Bridge Rehabilitation W-14-082 Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Delmar Boulevard bridge replacement over Interstate 170.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
UTA Airport TRAX Line North Temple Viaduct & Construction Phasing.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
The Way Forward – A 21 st –Century Transportation Plan Frank DePaola, P.E. Administrator, Highway Division April 2013 Massachusetts Department of Transportation.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
Presentation to Maxwell Place Homeowners Association 1.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Bearings and Beam Ends Jeff Naum Maine DOT. Bridge Nomenclature.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
OREGON ECONOMIC & BRIDGE OPTIONS STUDY The problem is not just the bridges, or the freight system, It is about Oregon’s economy and quality of life. FHWA.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Excel-(1d) Under $50,000 Without a Consultant Iway Project: I-95 South to I-195 East Rhode Island Department of Transportation – Office of Communications.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Road work season begins Projects kick off in local counties May 19, 2012 By Jason Raiche - staff writer Daily
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Fang Yuan, PhD. PE. SEPTEMBER PAPAL VISIT July 1, 2015 Potential Traffic Impacts.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Delmar Boulevard bridge replacement over Interstate 170.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Maintenance and Temporary Traffic Control
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
Major MnDOT Highway Improvement Projects West Metro
The I-465 West Leg Reconstruction Project
Project Purpose and Objective
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
New Bridge Construction
Overview Project Limits Improvements Cost Anticipated Schedule
Overview Project Limits Improvements Cost Anticipated Schedule
Florida Transportation Commission FY 2009
Highway 169 Bridge Replacement & Pavement Resurfacing
The Great Belt East Bridge
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction

What does the project consists of? $16.5 Million project to rehabilitate the bridge structure carrying I-290 over: CSX Railroad Grafton Street Franklin Street Shrewsbury Street Access road to commuter parking lots

Overview of Affected Area

Bridge Attributes Consists of 11 spans 1550 feet in length Four lanes in each direction (3 travel lanes) Carries 120,000 vehicles on an average day Major regional roadway Used heavily for intra-city trips Built in 1958 (therefore it is 46 years old) It has reached the end of its useful life

What is wrong with the bridge? Bridge deck is severely deteriorated and saturated with salt. Steel I-Beams are undersized for today’s heavy trucks. Damaged expansion joints have led to deterioration of concrete in the substructure. Bridge railing does not meet current standards. Cost to repair and maintain the bridge is becoming uneconomical.

Ramifications If Project Is Not Done Could potentially reduce travel lanes to reduce loading. Increase the posting and restrict truck traffic from I-290. Could lose a section of the bridge. Could lead to more extensive/expensive substructure repairs. In other words – This issue has to be addressed!

How are we going to fix the bridge? Completely demolish the existing deck and railings. Clean and paint structural steel at critical areas to protect against future corrosion. Reinforce the steel I-beams with steel plates and other structural retrofits. Repair concrete substructure. Provide new deck. Provide new railing. Provide new expansion joints.

How are we going to keep traffic moving while we rebuild the bridge? The Big Question

Construction Staging Plan 2 stages of construction Construct the bridge in halves Bridge consists of 2 separate structures, 1 eastbound and 1 westbound Construct one structure at a time Use remaining structure to carry 2 lanes of traffic in each direction Close Shrewsbury Street off-ramp (phase 1) Close both Grafton Street on-ramps and Summer Street on-ramp (both phases)

Construction Staging Plan (cont.) Phase 1:Spring 2004 to Fall 2004 All I-290 lanes and ramps open from Fall 2004 to Spring 2005 Phase 2:Spring 2005 to Fall 2005 Fall 2005 – substantial completion – all ramps and lanes open Phase 3:Work on bridge substructure (no impact on 290 traffic – little impact on local traffic) Total of approximately months of impact

Getting the Word Out Media campaign to encourage alternate routes Local cable channel Local newspaper Local radio Hotline – City and MassHighway websites Regional and local signage to encourage alternate routes – coordinate with City officials Monthly CAC meetings – if necessary

Parking Coordinate with City on parking beneath I-290 Rotating impacted areas Identify alternate locations for parking

Ramp Closures & Detour Routes

Ramp Closures – Stage 1 Grafton Street EB on-ramps closed East Central Street WB on-ramp closed Summer Street WB on-ramp closed Shrewsbury Street EB off-ramp closed 2004

Ramp Closures – Stage 2 Grafton Street EB on-ramps closed East Central Street WB on-ramp closed Summer Street WB on-ramp closed Shrewsbury Street EB off-ramp open 2005

Grafton Street Ramp Detour

Summer Street / East Central Street Ramp Detour

Shrewsbury Street Ramp Detour Mulberry Street closed to through traffic

On To Construction Construction starts April 12 th.