111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester 2009 -2010 Building.

Slides:



Advertisements
Similar presentations
MOSAICS. We are going to be designing and making a Roman Mosaic this term. You will learn how Romans made mosaics Plan and Design your own Mosaic Make.
Advertisements

Materials And Construction Technology PALESTINE UNIVERSITY Chapter No. 6 Tiling.
NGfL CYMRU GCaD FLOOR COVERINGS.
Dehradun DEHRADOON PHASE – I *All inclusive cost *Including Car parking *Club Membership Extra Registration amount i.e. Rs 100,000/- +10% of cost price.
Cabinets -4- Countertops.
Creating Interior Backgrounds
Dr. Nihad Almughany University of Palestine
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2 nd Semester Introduction.
Steps Toward Decent, Affordable Housing Habitat for Humanity in Amecameca, Mexico ©, 2006 © Scott Moore, 2006.
Example (10.2): Redesign the stair shown in Example (10.1) if it is a cantilever type of a clear span of 1.6 m. Solution : Minimum stair thickness required.
Dr. Nihad Almughany University of Palestine
Ken YoussefiMechanical Engineering Dept., SJSU 1 Fundamentals of Casting Casting, one of the oldest manufacturing processes, dates back to 4000 B.C. when.
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
BUILDING MATERIALS. INDEX 1- Title Index Building materials
Dr. Nihad Almughany- Design Principles- 2nd sem Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept.
Dr Nihad Almughany - Fall Sem Dr Nihad Almughany- Introduction to Interior Design Dr. Nihad Almughany University of Palestine Faculty.
Class Day Thirteen. Chapter 9 Stone & Concrete Masonry.
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
University of Palestine Faculty of Applied Engineering
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
University of Palestine Faculty of Applied Engineering
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Floor Covering unit 6. Floors and Flooring Of all the furnishings in a room, the floor receives the most abuse. Numerous materials are used for flooring.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Sound transmission Partition assemblies are measured according to their STC (Sound Transmission class) Commercial projects typically have more stringent.
CONSTRUCTING A FIVE CABIN LATRINE
11 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2 nd Semester Introduction.
FLOORSFLATSTOTAL AREA FIRST SECOND THIRD ST, 2 ND & 3 RD FLOOR PLAN FLOOR PLAN OF 2 BHK LUX. APARTMENT ON PLOT NO.
Coating schemes for different areas Waterproofing of Terrace Application Procedure: General: STEP 4 Clean, dust free surface, ready for application of.
ARCH 243 CLADDING OF WALLS. CLADDING / VENERING OF WALL SURFACES PLASTER STONE CERAMIC –BRICK METAL GLASS PLASTIC WOOD.
MATERIALS & CONSTRUCTION TECHNOLOGY MATERIALS & CONSTRUCTION TECHNOLOGY PALESTINE UNIVERSITY Second semester Dr. Ali I. Tayeh.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Prepared by Dr. Hazem Abu-Orf, University of Palestine International Design Studio III Lecturer 6 Project II Criteria deemed essential for the design of.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
Dr. Nihad Almughany- Theory of Architecture 1 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture,
FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
TILES. Common Tiles Uses: roofing, flooring, paving, drains, walls Encaustic Tiles Uses: decorative purposes in floors, walls.
Objectives At the end of the lesson the students are expected to: 1. Examine the different cleaning chemicals and familiarize with the different tools.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
 Mosaics date back as far as Ancient Greece (4 th century BC). Well-to-do Greeks of the 4 th century had their floors covered with elaborate mosaics,
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
1 CASTING DEFECTS Submitted to, A.R.Patel M.K.Patel Submitted by, Jaymin Panchal Subject : MP-II.
Different Types of Bathroom Tiles
Objective 4.02: CLASSIFY floor treatments
Foundations of Technology Construction
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
BUILDING CONSTRUCTION
Residential Wall Systems
Building Structural Systems
SURFACE FINISH.
Construction Project Management
FLOORS Introduction: The purpose of a floor is to provide a level surface capable of supporting the occupants of a building, equipment and sometimes internal.
ART 3&4: Final!!! Part 1: History+Clay
Supplier of Indian Impala Black Granite London UK Imperial Exports India
Residential Wall Systems
FINISHES (FLOOR, WALL & CEILING)
How to install pavers..
Brick A fired clay masonry product..
Foundations of Technology Construction
Video: Can Your Define Mosaics?
Information related to Chapter 7 in the textbook
Presentation transcript:

