TRW Automotive December 09 Visit

Slides:



Advertisements
Similar presentations
Database Basics. What is Access? Database management system Computer-based equivalent of a manual database Makes it easy to organize and update information.
Advertisements

Program Management Portal: Overview for the Client
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
Using Track Changes in Microsoft Word Navigating Directions Click on the arrows or the home button located in the bottom right-hand corner of each.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
Kabel Nathan Stanwicks, Head Circulation and Media Services Department Electronic Reserves Introductory Tutorial for Faculty.
Procurement Card Training Strategic Account Management (SAM)
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
Chapter Accreditation Online System Usage Tutorial Department of Member Relations & Grants National Children’s Alliance.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Using Microsoft Outlook: Basics. Objectives Guided Tour of Outlook –Identification –Views Basics –Contacts –Folders –Web Access Q&A.
Outlook 2007 Tips, Tricks, and Tools. Overview Main Screen Navigation Pane View Pane Reading Pane To–Do Bar Create a New Message Contacts Create a Signature.
TRW Automotive November, 2004 Visit
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
Toll Free: Project Manager Tutorial.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Lawson System Foundation 9.0
Lesson 4: Using the Calendar
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Welcome to the University of West Florida Online Employment System Applicant Tutorial.
 First time student activates their google account, they need to go to an internet browser and go to  drive.google.com/a/students.macon.k12.nc.usdrive.google.com/a/students.macon.k12.nc.us.
TRW Code Updates Planned for ERD Activity in Windchill CRS User Help Guide for New System Changes October, 2005 TRW Automotive September, 2005 TRW Automotive.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
| | Tel: | | Computer Training & Personal Development Outlook Express Complete.
Lead Management Tool Partner User Guide March 15, 2013
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
V8.0 Upgrade. Overall Changes Task List Additions Counts in Employer/Contact Profiles Search Results Page – Mass Partial Delete Defaulting Allowed.
Training Guide for Inzalo SOP Users. This guide has been prepared to demonstrate the use of the Inzalo Intranet based SOP applications. The scope of this.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
TRW Code Updates for WCRS Document Activity ERD, EAR and Part Generator Changes August, 2006 TRW Automotive August, 2006 TRW Automotive August, 2006.
TRW Engineering Change Request System {CRS} Released in the Windchill Environment Getting Started in WCRS TRW Automotive December, 2004 TRW Automotive.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
SATERN for Supervisors Updated: December Session Objectives At the end of the session, participants will be able to:  Describe SATERN  Log in.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
Word and the Writing Process. To create a document 1.On the Start menu, point to Programs, and then click Microsoft Word. A new document opens in Normal.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
Document Module Features Streamlines the control, routing and revision process for critical documents and records Controls documents in any format (Excel,
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Chapter 8 Using Document Collaboration, Integration, and Charting Tools Microsoft Word 2013.
SCC P2P – Collaboration Made Easy Contract Management training
DSQR Training Reliance System
Helping Yourself in PD2 SPS Spotlight Series July 2015.
LMEvents SharePoint Portal How-to Guide
Single Sample Registration
CS3015 Beacon Module 4 Messenger & Setting Preferences
Materials Engineering Product Data Management (ePDM)
New Mexico Emergency Operations Center (NMEOC) Basic ETeam Training
Boeing Supply Chain Platform (BSCP) Detailed Training
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
User Guide to Reviewers of Opto-Electronic Advances (OEA)
Wells Fargo Toolkit – CreativeBuilder Reference Guide
Using Microsoft Outlook: Outlook Support Number
Chapter 8 Using Document Collaboration and Integration Tools
How to manage approvals in Chrome River
Presentation transcript:

TRW Automotive December 09 Visit www.ptc.com 19-Apr-17 Engineering Change Request System {WCRS} Released in the Windchill Environment User Training and Reference Manual Windchill 6.0 provides additional reporting capabilities associated with the new product centered approach to configuration management. TRW Automotive December 09 © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Topics Introduction & Overview / Task Driven System WCRS Access, Navigation, Setting User Profile Worklist, Search, Personal Calendars, Reassign, BOM View Part Master / Summary of all Part Data Review and Approve Change Issues Document Creation Part Generator / Clipboard Deviation, P&R & GI IPD (Internal Plant Document) Engineering Request Documents Technical Support

