Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.
THIS PRESENTATION HAS BEEN UPLOADED TO THE WIKI. Motors, Controllers, and Regenerative Braking.
Start S2S2 S3S3 S4S4 S5S5 Goal S7S7 S8S8 Arrows indicate strength between two problem states Start maze … Reinforcement learning example.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Goal: To understand the basics of capacitors Objectives: 1)To learn about what capacitors are 2)To learn about the Electric fields inside a capacitor 3)To.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
CLIC Breakdown Workshop – CERN, May / 13 Delay Times in Breakdown Triggering CERN, TS-MME Antoine Descoeudres, Sergio Calatroni, Mauro Taborelli.
Charge collection studies on heavily diodes from RD50 multiplication run G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
CAREER PLANNING Is a life long process a person goes through to learn about himself, develop self concept & learn about career choices.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
TRT workshop Argon Xenon mix stability Kramarenko Viktor Vorobev Konstantin 10/12/2015.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Test of HV Prototype Boards for LHCb Outer Tracker NIKHEF, Amsterdam The Netherlands
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Detector Control System ELMB Production ATLAS DCS Evolution Different versions of ELMB Production strategy Radiation Qualification Testing Quality Assurance.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Low Resistance Strip Sensors – RD50 Common Project – RD50/ CNM (Barcelona), SCIPP (Santa Cruz), IFIC (Valencia) Contact person: Miguel Ullán.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
WEEK 1 You have 10 seconds to name…
HV boards 1.FIRST ASDBLR HV PROTO BOARD: leakage currents on 100nA CH, humidity at cern. 2. TRIAL 1 Encapsulate caps in Printed Circuit Board C schock,
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
ATLAS TRT Duke University CERN, Feb Barrel Capacitors  With socket and bent pin, forms capacitor assembly  Duke supplies capacitors, Hampton assembles.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
7. Direct Current circuits. 11 Find the currents, which flow in all the wires of the circuit in this figure 12  9 V 6 V b a cd 18 
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Energy Stored by Capacitors Last lesson we plotted the graph of Charge against voltage for a capacitor and learnt that the gradient of the graph represented.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.
Objectives: 1. Define and calculate the capacitance of a capacitor. 2. Describe the factors affecting the capacitance of the capacitor. 3. Calculate the.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.

Diamond Sensor Tests for the CMS BCM Alexandr Ignatenko FCAL collaboration meeting May 7, 2008.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
EdTechNJ eBoard STEM Education Platform The Symbols of Electric Components.
Rad hardness tests – Sept. 2003
Electric Circuits Fall, 2014
BSS Prep work at CERN and Acceptance of Parts
Some proposals on HV circuits realization for segmented straw detector
Radiant Technologies, Inc. March 29, 2018
الأستاذ المساعد بقسم المناهج وطرق التدريس
Capacitor Assembly K. McFarlane 9/30/02 9/30/2002 TRT meeting Oct 2002
זכויות סוציאליות.
EDLC(Embedded system Development Life Cycle ).
First choice Experiment Or Quasi-experiment.
HV capacitor Testing.
Work Breakdown Structure Tasks and Sub-Tasks
C.2.10 Sample Questions.
C.2.8 Sample Questions.
T-489: Induced Activity and Residual Dose Rates
C.2.8 Sample Questions.
Lesson 3. Controlling program flow. Loops. Methods. Arrays.
Presentation transcript:

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN  Two tasks  Capacitor testing (Duke)  Capacitor preparation (Hampton)  Capacitors under testing  Johanson surface mount  1000pf, rated 2000 V, size 821.  Material : X7R  Choices are limited due to space  Capacitors from four different lots (batches).  ~Two years ago, the same capacitors (from different lots) were radiation tested at CERN and the results were mixed.

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV testing  HV cycle  Connect 30 capacitors from each batch to HV=2000 V and discharge.  Measure the total capacitance every 50 discharges.  Number of cycles : 2000  Results  Batch 1  One capacitor –Surface HV breakdown during cycles –Inner HV breakdown during cycles  Batch 2/3/4 : No problem  Conclusion : Pass

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN  Test setup

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Plan  Repeat the same test with capacitors from HU (encapsulated and legs are attached)  Long term test  30 capacitors from each batch connected to HV=2000 V and current is monitored.  Irradiation test – CERN  Requirement : All capacitors from all batches should pass.  Decision by the end of There should be no problem in getting the capacitors (~6 weeks).  Radiation test on ~100 random samples once the production batch is available  Option in case of failure  Go to lesser capacitance with different material (NPO)