© Copyright 2014. High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

© Prentice Hall CHAPTER 15 Managing the IS Function.
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Chapter 6 Enterprise e-Business Systems.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Chapter 15: Packaged Software and Enterprise Resource Planning
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall 1 Managing Information Technology 6 th Edition CHAPTER 11 METHODOLOGIES FOR PURCHASED.
Hillyard – Vektr CQI ™ Continuous Quality Improvement Hillyard Inc. has partnered with Nuvek LLC, to gain hosting capabilities for a new and innovative.
Chapter 3 Project Initiation
System Analysis and Design
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Chapter 8 Information Systems Development & Acquisition
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Fundamentals of Information Systems, Second Edition
Information Systems In The Enterprise
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Staffing Discussion SES Chicago, Dec Dave Williams, Chief Strategist and Co-Founder.
Information Systems Development : Overview. Information systems development practice Concept and role of a systems development methodology Approaches.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Design, Implementation and Maintenance
VENDORS, CONSULTANTS AND USERS
Chapter 9: Software Tools and Dashboards. 2 V. Kumar and W. Reinartz – Customer Relationship Management Overview Topics discussed  CRM Implementation.
Module 3: Business Information Systems Enterprise Systems.
CORPORATE PROFILE
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Succeeding with Technology Systems Development An Overview of Systems Development Tools and Techniques for Systems Development Systems Investigation Systems.
Competitive Differentiation: Using Technology to Deliver on Staples EASY Brand Promise Scott Floeck, Sr. Vice President, Staples, Inc.
Outsoursing in Banks. Traditional Reasons for Outsourcing.
Ascentrics Consulting Group, Inc. Helping leaders orchestrate business successes Colleen Burke, President Ascentrics Consulting Group, Inc.
18 Chapter 18: Packaged Software and Enterprise Resource Planning Systems Analysis and Design in a Changing World, 3 rd Edition.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Accounting Information System By Rizwan Waheed M.Com 710.
System Selection Dania Bilal IS 592 Spring The Selection Process Review the literature Read the Automated System Marketplace survey for the last.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
The Real costs of ERP Systems. Slide 2 Selection Criteria Aberdeen survey of 1,680 companies Functionality (74%) Total costs of ownership (52%) Ease of.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Concepts in Enterprise Resource Planning Fourth Edition Chapter One Business Functions and Business Processes.
Concepts in Enterprise Resource Planning Fourth Edition
- Exploring Needs - ERP SOLUTION A Brief Look ”Provide competitive advantage to our clients through the implementation of our business enterprise information.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 11: Alternative Approach - Purchasing Systems.
11 i Upgrade: Is an Assessment Useful for Your Company? By: Bernard Doyle, Applications Software Technology Corp. Marie Klein, Information Resources Inc.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
Systems Analysis and Design in a Changing World, Fifth Edition
Principles of Information Systems Eighth Edition
TeleManagement Forum The voice of the OSS/BSS industry.
Enterprise Resource Planning
Initiating systems development
Your customer base is at risk!
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
VENDORS, CONSULTANTS AND USERS
Construction and Materials Management System
Systems Development An Overview of Systems Development
Capitalize on Your Business’s Technology
Presentation transcript:

© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH PERFORMANCE CONCEPTS, INC. 151 Village Parkway Building 6 Marietta, GA Phone: Fax:

© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection Business Benefit Achievement Cost and Terms Enthusiasm of Key Personnel Product & Vendor Risk Vendor Quality Assurance On-Going Support Vendor References and Reputation Vendor Financial Strength Implementation Ease of Implementation Implementation and Training Technology Functional Capabilities Technical Direction Ease of Integration

© Copyright High Performance Concepts, Inc. Benefit Achievement Can this software and vendor help you achieve the benefits you need? In what percentage of the installed base has this vendor “delivered on” the benefits? Is the vendor willing to put benefits in the contract? Pay for performance Schedule milestone achievement Make sure the customers of the software vendor have achieved real business benefits. $

© Copyright High Performance Concepts, Inc. Cost and Terms Cost is a major factor for most companies Payment terms often play a major role For multi-site, multi-license implementations, payment terms should reflect the use the company gets from the software –Buy as you implement –Pay as you buy Some movement toward pay for performance Linking payment to major milestones will assure that the vendor is with you all the way.