Our Global electronic system is called WCRS (Windchill Change Request System), within the system we process various documents used to summarize all information that pertains to that document type. A document creator may modify data while the document remains in Create state. ERD - Engineering Request Document authorizes the release of procedures, production and prototype drawings. Gathers customer, functional group and plant approvals. Identifies all impacted facilities and authorizes BOM activity. Requires addressing service, engineering tests, DFMEA, global and other issues. DEV - Deviations provide authorization for variances from the acceptable production intent on design, testing, shipments, bill of material (part replacement to prevent obsolescence or support availability), rework, part traceability, PPAP, recall and other conditions that do not meet production standards P&R – Process and Routing documents are used for supplier tool moves, line moves, tool refurbishment and component PPAPs. They describe and authorize a permanent change to a process and facilitate PFMEA and Control Plan document updates due to design change. GI - General Information notices are used for documentation, notification and confirmation of various engineering activity. CI – Change Issues are documents used for information gathering and soliciting responses from selected individuals, providing documented posted and response dates. Responses can be used to support engineering decisions or represent concurrence from collegues. IPD – Internal Plant/Department Documents are used for the notification and releasing of plant or department specific documentation. Very automated and simple to use.

Engineering Part Release Process Note: A Change Issue can be used to gather and assemble engineering information prior to the initiation of an ERD. Essential Steps: All Parts Released in ERD and Notification made ERD Approval of Proposed Changes Drawings Completed and Registered (ERD Release) Part Utilization in Affected Mfg plants Global notification and access to BOM information Continued

Engineering Part Release Process Improvements Continued

WCRS Connection Information How To Request a User ID / Reset Password Complete prior to first use in system. NOTES: Internet pop-up blocker must be off. If you do not have a user ID your manager can request one online. If you have forgotten your password you can request a reset.

WCRS Home Page Setting User Profile From the Home Page, select My Profile Select Change User Preference FACILITY AND FUNCTION prior to using the system.

Setting User Profile Select Facility from Change Facility Drop Down List (i.e. Plant) Select Function from Drop Down List (i.e. Job title) Change Password Utility (People Soft ID Or Email Address)

Worklist, Search, Personal Calendars, Reassign, BOM View, ENG Part List

The Worklist supplies each user with “tasks” that allow the user to complete the activity indicated (varies with each document). Manage Layouts allows user to customize worklist, see next slide.

Accessing the Worklist Changing worklist layout The Manage Layouts feature allows the user to change the way tasks are displayed in their worklist. Each column shown above can be sorted or grouped. *Note: the recommended Default for WCRS users is as Shown above and results shown below.

Personal Calendar Delegate Task – used with a known time of absence The calendar allows the user to delegate tasks on indicated days. User may look up another users calendar. Calendar will show users working days & If tasks will be assigned to a different user. Select days to delegate tasks, click delegate. Select User from list and click OK button. All tasks assigned on that calendar day will be reassigned to the indicated user. (New users name will now be written on that calendar day.)

Reassigning Task If you receive a task meant for someone else, or if you need a colleague to address your task, you can forward to the correct individual Check the “Work Item Selector” box and select the Reassign button. Select User to reassign to, and click Submit, task will delete out of your worklist. The approval page of the document will show user 1 reassigned to user 2.

GroupWise Task Notification To access the worklist from your email notification select the “HERE” link NOTE: See Engineering Systems web page for how to remove unneeded notifications from your email.

Example Task A Task is sent to a users worklist based upon their role in the Work flow. For example, when a user creates any type of CRS document, a task will be sent to that users worklist. The Instructions indicate their next actions The CRS document “ERD”, is accessed through a Link in the Task You may enter Comments that will appear in the Task that is sent to the next user in the workflow, and on the document Approval screen. An ‘OkToTool/Advanced Release’ selection will need a Checker and a PRA Admin. Just the PRA Admin for a ‘Standard Release’ selection. PRA Admin is the only mandatory selection, see task instructions. A Create Review Team (management) may be selected to review the document before PRA action. Additional Creator Team may be added for collaboration. Other approval selections are optional and subject to additional or local notification procedures. See task instructions. Selecting Task Complete continues the workflow for a newly created document.

