Hall A Beam Current Monitors (J.G. for Sasha, Roman and Vadym)

Slides:



Advertisements
Similar presentations
Dicembre 2009SPES Control System Group Acquisition using VME boards Conforto Nicola.
Advertisements

Status of the beam diagnostics for the SPES project Conforto NicolaSPES Control System GroupMarzo 2010.
Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
CH 31: FARADAYS LAW. If current can generate a magnetic field is it possible to generate a current from a magnetic field? Yes, but not from a constant.
Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
1 Graphic adapters and monitors – the summary. 2 Outline The summary of principles of displaying the information – adapters and monitors. Black and white.
Tachometers – An Overview
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
1 Automatic Meter Reading in Electronic Power Measurement Proposal based on AMR 2000.
L OW COST ELECTRICAL CURRENT SENSORS WITH AUTOMATIC MEASUREMENT RANGE DEIM, University of Palermo, Viale delle Scienze – Building 9, Palermo, Italia.
1 CCTV SYSTEMS TESTING. 2 CCTV SYSTEMS CCTV systems of all sizes are complex video signaling systems, they are subject to many of the same problems found.
experimental platform
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
DIGITAL FLUOROSCOPY.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Digital Voltage Transducer family DV from 1200 to 4200 V RMS DVL from 50 to 2000 V RMS.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Threshold ionization mass spectroscopy of radicals in RF silane discharge Peter Horvath 5/19/2004 Progress of experiments.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
PH4705 & ET4305: Digital Sensors
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Experience with DCCTs at DESY Klaus Knaack. All DC current measurements at DESY are done by PCTs (DCCTs) from Bergoz. They are installed in all circular.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
Hall A BCM Infrastructure Dave Mack July 21, 2015.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
Monitoring Patients 3.3 Health. IT Features A Process is monitored by Sensors Sensors are usually connected to an Interface that is connected to a computer.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 LECTURE 3. Contents 3.Measurement methods 3.1.Deflection, difference, and null methods 3.2.Interchange method and substitution method 3.3.Compensation.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
INTRODUCTION TO ELECTRICAL AND ELECTRONICS ENGINEERING Sakarya Üniversitesi Teknoloji Fakültesi Elektrik Elektronik Mühendisliği Bölümü T4 Blok Introducing.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
Moving Wire, Pulsed Wire and Long Coil Measurements on the SSRL Beam Line 5 EPU Scott Anderson SLAC Magnetic Measurements.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Spin Precession At CEBAF
PSS Plans for Improved Reliability and Availability
How SCADA Systems Work?.
Status of the Beam Phase and Intensity Monitor for LHCb
Success is when preparation meets opportunity
QWeak Collaboration Meeting
Qweak Coordination Meeting
Injector Setup for G0 and HAPPEX & Lessons Learned
Drift Chamber Monitoring
Presentation transcript:

Hall A Beam Current Monitors (J.G. for Sasha, Roman and Vadym)

Pre-Long Shutdown Configuration EPICS CODA

Hall A BCM Calibration Procedure - I  Injector beam Goes through current monitor IBC0L02 Alternates in ~90 sec intervals between Faraday Cup#2 (IFY0L03) and Hall A  Hall A logs, Above two signals Upstream/Downstream BCMs (DVMs & Power Meter, if avail.) Unser V2Fs sent to CODA scalers See for details.

Hall A BCM Calibration Procedure - II  Calibration procedure sensitive to beam transmission through the machine  The Unser current transformer is logged but there is no procedure in place to compensate for the zero drift (either short or long term) -order of,  +/-2uA constant T,  +/- 5uA/°C  Sudden changes of up-to 2uA lasting hours or days (cause not known)  Above numbers are not determined by the electronics but by the magnetic material used to build the sensor head - best numbers obtained with Vitrovac 6025 (the heads we have).  The Unser is equipped with a current calibration source but it has not been used (to my knowledge).

POST-Long Shutdown Configuration (proposed)

 Keeps an already operational and well understood leg of the system so that experiments can take data while debugging & developing of the future replacement system goes on.  EPICS: replace IOCHA5 with network based soft-IOC to be able to perform calibration procedure as pre-long shutdown - mostly done, many systems in Hall A operate already this way  Build on Hall C BCM calibration procedure to use the Unser current calibration source and correct for the zero drift  Get the “Musson” 2 nd Generation (used in Qweak) or 3 rd Generation electronics (in fabrication) operational  There is already an “expert” EPICS control screen available for these units (used by Musson’s group to setup these units) but screens for non-experts need to be developed  Readout of these units into CODA - via DAC interface like the parity experiments (18-bits only) or access the internal digital bus for best resolution (24 bits)?