7. EAFM process overview Essential EAFM Date • Place Version 1.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Science Subject Leader Training
Professional Learning Communities Connecting the Initiatives
PQF Induction: Small group delivery or 1-1 session.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
The Aged Care Standards and Accreditation Agency Ltd Continuous Improvement in Residential Aged Care.
Climate Change Adaptation A Framework for the City of Philadelphia Chastain C., Ferguson J., Gudernatch S., Kondracki E, Levy J., Tran L.
INTRODUCTIONS AND WELCOME Grounding question:  Introduce yourself, your district, and your role.  How will 21 st Century Technology Standards enhance.
Group Timelines Horizontal line represent ‘time’
8. EAFM Startup A: Preparing the ground
Project Cycle Management (PCM)
Personal Action Plan T.K. Orgle COURSE ON PARTICIPATORY PLANNING MONITORING AND EVALUATION IAC – 9-27 Feb 2004.
Family Outreach and Response Program Strategic Plan September 26 th, 2012.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Evidence, Standards and Outcomes: Taking a leadership role in palliative care Tieman JJ, Rawlings D, Mills S, Banfield M PCWA Conference, October 2012.
Student Learning Objectives The SLO Process Student Learning Objectives Training Series Module 3 of 3.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
13. STEP 3. DEVELOP OBJECTIVES, INDICATORS & BENCHMARKS Essential EAFM Date Place 13. Steps 3.1 & 3.2 Develop objectives, indicators and benchmarks Version.
Fundamentals of Planning
Science Academic Content Standards and Standards-Based Education.
UNIT 9: An Ecosystem Approach to Fisheries Management Plan.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
17. STEP 5: MONITOR, EVALUATE & ADAPT 1 Essential EAFM Date Place 17. Steps 5.1 & 5.2 Monitor, evaluate & adapt Version 1.
1. EAFM INTRODUCTION Date Place 1. Essential EAFM Version 1.
11. STEP 2: IDENTIFY & PRIORITIZE ISSUES & GOALS Essential EAFM Date Place 11. Steps 2.1 – 2.3 Identify and prioritize issues and goals Version 1.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
3. THE WHAT AND WHY OF EAFM Essential EAFM Date Place 3. The what and why of EAFM? Version 1.
9. EAFM START UP B Essential EAFM Date Place 9. EAFM Startup B: Engage Stakeholders Version 1.
14. STEP 3: ACTIONS, COMPLIANCE, FINANCE & FINALIZE 14. Step 3.3–3.5 Management actions, compliance, finance & finalize EAFM plan Essential EAFM Date Place.
Service Component Registry and Repository (SCRR) April 26, 2007 Lico Galindo 2007 Exchange Network National Meeting.
Strategic Management at Non Profit. If you fail to plan, you plan to fail But Plans are nothing planning is everything.
The implementation programme for the 2008 SNA and supporting statistics UNECE special session on National Accounts for economies in transition Geneva,
6. LINK BETWEEN POLICY AND ACTION 1 Essential EAFM Date Place 6. EAFM plans the link between policy and action Version 1.
1 COMMUNITY PARTNERSHIP FOR ATTAINMENT SELF-ASSESSMENT November 20, 2013.
Developing SEA Change’s Evaluation Plan
10. STEP 1: DEFINE & SCOPE Essential EAFM Date Place 10. Step 1: Define and scope the FMU Version 1.
1 Integrated River Basin Planning Training Course Overview p.p. 8.1.
15. STEP 4: FORMALIZE, COMMUNICATE & ENGAGE 15. Step 4.1 Formalize, communicate & engage Essential EAFM Date Place Version 1.
Action planning and evaluation How to apply workshop learning and action points to deepen that learning further Identify and plan next steps for post-
Sysco Talent Management 1 Change Profile Leading Change Creating a Shared Need Shaping a Vision Mobilizing Commit- ment Making Change Last.
Well-governed fisheries sector Abundant fisheries resources Healthy environment and habitats Increased jobs, profits, and improved economy Improved human.
The EU Land policy Guidelines February 2003 Philip Mikos Overview of content and process.
Session 2: Developing a Comprehensive M&E Work Plan.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
April 4, 2011 Princesa VanBuren Hansen Environmental Quality Board.
2.4.1 Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 2. Session 4. organizational structure for M&E.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Planning Literacy Learning Essential Skills Practitioners Level 3.
Rest of talk 6.
16. Reality check ll Essential EAFM Date • Place Version 1.
M&E in Project Cycle Management
Monitor, evaluate & adapt
16. Reality check ll Essential EAFM Date • Place 1.
10. Step 1: Define and scope the FMU
7. EAFM process overview Version 1.
6. EAFM plans the link between policy and action
Monitoring &Evaluation in Project Cycle Management
1. EAFM LEAD Date • Place Version 1.
Definition of Project and Project Cycle
A Whole School Approach
1. Essential EAFM Date • Place 1.
Fisheries a Ecosystems… the bigger picture
3. The why and what of EAFM? Essential EAFM Date • Place 1.
6. EAFM plans the link between policy and action
11. Steps 2.1 – 2.3 Identify and prioritize issues and goals
15. Step 4.1 Formalize, communicate & engage
7. EAFM cycle overview Essential EAFM Date • Place 1.
13. Steps 3.1 & 3.2 Develop objectives, indicators and benchmarks
Draft Charter Community of Practice for Direct Access Entities
Presentation transcript:

7. EAFM process overview Essential EAFM Date • Place Version 1

Session objectives After this session you will be able to: Describe the key steps of the EAFM process and how to plan, implement and monitor EAFM Identify the planning steps in EAFM process Familiarize yourselves with an EAFM plan Self explanatory 2

The 5 steps of EAFM This is first time the cycle visual is introduced in the course; it will be a recurring visual. STRESS that this module gives a quick run through what we will cover over the week. Its like a snapshot without detail and needs to be run through quickly. Point to each element as you talk. Terms like FMU will be defined shortly. [Some participants like to see the structure of the course, while others will be happy to skip this] Refer to picture of this on wall-visual gallery (keep up as reference throughout course to remind participants of the steps through the cycle, so we can see every day how we are moving along). There are 5 EAFM steps that fit under the general management cycle (outer circle). Moving anti-clockwise around the cycle……. The 5th step aligns with checking and improving And the 4th step aligns with doing. The planning phase into 3 steps; the output of these is an EAFM plan. Before you start the process, you need to get organised and engage stakeholders – this is called STARTUP. There are also 2 reality checks to make sure that we are being realistic and achievable. 3

Startup A Prepare the ground Identify who should be involved What is planned to happen (plan for the process) Decide on the general location STARTUP A is getting organized and preparing the ground. Many of the tasks in STARTUP A are only done once at the beginning of the process. 4

Startup B Stakeholder engagement Engage stakeholders for: Participatory planning Co-management In STARTUP B we engage the stakeholders. The tasks in B are ONGOING: they are started here and continue throughout the lifetime of EAFM process. 5

Step 1 Define and scope the Fisheries Management Unit (FMU) 1.1 Define the FMU 1.2 Agree the FMU vision 1.3 Scope the FMU Step 1 is called “Define and scope the Fisheries Management Unit”. In this step, stakeholders agree on a vision and pull together relevant background material. Provides background information and a vision 6

Step 2 Identify & prioritize issues & goals 2.1 Identify threats & issues 2.2 Prioritize issues 2.3 Define goals for EAFM plan Identifies the high priority issues and sets goals In Step 2, we firstly identify all the issues that affect the fishery and then we prioritise them. This allows us to set a number of goals about what we want to achieve in the longer term. 7

Reality check I Reality check l Are the goals achievable? -Constraints & opportunities -Facilitation / skills -Conflict management Are the goals achievable? At this point we carry out a reality check to look at constraints and opportunities. 8