Example Search with Results Example search results for all Released ERDs originating in Aschau. Search options include: ERD DEV PR GI CI DOC Part Etc.

Example Search Results Search on Part will give you results as shown below: Link to Part Master

View BOM from SAP / Maxcim From the WCRS homepage, select WCRS, “View OSSNA BOMs”. Type the part number, select site/plant, effective date and click single level or indented BOM query.

Example of Single Level BOM Query from SAP

Part Master

Part Master Link will display all pending and released EAR’s for this part number. Link to all registered drawings (markups, released, etc.) Current version for this release. Latest released version of this drawing. Affected Platforms Pending revision to this part number with ERD number & state..

19-Apr-17 Change Issue © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

System Overview Informal information gathering tool – CI workflow Many uses exist for this tool. The routing, sharing, concurrence, gathering of information can easily be acquired through this workflow and available for decision making or use as an attachment to an ERD. When reviewers have responded or a Maximum of 10 working days, the Change Owner will receive another task summarizing the reviewer responses.

Creating a Change Issue 19-Apr-17 Creating a Change Issue A Change Issue is an informal document, that can be used for: Gathering ideas Obtaining, Attaching or Sending files Attaching to a WCRS Document when beneficial Select WCRS from the menu bar. Select Create CI – Change Issue. © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Creating Change Issue, cont. Complete all fields on Request screen and Save. Fields flagged with “*” are required. Click Save For attachments select Browse to locate file, when finished adding files, select Complete. Link to add attachments Continued

Creating Change Issue, cont. By selecting Worklist from Change Issue you would view as below Select link to launch into task. OR: Task can be accessed via Groupwise notification Select link.

Creating Change Issue, cont. This is the Change Issue Task Link to view Change Issue To add Program Manager or Reviewers, select Add Users button. Search for users, select and click Add. Multiple users may be selected from this window. Once finished, select OK. Select from available options. Perform Review (send to Reviewers) or to Program Manager. Select Task Complete

Completing a Change Issue Once the Change Owner accepts the final task, the Change Issue will move to ‘Completed’ State. Once a Change Issue is complete, it may be attached to an ERD as supporting documentation if needed. A Change Issue may only be attached to one ERD.

19-Apr-17 Part Generator The HTML based product structure viewer has been enhanced in Windchill 6.0. The new viewer has more user friendly functions, has been enhanced to accommodate new functional areas and allows users to trace more links to related information. © Copyright 2000 Parametric Technology Corporation Visit www.ptc.com

Part Generator From the Windchill home page, select WCRS from the menu bar on the left. Select Part Generator. You have the option to create TRW Part Numbers, Non-TRW Part Numbers or Engineering Document numbers i.e. specs, procedures.

Part Generator Select from pop-up window Part Description & Commodity Code. All fields except for Part Ref. Desc are req’d. All Part or Document Types can be selected from this field Additional descriptive text that can be searched. Inj. Mold Plastics - IRS The Clipboard will store all parts that you have previously created. You have access to edit parts which have not been used. Select Number of Parts to Generate and select Create Part(s).

Updating/Viewing Parts Created Parts – The Clipboard Part Generator will automatically pull a CV & DV part. Select the links to view the part master. The update link will allow you to change any information if necessary. Example clipboard.

Engineering Request Documents, Creation and MU Example

Engineering Request Document Create From the Windchill home page, WCRS menu, select Create ERD.

Engineering Request Document Request Page Complete all required fields (*) and click Save. Documents/Drawings for Release: Any document to be released within the ERD. User Reference Documents: Attachment added as supporting documentation. Change Issue: Attach for information from WCRS. Windchill System Documents: Any supporting document available from Windchill (i.e. Procedures, etc.) WCRS will do three things: assign an ERD number add the attachment bars send a task to the creator’s worklist. Go to Part Details screen.

