Introduction to Green IT February 11, 2010 Bellevue Community College Seminar.

Slides:



Advertisements
Similar presentations
Undergraduate Renewable Energy Courses and Certification Tests John Martini University of Arkansas – Fort Smith ASSET II Annual Meeting Springdale, AR.
Advertisements

NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
A Lower-Cost Option for Substantial CO 2 Emission Reductions Ron Edelstein Gas Technology Institute NARUC Meeting Washington DC February 2008.
Lineage Power - Total Efficiency TM Smart Grid A Telecom / Commercial consumer’s perspective Paul Smith – Technical Marketing Manager, Lineage Power
Maximizing Your IT Budget through Energy Efficiency Heather Feigum Focus on Energy Advisor.
1 Leading Energy Efficiency in High Tech: PG&E’s Program & Service Portfolio Mark Bramfitt, P.E. CSU Dominguez Hills.
SAVING CARBON, ENERGY AND MONEY. HEEPI Higher Education Environmental Performance Improvement ( - Green Gown Awards events with.
ENERGY EFFICIENT DATA CENTRES – AN OVERVIEW Professor Peter James.
Meeting the Goal: Progress Report Washington, DC June 30, x’25 National Summit 2010: Mission Achievable.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
1 NYSERDA Data Center Efficiency Program Columbia University Green Data Center Winter Workshop January 7 th, 2011.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Creating Energy-Efficient Data Centers
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
1 May 12, 2010 Federal Data Center Consolidation Initiative.
Enabling High Efficiency Power Supplies for Servers : Update on industry, government and utility initiatives Brian Griffith System Power Architect Intel.
Smart Buildings Microgrid Innovations Energy and Construction Best Practices Summit | June 23, 2011.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
D EPARTMENT OF A GRICULTURAL, E NVIRONMENTAL, AND D EVELOPMENT E CONOMICS aede.osu.edu Making Green Jobs Work for Ohio March 3, 2011 Ohio Farm Bureau Federation.
Green Building Residential Construction
Oktober 2011 Opportunities sustainable Aruba TNO perspective Mart J. van Bracht.
Smart Grid APPA Annual Meeting Kiah Harris Burns & McDonnell June 15, 2009.
Connectivity Week Santa Clara Convention Center May 23, 2011.
Smart Grid m Yumiko Kimezawa August 12, 20111Colloquium.
Data Centers - They’re Back… E SOURCE Forum September, 2007 William Tschudi
BENEFITTING FROM GREEN IT – FINDINGS FROM THE SUSTEIT PROJECT Professor Peter James
SUSTAINABLE ICT IN UNIVERSITIES AND COLLEGES - What is it, and how can we achieve it? Peter James and Lisa Hopkinson
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
LBNL and Government Data Center Programs SC07 November, 2007 William Tschudi
Living Together in the Multi-cultural Society Proceedings of the 2010 EMUNI Research Souk 14 June 2010 A Sustainable Smart Grid Project for a Mediterranean.
Demonstrating Sustainable Energy Technologies Michael J. Kelleher Executive Director Energy and Sustainability SUNY College Of Environmental Science and.
Leveraging Renewable Energy in Data Centers Ricardo Bianchini on tour 2012.
1 DOE Data Center Energy Efficiency Program and Tool Strategy Paul Scheihing U.S. Department of Energy Office of Energy Efficiency and Renewable Energy.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Green Universities and Colleges Subcommittee March 16, 2011.
W. Schufft: Challenges for electrical power engineering IP 2007, Pernink Challenges for Electrical Power Engineering.
Virginia Information Technologies Agency Green Technology Initiatives
Overview of Data Center Energy Use Bill Tschudi, LBNL
Small Wind 101: An Overview of Small-Scale Wind Electric Systems Affordable, Clean Energy for Homes, Farms & Businesses.
ThinDesk, Inc.. What is Thin Computing?  IT Industry is buzzing about Green IT, Virtualization both in the Data Centre and on the Desktop, Public / Private.
Federal Data Center Programs 7 X 24 Exchange October, 2007 William Tschudi
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 CTO Challenge William Tschudi February 27, 2008.
Data Center Energy Efficiency Sonoma Mountain Village November 29, 2007 William Tschudi
Maximizing Your IT Budget through Energy Efficiency Heather Feigum Focus on Energy Advisor.
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
Smart Grid Schneider Electric Javier Orellana
BENEFITTING FROM GREEN IT – FINDINGS FROM THE SUSTEIT PROJECT Professor Peter James
Solar Energy Ashley Valera & Edrick Moreno Period 6.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
Green Action Team Meeting February 19, 2009 Status of Major Deliverables Green Building Initiative (Exec Order S-20-04)
Focus on the benefits Keep everyone informed and involved Get energy efficient around the office.
Calculating a CO 2 Inventory for Pacific Northwest National Laboratory Federal Environmental Symposium – East Kim Fowler Senior Research Engineer Pacific.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
Data Center Energy Efficiency SC07 Birds of a Feather November, 2007 William Tschudi
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
ENERGY STAR OVERVIEW November Overview What is ENERGY STAR? History Accomplishments Key Strategies –Labeling –Superior Energy Management Building.
Enabling High Efficient Power Supplies for Servers
DOE Data Center Energy Efficiency Program and Tool Strategy
Opportunities in the Changing Energy System
Introduction to Green IT
Smart Cities Uroš Merljak.
Anna Garcia Air Innovations Conference August 2004
Presentation transcript:

Introduction to Green IT February 11, 2010 Bellevue Community College Seminar

Agenda  Problem/Background  What is Green IT? Energy Efficient IT Architecture Advanced Power and Cooling Integration with Building and Landscape Architecture Using IT to enhance environmental education and responsibility Using IT to save energy  Green IT Alliance Projects Thin-Client Computer Lab Grid Computer Project Solar/Wind Projects Ornamental Cooling Pond/Living Roof Interpretive Walk

1 large, 100,000 sq ft Datacenter  30MW Power Consumption Equivalent Power Consumption of 60,000 individuals Equivalent CO 2 Output of 6,700 Households or 23,000 cars Annual Power Bill $0.02/kWhr (Quincy) $0.05/kWhr (Eastern Washington) $0.09/kWhr (National Average) $0.12/kWhr (Green Power Average) Wild Horse Wind Farm, ~ 230MW Peak, 100 MW average ~ 8,600 Acre Range, 167 Acre Turbine Area, $380 Million Investment $6/Watt, 30MW with Eastern Washington insolation ~ 300 Acres of Panel Area, $1.1B investment! Data Center Problem

Background  Washington State Governor’s Agenda Priorities supportive of Clean Technology Initiatives and Job Growth  I-937, LEED for Gov Bldgs, Bio-Diesel Initiatives, etc.  National Recognition of Huge Problem associated with Energy Demands for Power/Cooling of IT Infrastructure  Fastest Growing Segment of Energy Demand  Green Building/Sustainable Architecture is a Major National Thrust  Very Little Effort to Address IT Infrastructure  Ground Floor Opportunity Exists to Take a Leadership Position in Integrating Green IT Technologies into Green Building Practices

Pullman IPZ  Pullman IPZ Strategy is to Focus on collaborative projects in the following areas Green IT Clean Technology Alternative Energy Sustainable Architecture  Execute High Profile Projects that Create Future Economic Opportunity Foster Innovation and Collaboration among the IPZ Partners Prioritize based upon Future Business Growth Potential

Technical Emphasis Areas  Energy Efficient IT Hardware/Software/ Network Architecture  Virtualization/Grid Computing/Thin Client  Power and Cooling Infrastructure  SprayCool/DC Distribution/Power Aware  Integration into Building/landscape Architecture  Modular Data Centers, Cooling Pond/Radiant Floor Heat/Green Power

Projects  IT Architecture  Thin Client/Virtualization Training Lab  Workgroup Cluster Energy Productivity  Advanced Power and Cooling  Renewable Energy Powered IT Solar Project Wind Project  Server Power and Cooling Liquid Cooling/Waste Heat Re-Use DC Distribution  Integration with Bldg and Landscape Architecture  Ornamental Cooling Ponds  Living Roofs  Interpretive Walk/Wetland Restoration

8 Problem Statement Why Data Centers?  Highly energy-intensive and rapidly growing  Consume 10 to 100 times more energy per square foot than a typical office building  Large potential impact on electricity supply and distribution  Used about 45 billion kWh in 2005  At current rates, power requirements could double in 5 years.