Step 3 Developing the EAFM plan 3.1 Develop operational objectives 3.2 Develop indicators & benchmarks 3.3 Management actions & compliance 3.4 Identify sustainable financing 3.5 Finalize the EAFM plan Develops the management framework In Step 3, the plan is developed based on the previous inputs from steps 1 & 2. 9

Step 4 Implement 4.1 Formalize, communicate and engage Implements the plan through formalizing and communicating it The plan needs to be formalized and communicated, or else it will be just another plan on some one’s desk. This is carried out in step 4 along with some considerations of how to implement it. 10

Reality check II Reality check II Checks whether the governance and supporting structures are in place Reality check II -Governance -Co-management -Supportive environment In Reality Check II we check to see whether the governance and supporting structures are in place. 11

Monitor, evaluate, adapt Step 5 Monitor, evaluate, adapt 5.1 Monitor & evaluate (M&E) performance of management actions 5.2 Adapt the plan based on M&E Completes the EAFM cycle with M&E and adapts the plan to start a new cycle Step 5 is a critical, often forgotten stage. It is necessary to show you are on track, to help adapt the management properly, as well as to show results. It needs to be planned, otherwise it will not happen. 12

EAFM cycle Planning – Steps 1-3 Doing - Step 4 1. Define & scope 2. Issues & goals 3. Objectives, indicators, management actions & compliance, financing Doing - Step 4 4. Implement Checking & improving - Step 5 5. Monitor, evaluate and adapt In summary – the EAFM cycle has 5 steps, 3 are planning, one is doing and one is checking and improving. Refer back to session 6 just before this one where we agreed that we need PLANS to link (existing) policies to action (i.e. to be able to actually implement those policies). 13

EAFM Plan outline EAFM Management Plan for FMU XX Vision (Step 1) Background (Step 1) Major threats and issues (Step 2) Goals (Step 2) Objectives, indicators and benchmarks (Step 3) Management actions (Step 3) Compliance (Step 3) Data and info needs – source of data, etc (Step 3) Financing (Step 3) Communication – link to communication strategy (Step 4) Review of the plan – link to frequency of reviews (Step 5) These steps are represented by the headings in a typical EAFM Plan. Tell the participants that they will be developing one of these during the course. EAFM plan as an output and guiding tool. Refer to same template on visuals gallery on wall. 14

Key messages The EAFM process cycle has 5 steps Before the first step in the cycle, get organized in the Start-up The EAFM plan comes from the outputs of Steps 1-3 In Step 4 the plan is implemented In Step 5 the plan is evaluated and adapted for the next cycle EAFM has seven principles There are various benefits to reap from implementing the EAFM principles Self explanatory 15

Activity: The EAFM steps Move to the large circle and follow instructions Activity to embed EAFM steps (see more details in session plan): After slide 14 (EAFM Plan template). All stand at back of room/ outside (need space for big circle). Trainer places large circle of string on the floor and 5 blank pieces of paper (representing EAFM cycle and 5 steps, but do not say this). Everyone stands in larger circle outside the string. 2. Trainer invites some participants (e.g. all those wearing glasses, wearing black shoes..) to stand in 1st place near/ on piece of paper. Ask: where are you now? (Elicit: step 1); what happens at this stage (i.e. define and scope FMU); what happened before (start up A+B). Repeat process for all 5 steps so by end everybody is standing at one of 5 steps, and all have experienced the EAFM cycle and reviewed what happens at each step. 3. Ask some questions to check all understand which of the 5 steps are planning, and which are other functions. Show of hands: Who is implementing? (should be only step 4), Who is doing M&E? (should be step 5), Who is planning? (should be steps 1-3).   16

Form working groups Form working groups (may be based on shared fishery/ shared geographical area) You will work in these groups for much of the rest of the course, developing parts of the EAFM plan as you go through Steps 1–3 On Day 5, each group will present their draft EAFM plan and receive feedback See details in session plan for how to get groupings. We basically want groups that will be able to agree on a shared FMU, but we don’t actually say FMU here as we have not introduced this yet. On the course there will be participants from natural clusters (i.e. from same fishery area) and these will probably be the FMU groups. If not, work with country groups and regional area groups. 17