Creating an Electronic Markup in Spicer Create new layer. Mark up drawing using tools on left side of screen. Save (see next page). To edit a markup drawing, select Layer, Activate. This will allow changes to the same layer. New Layer Line Arrow Circle Text **Include ERD#, revision, your name, and date in revision column Mark-up note. If ERD is Advanced Release or OK to Tool, also note on drawing.** Highlight Dimension Select Move/Resize

6. File type should be Spicer Document (.smf) Saving an Electronic Markup 1. File 2. Save As 4. Choose file location. This can be a folder created on your computer 5. Type file name (followed by .smf), use this format 3. Browse 33045678_A01.smf 6. File type should be Spicer Document (.smf) 7. Save

Engineering Request Document Create Change Item Detail (Page 1 of 2) Change Item Type: Part Document Source Selection: Select from WCRS Copy from Details already Defined Generate New Number (Links to Part Generator Master) Current Part Number: Either manually enter base number then Tab, or select Search button and enter the base number. Change Type: Initial Release Major Revision Minor Revision No Drawing Impact Obsolete Program Add (also used as “Plant Add”) Complete required fields and click Next.

Engineering Request Document Part Details – Feature to add charted parts to ERD Part numbers released on drawing CH33051661_A17 After the chart drawing has been added to the Part Details screen, the user can click the chart drawing select box (A), then click the “Add Described Parts” button (B). This will display all the parts released on this drawing and allow the user to select and update the Change Type for all required parts at the same time (C). Finish button will add them to ERD Part Detail. B A C

Engineering Request Document Create Change Item Detail (Page 2 of 2) USE . . . Complete required fields, shown in red, then click Finish. WCRS will then ask if you want to add more Parts. Yes, will direct you back to Step 1. of the Create Change Item Detail. No, will close the window and exit the Create Change Item Detail. After ERD is created, attachments and part details completed, send document forward (to PRA) from the task in your worklist.

Example Task A Task is sent to a users worklist based upon their role in the Work flow. For example, when a user creates any type of CRS document, a task will be sent to that users worklist. The Instructions indicate their next actions The CRS document “ERD”, is accessed through a Link in the Task You may enter Comments that will appear in the Task that is sent to the next user in the workflow, and on the document Approval screen. An ‘OkToTool/Advanced Release’ selection will need a Checker and a PRA Admin. Just the PRA Admin for a ‘Standard Release’ selection. PRA Admin is the only mandatory selection, see task instructions. A Create Review Team (management) may be selected to review the document before PRA action. Additional Creator Team may be added for collaboration. Other approval selections are optional and subject to additional or local notification procedures. See task instructions. Selecting Task Complete continues the workflow for a newly created document.

Engineering Request Document Approval Team Review/Approval After PRA completes document, approval members can access task through their worklist. Link to view document. Recommendation: right click and select Open in New Window. This allows user to view document and close window vs. clicking back button to task page. From the Request screen, use “Quick Overview” to view the entire document. Enter comments if desired. Required if placing on hold. Click Task Complete.

Engineering Request Document Part Detail page Print option allows user to send complete document or sections to printer. Document formatted in new window. From browser, select File, Print. This link is available from all screens within the document Allows user to view all associated drawings; markup, OK to Tool/Adv Rel, Released; Eng Part List – Under construciton. Add/View Related Parts – Available for end item, component or sub-assembly color information. View Purchasing/Supplier Information – Under construction. Multilevel BOM Compare – Under Construction Where-Used – Provides access to the Global Where Used system. Select boxes allow the user to either view the part detail on this ERD or view the Part Master of the previously released part revision(s). The top select box is a “Select All” box.

Engineering Request Document Platform Page Select links to display platforms associated to that part number. Active part number will be highlighted.

Engineering Request Document Approval Page Approval page will display pending & completed approvals. Plant Facilitator may add approvers as required. Everyone has the ability to extend an FYI in any state of the document. WCRS will record and display sent to, sent from, date & comment.

Engineering Request Document Tracking Design approval by engineer. This box will auto fill via task. Displays Pre-Approvals for OTT/Advance Release ERD’s. Displays registration date of final drawings. To be completed by plant personnel.