© Copyright High Performance Concepts, Inc. Enthusiasm of Key Personnel If a key leader has a strong preference among viable alternatives, then go with that vendor Funding of the purchase will go more smoothly Provisioning of resources will be made easier Leader is more likely to get personally involved Follow a knowledgeable leader.

© Copyright High Performance Concepts, Inc. Functional Capabilities Specified in requirements document Weighted for importance Focus on special, unusual and important functionality Make vendor RFP answers contractual Buy what exists, not “vaporware” –By process or module –General Consider future upgrades and growth path –Consider near-term future functionality –A major benefit of vendor-developed software is the continuous functionality improvement via upgrades –Know the vendor history on software improvement and module expansion A weighted list of critical requirements provides a GO/NO GO tool for differentiating among vendors.

© Copyright High Performance Concepts, Inc. Technical Direction Upgradability and growth path Platform & operating system Database management Application development tools Integration –Within the application –With other applications –With the Web Network support Data exchange Networking Security Mobility Scalability Make sure the vendor’s technical direction matches that of your company.

© Copyright High Performance Concepts, Inc. Ease of Integration Integration with: –Other planned supply chain systems –Existing supply chain systems –Marketing, engineering and financial systems Vendor resources to enable integration –Personnel –Integration tools –Automated Programming Interfaces (API) Technical architecture –Openness –Alignment with your direction –Automated program interfaces –Application development tools Ease of integration can make or break your implementation.

© Copyright High Performance Concepts, Inc. Ease of Implementation Never really easy, just degrees of difficulty Technical and functional implementation Implementation requires a lot of effort Made more difficult by business realities –Limited time –Limited resources –Limited budget Vendor resources/tools can make a difference Include questions in reference checks: –How long to implement –How many company resources –Actual expenditures Ease of implementation may best be measured by the time and resources required vs. those which were expected.

© Copyright High Performance Concepts, Inc. Implementation and Training Resources, Plans and Methods Vendor able to meet your schedule Resources for implementation and training –Vendor –Internal Project methodology and planning tools Vendor personnel –Knowledge of the software –Knowledge of your business –Capabilities and special skills which you need –Capacity to get the job done –Availability to meet your schedule –Professionalism Both internal and external resources are critical to the success of your implementation.

© Copyright High Performance Concepts, Inc. Vendor Quality Assurance System to run your business has to work Learn about how the vendor manages: –Software package development –Interface and enhancement development –Software “fixes” and upgrades –Hiring of implementation consultants –Implementation projects Is this vendor a quality vendor? Will the system perform? OR

© Copyright High Performance Concepts, Inc. On-Going Support Maintenance and Upgrades –Packaged software –Interfaces –Modifications Help Desk support –Technical and user support –24 * 7 –Geographic coverage –Unlimited use –Included in software maintenance fee Vendor support will be critical to keeping users happy and the system running smoothly.

© Copyright High Performance Concepts, Inc. Vendor References and Reputation Get references –In your industry –In your geographic area –Some who had problems –Technical and user representatives Check them -- go visit if possible Know what you want to learn Document Use the reference checks to make your decision and to improve your implementation plan.

© Copyright High Performance Concepts, Inc. Vendor Financial Strength and Long-Term Business Prospects Has the vendor been profitable for the past 5 years? Is the vendor growing? What are the vendor’s future prospects? How are they managing their growth? Is there any chance they will be acquired? To consider the vendor as a business partner, assure that there will be a business with which to partner.

© Copyright High Performance Concepts, Inc. For More Information Please contact: Brian Savoie Vice President High Performance Concepts, Inc. Cell: