for high dust jobs

9/30/ Set-up Toolkit  Barriers  Coverings for furniture, fixtures, plants, or outdoor play areas  Other set-up containment items

9/30/ Interior Set-Up Step 1: Limit Access  Instruct residents to stay away from work area  Do not allow small children (under 6 years) or pets near work area  Place a barrier or tape across entrances  Do not allow eating, drinking, or smoking in the work area

9/30/ Insert illustration here Interior Set-Up Step 2: Cover Belongings  Cover furniture and objects in protective sheeting  Furniture  Carpet  Lamps, pictures, and other fixtures

9/30/ Interior Set-Up Step 3: Cover Floors  Cover floors with protective sheeting  At least five feet on all sides of work area  2nd smaller layer if using chemical strippers  Place a tack pad at edge of protective sheeting, lay protective sheeting on frequently used walking paths to outdoors and bathrooms 5’

9/30/ Interior Set-Up Step 4: Close Windows, Doors, HVAC  Close and seal all windows and doors  Close and seal HVAC vents

9/30/ Special Considerations for Interior High Dust Jobs  Remove furniture, fixtures and belongings from work area  Cover door openings with a 2 layers of protective sheeting to form an “airlock”  Close and cover HVAC vents

9/30/ Special Considerations For Interior High Dust Jobs  For work on removable objects that create lots of dust  Select a room that can be easily closed off  Follow Steps 1 through 4 for interior set-up  Follow the procedures for high dust jobs

9/30/ Current Exterior Set-Up Practices Spread Lead-Contaminated Dust  Ground uncovered  Reusable drop cloth  Paint chips  No barriers  Windows and doors open Do not use these practices when lead is present!

9/30/ Overview of Exterior Set-up Steps  Step 1: Establish work area  Step 2: Close windows and doors  Special considerations for high dust jobs

9/30/ Exterior Set-Up Step 1: Establish Work Area  Cover the ground with protective sheeting  If space permits, extend at least 10 feet from work area  Cover nearby vegetable gardens and children's play areas  Limit work area access  Establish a 20 foot perimeter around work area if space permits 20’

9/30/ Exterior Set-Up Step 2: Close Windows &Doors  Close nearby doors and windows within 20 feet of the work area

9/30/ Special Considerations For Exterior High Dust Jobs  For high dust jobs:  Cover doors and windows with protective sheeting  Use the two-layer protective sheeting system to cover the door  For multi-story jobs, attach protective sheeting to scaffolding to cover house entrance