Deviation, GI & P&R

Creating a Deviation From the WCRS homepage, select WCRS from the menu bar. Select Create DEV - Deviation

Creating a Deviation Use this feature if your deviation is to expire and must be extended. Originator must complete fields with a white background and identified with an asterisk.

Creating a Deviation (Part Details) User must be in Update mode to add/update the part details page. To add parts, click the Add New Details button.

Takes you to Part Detail Wizard Add base part number then tab, OR use Search Complete the required fields with white background. Select Finish when complete, the Part Details page will auto fill.

Creating a Deviation Click on Part Number to view the associated plants/platforms. Active Part number will be Red Deselect any Unaffected Platforms in relation to this part number. Note: After you Save, now you have completed user input for the Deviation From your Worklist, send to PRA for processing

Creating a Deviation Once the deviation is complete, access task via worklist. Choose PRA (Product Release Analyst), Add comments if desired and select Task Complete. This sends your Deviation out for processing

Approval Page Date and Comments from user task. System will display all pending approvals. Hold comments will also appear under Pending Approvals Completed approvals and comments, if supplies, will appear under Approvals. Click “Create FYI” to send FYI notification.

Deviation – Approval Team Review Task Access Task via worklist or GroupWise notification. Review document by selecting link (right click and open in new window) After review of document enter comments if desired, select Approve or On Hold (comments required if placing the document on Hold) and click Task Complete.

Creating a GI Complete required fields (shown in white), add attachments if desired and select Save. Note, these instructions also apply to a PR document.

**Be sure to select Add Details button to save data.** Creating a GI Enter base Part Number and select Check. The system will auto fill all other fields except for Part Summary. **Be sure to select Add Details button to save data.**

Creating a GI Click on Part Number to view the associated plants/platforms. Active Part number will be Red Deselect any Unaffected Platforms in relation to this part number.

Internal Plant/Department Documents (IPD)

Internal Plant/Department Documents (IPD) Create An IPD is used to release documents in Windchill. IPD’s may be used for: Manufacturing Instructions Plant documents Plant drawings Plant procedures QC documents Routing instructions Service documents Departmental records / documents From the Windchill main menu select Create IP document

Internal Plant/Department Documents (IPD) Create Document Categories include OPS Doc, Alert Doc, & CAD Doc. Your Primary content file will be your main document, any attachments may be added as necessary. Click on the appropriate link to browse files and add to IPD. Number may be assigned by originator, or if left blank, be a system assigned number (ex. IP000001 A team can be assigned as default according to user needs / document types. (Field can be left blank.) “*” indicates required field

Internal Plant/Department Documents (IPD) Properties Page Click on the Update link to make changes, add attachments, add carlines, etc.

Internal Plant/Department Document (IPD) Platforms Page In the Update mode, carlines may be added by clicking the Select Platform box, and removed by the remove link. Platforms may be searched by Customer, Platform ID, or Platform. Select the Platform by checking the box, and selecting OK. Upon completion of your Platform Page, go to your worklist and select reviewers to send out document for release into system

Helpful Hints Saving your Userid and Password: When entering your USERID and PASSWORD, check the box “save this password in your password list”. Creating a Shortcut to Windchill: To add an icon to your desktop, log into the application. Once in Windchill, RIGHT CLICK anywhere on the page. Choose the “Create Shortcut” option. The system will tell you “a shortcut to the current page will be placed on your desktop”. Choose “OK”. To Open Documents in Windchill within the Application the Document was Authored in: Sometimes browsers are configured to open all documents within the browser application. To correct this, your browser must be configured correctly. Double click on the My Computer icon on your desktop Choose the “Tools” option (at top of page) Select “Folder Options” Select the “File Types” tab (at top of page) For each document type you access via Windchill: Scroll to the correct document type (e.g. Microsoft Word Document {doc}) Highlight the document type (e.g. Microsoft Word Document {doc}) Select the “Advanced” option (bottom of page) De-Select (remove checkmark from) the “Browse in Same Window” option. Press OK to save.

Technical Assistance To receive assistance with the use of WCRS Contact your Local Engineering ECC or WCRS Plant Facilitator. Or Contact Your Local help desk (24 x 7)