©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – November 2011.

Slides:



Advertisements
Similar presentations
IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Advertisements

SWE IG Meeting Paris, CRE XBID Overview Supported by.
Roadmap for Sourcing Decision Review Board (DRB)
How to commence the IT Modernization Process?
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Ensure Vendor/Engineer of Choice Product Quality
Project Management Framework May 2010 Ciaran Whyte Risk Administrator Planning & Strategic Projects Unit.
P ROJECT S TATUS S UMMARY. Insert Date Presentation Title Goes Here Sample Project Status/Schedule Summaries In addition to managing a project plan in.
Presented by: Kreg McCall. Baseline Management & Control Define Baseline Baseline Types How to Generate a Baseline Baseline Setup for Success Baseline.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Dean Cox Naval Undersea Warfare Center, Keyport Capability maturity model integration CMMI FOR Washington state university 16 September 2009.
By Saurabh Sardesai October 2014.
Delivery Methodology.
SmartMeter Program Update - Operational Benefits Realization - Jim Meadows, Program Director August 2007.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – January 2013.
Office of Project Management Metrics Report Presentation
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – February 2012.
© 2007 PPL Electric Utilities Energy Outlook: 2008 and Beyond Small Business Development Center Lehigh University November 7, 2007 Tom Stathos PPL Electric.
Qantas Brand Refresh Kristy Dixon – Masters of Applied Project Management University of Adelaide 2013 Results of Risk Analysis Plan Hypothetical Project.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Service Transition & Planning Service Validation & Testing
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission _.
September 25, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
An Overview of the Smart Metering Programme in GB.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2011.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – January 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
1 Project Update and Summary of Project Priority List (PPL) Activity November 12, 2015.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – March 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
SIP Report – Nov 2017 Overview Headlines Workstream report
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
UGI Utilities SAP 1 Year Later Update
Raytheon Parts Management
Procurement Management Information System (PMIS)
SmartMeterTM Steering Committee Update – September 2012
Amendment Invoice Task Force Progress Report
ctclink Steering Committee
SmartMeterTM Steering Committee Update – March 2013
SmartMeterTM Steering Committee Update – June 2012
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
SmartMeterTM Steering Committee Update – July 2012
Amendment Invoice Task Force Progress Report
SmartMeterTM Steering Committee Update – February 2013
Amendment Invoice Task Force Progress Report
SmartMeterTM Steering Committee Update – November 2012
Amendment Invoice Task Force Progress Report
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Amendment Invoice Task Force Progress Report
XRN 4927 – MiR Drop 4 - Status Update
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – November 2011

2 Steering Committee November 2011 Report Agenda ► Monthly Updates ► Release Status Update ► Deployment Status Update ► Schedule Update ► Deployment Update ► Budget Status – Expenditures by Workstream ► Budget Status – Benefits ► Issues / Risks Summary ► Program Metrics ► Appendix ► Project Deployment Plan Progress ► Contingency Reconciliation ► SmartMeter TM Acronyms

3 Steering Committee November 2011 Report Release Status Update Challenges Actions/Status EACFunded BudgetITDScopeScheduleResourcesIssuesRisks IT Releases: October 31, 2011 Release 1 Release 2 Release 3 Overall IT continues to execute against the plan produced as output from the Reconstruct effort. HAN enablement and Peak Time Rebate roadmaps are in progress. Release 1 – Provide model office, exception management for interval billing, and performance & scalability improvements. Release 2 – Complete the integration of SmartMeter TM data to the existing outage systems. This includes using the meter “last gasps”, “Restoration” and meter ping capabilities. Added electric head-end system upgrade to scope of this release to enable Secure Port and firmware push. Remote Connect/Disconnect phase 2 (RCD) and performance and scalability improvements are also part of this release. Release 3 – Improvements to meter data exception handling, NEMs deployment, scalability improvements for the data warehouse, and tracking of momentary outages. Overall ▪ Holding to the overall scope/schedule/budget defined in Reconstruct. ▪ Stabilization, testing and deployment work in process. Release 1 ▪ Deployment of Release 1 on 7/29/11 with no issues. Release 2 ▪ Deployment of all components as planned, with deployments completed on 9/30. ▪ Stabilization complete for all components except RCD which is still underway. Release 3 ▪ EM, CCO, NEMS/MV90, EON and Outage build and test complete. ▪ NEMS is behind schedule but plans for recovery are in progress. ▪ Deployment planning in progress for all functions. ▪ Currently on schedule for all in-scope functionality to deploy by 11/30.

4 Steering Committee November 2011 Report Deployment Status Update Actions/Status Challenges EAC2011 Forecast (2011 EOY / CPI) ScopeScheduleResourcesIssuesRisks Deployment: October 31, 2011 Endpoints (2011 YTD) Gas Network (2011 YTD) Electric Network (2011 YTD) Endpoints ▪ Targets based on original deployment schedule to complete 2 million meter installations in ▪ Increased rate of installation contractor ‘Unable-To-Complete’ due to non- standard meter installations in heavy urban areas and access refusals. ▪ Cost-per-install higher than planned due to resource mix. ▪ No Gas T&R resources available to deploy ~6,600 oil-filled gas rotary meter module installs this year Electric Network ▪ Complete electric network deployment, initial design scope. ▪ Requirement for additional electric network to complete network coverage is subject to ongoing review. Gas Network ▪ Complete gas network deployment, initial design scope. ▪ Requirement for additional gas network to complete network coverage is subject to ongoing review. Endpoints ▪ Installation contractor preparing Rev 15 schedule which will increase scope and resources; still short of overall 2011 endpoint goal. ▪ Executing urban customer access, non-standard installation and customer outreach processes. ▪ Working with Sourcing to secure additional third party resources. ▪ T-300 team assigned to deploy oil-filled gas rotary meter modules. Deployment began in late-September. Electric Network ▪ Transition of Network Deployment and Operations to SmartMeter™ Operations Center completed. ▪ Electric network deployment, initial design scope, confirmed as complete. ▪ Working with technology supplier and internal stakeholders to address network coverage in ‘hard-to-reach’ areas. Gas Network ▪ Transition of Network Deployment and Operations from to SmartMeter™ Operations Center completed. ▪ Gas network deployment, initial design scope, confirmed as complete.