111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building Construction II (EAAS 3202 ) Lecture 9 Tile Works أعمال التبليط

22 Review of Last Lecture –Fireplaces Types of Fireplaces Function of Fireplaces Elements of the Fireplace Rules for building a fireplace

33 Tiles Works –Types of Tiles : Natural: –Marble ( Italian, Khalili, Karara, Granite, Perlato ) –Wood Manufactured: –Perlato –Mosaic Tiles –Terrazzo tiles –Interlock Cement Tiles –Ceramic –Porcelain –Mosaics –Linoleum, carpet, …. Etc.

4

5

6

7

88 Tiles Works –Location of Tiles : Floors ( Interior – Exterior ) Walls Sills Stairs Roads Sidewalks

99 Tiles Works –Stages of Tile works : Manufacturing of tiles Tiles supply Preparatory works –Plumbing and mechanical works –Electrical works –Wood frames Tiling Finishing

10

11 Tiles Works –Installation of Tiles ( Floors) : Preparation of Tiles: –Supply to site –Sinking in water Preparation of Floor: –Floor base –Sand ( dry and clean) 4 cms –( Mfalfala ( cement and sand) under ceramic tiles ) Mortar: (2-4 cms) –Cement (1) + Sand (3) + Lime (.5 ) + water –Use of white cement in case of light color tiles like Karara tiles Leveling: –Use of levels ( ( الودعات –Consider entrance level, Gal traps and networks levels. –Consider the slope especially in bathrooms and kitchens and in external works Pattern : Consider the pattern of tiles used – extension – Where to start

12 Tiles Works –Installation of Tiles ( Floors) Continued : Tiling: –Fix the tile on mortar –Tiles must be leveled according to the required level –Joints are equal, Perpendicular and Parallel –Use of cutting machine in cutting tiles –Do not walk on tiles or load it before they are dry. –Fill the ends and fix the skirting perpendicular to the floor. Filling the Joints الترويب: –Clean the tiles and the floor, spray water and fill the joints with cement filling with appropriate color. –Remove extra filling –Spray water –Cleaning or polishing tiles

13

14

15

16

17

18

19

20

21 Tiles Works –Installation of Tiles ( Walls) : Preparation of Tiles: –Supply to site –Sinking in water Preparation of wall: –Remove additions and fill holes as in plaster –Add scratch and brown (1 st layer) plastering layers Mortar: (2 cms) –Cement (1) + Sand (3) + Lime (.5 ) + water –Use of white cement in case of light color tiles like Karara tiles Leveling: –Use of levels ( ( الودعات –Consider fixed levels such as worktops, bathtub, … etc. –Consider the verticality of the tiles Pattern : Consider the pattern of tiles used – extension – Where to start

22 Tiles Works –Installation of Tiles ( Walls) - Continued : Tiling: –Fix the tile on mortar –Tiles must be leveled according to the required level –Joints are equal, Perpendicular and Parallel –Use of cutting machine in cutting tiles –Do not load tiles before they are dry. –Use the Plastic or metal angles on projecting corners. Filling the Joints الترويب: –Clean the tiles, spray water and fill the joints with cement filling with appropriate color. –Remove extra filling –Spray water –Cleaning or polishing tiles

23

24 Tiles Works –Installation of Tiles : Sills Stairs Wooden floors Linoleum, carpet, … etc. Ornaments in tiles External interlock tiles

25

26 Tiles Works –The role of the engineer : Physical inspection of tiles when supply: –Homogeneous –Edges –Surface shape and level –Cracks and voids ((التنميل – التشعير – التفليق – التقشر – التنقير – الانفصال –Dimensions Laboratory testing: ( ( الفيزيائي – البري – الامتصاص - الكسر Before tiling: –Define level –Inspect all networks required –Define pattern During Tiling: –Mortar –Levels After Tiling: –Level –Edges –Joints –التطبيل – التسنين – انفصال البانيل – انفصال السيراميك