Fullerton College Physical Education Project Community Meeting March 11, 2009.

Slides:



Advertisements
Similar presentations
Championing for the Future. Identified need for a booster organization to support school districts athletic programs First official meeting held November.
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
US Athletic Department Organization Ryan Smith – Upper School Athletic Director Steve Hamel - Assistant Athletic Director - Transportation Director Dave.
Background PFI (Private Finance Initiative) School to be built by Miller Construction Government Funded Supported by the Local Authority School is designed.
Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.
Fletcher Park Renovations 1. Existing Conditions.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
UBC Athletics and Recreation – Facilities overview / Master planning.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
C H A P T E R 19 Applied Sport Finance Chapter 19.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Kelly Bresnowitz Jamey Hogarth Rachel Lacek.  Elizabethtown College has been growing since it opened in  Enrollment increases faster than facility.
Chapter 9 FACILITY MANAGEMENT.
June 29, Discuss preliminary vision for St. Vincent’s Open lines of communication Share information as previously committed Seeking your input in.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
I am a conscientious consumer and can locate health services in my community *King county Aquatic Center Swimming pool *Federal way Community center *Fitness19.
EMPIRE FITNESS CLUB Rodney Bettcher Matt Schwitz Steve Clancy.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
HOME OF THE U.S.A. NATIONAL TEAM DEVELOPMENT PROGRAM (USANTDP) Leah Trattles Mike Pilcher.
February 23 rd, 2012 Group Members: Justin Fleischmann, Christian Pitts, Kathy Thompson 1.
General Info. And History Established 1867 as the Illinois Industrial University Renamed the University of Illinois in 1885 It is a public research-intensive.
North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Slippery Rock University Facility Overview. General Information  Located less than 1 hour from Pittsburgh.  Located 1 hour from Erie.  Located 10 minutes.
Transportation: Bus Line, personal vehicles, parking lot 250 parking spaces. Location: Ave, Edmonton, Canada Olympic-sized ice surface: 210.
1 Advisory Group Meeting October 4, Topics to Be Discussed Overall Plan Overall Plan Review of Three Site Visits Review of Three Site Visits Congregation.
Wisdom and Power A Comprehensive Campaign for Owl Athletics Kennesaw State University.
Lake Chelan Aquatics & Community Center Vision With A View
Fee Usage & Accountability Presentation Department of Athletics.
STUDENT WELLNESS CENTER DESIGN Presented by: Parke Martin, Zachary Karasek, Ryan Shirk.
SMHa/CGD/TT c r o s s h i g h s c h o o l b e r k e l e y c o u n t y s c h o o l s addition + renovations phase 2.
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
Keyport Public Schools Facility Planning 12/02/15.
Stan Sheriff Center Ground breaking December 1992 Many activities in and around the Center First named Special Events Arena now called the Stan Sheriff.
RA Online Training UMass Dartmouth Athletics. UMass Dartmouth Athletic Department Fast Facts  Mascot: Corsairs  Mascot’s name: Arnie  Website:
BAKERSFIELD COLLEGE 2016 BOND PRESENTATION SESSION #1 1.
Proposition S “Students First” Election Day, Tuesday, April 5.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
General Info. And History Established 1867 as the Illinois Industrial University Renamed the University of Illinois in 1885 It is a public research-intensive.
South Greenville Recreation Center and Park Master Plan.
Norris Public School District Outdoor Activity Facility Planning Report August 16, 2012.
6/27/ Armistead Pointe Park – City Council Work Session City of Hampton. Guernsey Tingle Architects. 22 January 2014.
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
New Faculty and Staff Orientation Presentation
Cornwall Central School District
ELYRIA MULTI-SPORT ATHLETIC COMPLEX
Facilities Update November 17, 2017
WOU Budget Committee February,
Huntsville City Schools Huntsville High School Softball
Cornerstone Corporate
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
University of Wyoming Department of Intercollegiate Athletics
Prepared By: Amy Fogg, Jill Kuenne, Jena Laolagi, and Devin McElvogue
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Draft Bond Work Plan A Presentation to the
Dixon Middle School Project Update
Presentation transcript:

Fullerton College Physical Education Project Community Meeting March 11, 2009

Discussion Items  Community Concerns  Initial Study – CEQA Requirements  Status of Project Lighting Bleachers Sound System Traffic  Project Phases  Project Budget

N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Phase 1 Olympic Pool 50 Meter Pool Replaces Old 25 Meter Pool 1 Meter and 3 Meter Springboards Pool Pump House Building Fire Pump Building Serves as Additional Fire Protection to Campus Tennis Courts Refurbished New Fire Lane FIRE LANE Fullerton College Athletics Project

N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Phase 2A Artificial Turf Fields Football, Soccer and Track and Field per NCAA Standards 1,500 Seat Home Bleacher & Pressbox 500 Seat Visitors Bleacher Six 100 ft. Light Poles with Directional Reflectors  76.6 footcandles for games (30 footcandles for simple use)  0.6 footcandles at 100 ft east (1.5 footcandles on vertical)  0.16 footcandles at 150 ft east ( 0.5 footcandles on vertical) Fieldhouse 20,000 sf / 2 Stories Locker Rooms/Training Field Support Services 3 Classrooms 10 Offices 6 Workstations Roof Plaza Assembly Space (1,800 sf) 60 New Parking Stalls Fullerton College Athletics Project Level 2 Level 1 Light Pole Reflectors

Phase 2C Dance Studio New Lighting and A/C Refinished Floors and Paint Corridors New Lighting, Floors, and Paint Restrooms Storage Phase 2B South Gym New Lighting and A/C Refinished Floors, Paint Refurbished Basketball Equipment Women’s Locker Room New Lighting and Ventilation Refurbished and New Showers New Dedicated Team Rooms New Bathrooms Coaches Locker Rooms Officials Changing Rooms Equipment Storage Fullerton College Athletics Project

Phase 2D North Gym New Power Retractable Bleachers w/Assistive Listening Refinished Floors New Lighting and A/C Mezzanines Renovated for Multi-Purpose Use New Lights, A/C & Paint (16) Offices & (2) Meeting Spaces New Storage Men’s Locker Room New Lighting and Ventilation New Lockers Refurbished and New Showers New Dedicated Team Rooms New Bathrooms Phase 2E Outdoor Sports Court New Sand Volleyball Pit New Basketball Half-Court Refurbished Strength Lab Expanded Training Facilities New Circuit Lab Fullerton College Athletics Project

N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Additional Work Playing Field Bleachers/Pressbox Jump Events Signage Throwing Field Doors Security Access Hardware Value Engineering Dance Studio Floor Repair Ballet Bars South Gym Bleachers Fullerton College Athletics Project

Project Cost Construction Cost Pool $ 5,227,300 PE South Gym 4,651,200 Firelane 659,600 PE North Gym 4,033,100 Fieldhouse 9,079,600 Sub Total $ 23,650,800 Field Lighting $ 461,500 Bleachers799,000 Field Improvements2,900,400 Sub Total $ 4,160,900 Architect Fees & Other Consultant Fees $ 7,511,500 Total Project Cost $ 35,323,200