5 Steering Committee November 2011 Report  Legend Office Closures (ITD) Schedule Update Benefits Field Delivery Approved Milestone (delay)  ‘Initial Design’ Network Deployed Meter Reading Reductions (ITD) As of 10/31/11 Forecasted Milestone (delay) Milestone MetBaseline Milestone Forecasted Milestone (early) Milestone TBD 2011 Office Closures 537 Positions Captured 2.0M Meter/Module Installations, 2011 Jun IT Release Deployment Release 2 Release 3 SM Operations Center HAN Enablement Release 1 DecFebJan Apr May Mar Oct Sep Aug Jul Nov Dec SMOC Phase 1.0 Deploy 11M meter scalability Remote Connect Disconnect Outage Identify & Scope` Exception Management Improvements and NEMs deploy Exception Management Improvements and Momentary Outage Tracking SE 2.0 standards/HAN restart Performance & Scalability Improvements Exception Management Improvements  Electric ‘head-end’ system upgrade   Interval billing Analyze Phase 1 FSU Upgrade     

6 Steering Committee November 2011 Report Deployment Update As of October 28, 2011 Through Friday, 10/28

7 Steering Committee November 2011 Report 2011 Budget Status – Expenditures by Workstream Year-to-Date Variance Explanations: Favorable YTD capital variance ($45.2M) primarily due to fewer meter/module installations (#3), along with a greater number of 1 st generation SmartMeter early retirements and a journal entry correcting previous gas communication module purchase costs (#4).. Favorable YTD expense variance ($6.4M) due to timing associated with: 1) underruns in Customer of $7.9M (#10) and four additional workstreams totaling $8.5M (#7, #8, #9 and #13), partially offset by a greater number of 1 st generation SmartMeter early retirements and reclass from capital to expense than planned (#12).

8 Steering Committee November 2011 Report 2011 Budget Status – Benefits

9 Steering Committee November 2011 Report Issues Summary Target Resolution Date IssueImpactStatus Summary Ongoing Increasing number of installations affected by access refusals Increased costs, increase in unable to complete (UTC) back- log, customer change management Pursuing operational improvements to increase efficiency of UTC resolution. Ongoing engagement with customers across multiple communication channels to enhance customer understanding of SmartMeter TM journey and benefits. Customer option to temporarily delay SM upgrade being offered. November 2011Supplier Claims Allocation of internal resources to address claims, delivery delays Meeting with suppliers to address and resolve claims.

10 Steering Committee November 2011 Report Risks Summary #Created OnIPScore Prev. Score RiskImpactStatus Summary Assoc. Issue 19/30/ Increased forecast deployment costs and external resources requirement Key drivers: Delays in deployment, resource availability and installation complexity Increased installation costs and contract resources required to complete remaining installations effectively and timely Working with Sourcing and suppliers to complete contracting process. Pursuing other identified opportunities to offset additional installation costs and increase installation efficiency within ongoing operations. 23/22/ SmartMeter supplier product and services cannot meet the deployment schedule. Key drivers: Remaining supplier development activities and resources to complete solutions, insufficient lead time for procurement due to design changes/schedule decisions. Deployment slow/stand down, resource planning ability, and additional costs Supplier solutions for non-standard deployment under development, testing and review. Management of supplier delivery timelines subject to ongoing joint project and supplier leadership review. Focus on remaining deployment dependencies being used to validate integration of supplier product deliveries. 34/4/ Business processes enabled by new technology may not perform as intended. Key drivers: Increased data volume and validation, underlying business processes. Billing errors, customer complaints, inability to meet endpoint deployment goals. Continuing to monitor technology performance and identifying mitigations to resolve any identified technology performance issues. Meter transition process checks updated to include new integrated standards with supplier for validating Network design, meter connectivity and read performance. Planning for Full –Deployment/Interval Billing via functionality deployments and additional process capability initiatives through 2011 underway. 49/1/ Network deployment and performance in ‘hard-to-reach’ areas can not be completed successfully. Key drivers: Network performance in ‘hard-to-reach’ areas and availability of alternate solutions. Deployment delays, resources planning and increased costs. Pursuing resolution of network coverage in ‘hard-to-reach’ areas with technology supplier, including potential alternate network solutions. Finalization of network design/equipment mix to complete network deployment in process with suppliers.

11 Steering Committee November 2011 Report Program Metrics

12 Steering Committee November 2011 Report Project Deployment Plan Progress #s as of 10/31/11

13 Steering Committee November 2011 Report Contingency Reconciliation

14 Steering Committee November 2011 Report SmartMeter TM Acronyms