9  Lack of efficiency definitions for equipment and data centers ( Being addressed by )  Service output difficult to measure, varies among applications  Need for metrics and more data: How do we account for computing performance?  Split incentives  Disconnect between IT and facilities managers  Risk aversion  Fear of change and potential downtime; energy efficiency perceived as a change with uncertain value and risk Key Barriers EPA Report: Call for Pilot Projects, Test Centers, Federal Leadership by example

10 Energy Efficiency Opportunities Server Load/ Computing Operations Cooling Equipment Power Distribution & Conversions

11 Data Center Energy Use Typical Data Center Energy End Use Server Load /Computing Operations Cooling Equipment Power Conversions & Distribution 100 Units 33 Units Delivered 35 Units

12 Typical Energy Flow/Use Server Load/ Computing Operations Cooling Equipment Power Conversion & Distribution Delivered Power Electricity Generation & Transmission Losses Fuel Burned at Power Plant

13 Will reduce cooling needs Typical Energy Flow/Use Server Load/ Computing Operations Cooling Equipment Power Conversion & Distribution Reducing server power requirements Lowering power conversion losses Electricity Generation & Transmission Losses Delivered Electricity …ultimately reducing fuel burned at the power plant Reducing power demand and losses Fuel Burned at Power Plant On-Site Generation further reduces losses and emissions!

14 Server Load/ Computing Operations Cooling Equipment Power Conversion & Distribution Alternative Power Generation High voltage distribution Use of DC power Highly efficient UPS systems Efficient redundancy strategies Load management Server innovation Energy Efficiency Opportunities Better air management Move to liquid cooling Optimized chilled-water plants Use of free cooling On-site generation CHP applications Waste heat for cooling Use of renewable energy Fuel cells

Thin Client Training Lab Thin Client UPS Server Meter Standard PC UPS Server Meter

Thin-Client Cluster Monitoring

Thin Client Testing  Tested two exciting new Architectures  “Cloud Computing Model Managed desktop, reboot to restore, hosted model ~70% energy reduction, 25% installed cost reduction  X550 “Five head Graphics Adapter style Standard Windows PC architecture\ Transparent to user ~70% energy reduction, 60% installed cost reduction  Both Solar power compatible

IT Metering/Energy Productivity

Energy Productivity

Energy Use by Application Average Utilization (44.98%)

Green Grid Computer  Supercomputer Cluster up!  WSU paid for fiber connection between WSU and GITA  GITA bought additional switch gear to create “grid cluster”  WSU Added nodes with user demand  Future Directions  Add long-haul connections between other campuses and PNNL  Add advanced architectures

Green Grid Cluster

Expanded Cluster

Thin Client Training Lab Thin Client UPS Server Meter Standard PC UPS Server Meter

Renewable Energy Powered Enterprise IT Concepts  Use Renewable Energy as part of mission critical power infrastructure for Enterprise IT Networks  Test Grid-Tie Systems with Battery Back-up to act as the UPS/Back-Up Generation for Enterprise IT Infrastructure  Test Thin-Client Architectures with DC Distribution and Battery Back-UP

Project Objectives  Solar/Wind Project  Install Real Time Weather Monitoring Wind Speed, Direction, Incident Solar Radiation, Temperature, Humidity, Pressure, etc.  Install All Solar and Wind System Compare Power Distribution Architectures Integrate Smart Grid Technology Create Test Lab for Technical/Economic Assessment Conduct Education/Outreach and Business Development  Power Data Center/Plug-In Vehicle Charging Metered Power/Secure Identification Auto-Connect (Bluetooth or RFID??)

Renewable Energy Project

Cut out 5 conversion steps, should improve efficiency by 50% or more Traditional Installation ~ $11,000/Server Installation Cost Proposed Installation ~ $6,700/Server Installation Cost*

Architecture Option

Preliminary Results

 Testing Direct Server Coupling  ~2-3% Efficiency Gain  ~50% Installation Cost Reduction  Testing UPS DC Operating Characteristics/Efficiency Preliminary Results

Project Updates  Solar Project Progress  Procured 54 Solar Panels, Outback Inverter, Battery Backup System  Tested three architectures new architectures Direct Server Coupling at high voltage Low voltage distribution for client terminals Grid-tie with battery back-up installed as Server rack UPS  Installation Underway  Issues/Risks  Code compliance for new architectures/UL Certification of designs, new components

Traditional Architecture UPS Standard PC Clients

Grid-Tie Solar as IT UPS Battery Back-Up Charge Controller Grid-Tie Inverter

DC Thin Client Architecture Battery Back-Up Charge Controller Grid-Tie Inverter Charger 4 to 8 times Less Power than Standard PC’s

Solar PC Cluster

Solar Installation

Metered Charging

Advanced Liquid Cooling  The use of liquid cooling of servers enables reductions in power by rejecting heat directly outside into ornamental cooling ponds, or the re-use of heat for office heating in the winter.

Ornamental Cooling Ponds Traditional Approach Replace Tower with Pond, in Summer. In Winter, re-use Heat for Office Spaces

Ornamental Cooling Pond

 Water Line      HEAT Server Heat Re-Use

Wind Power

Weather Monitoring and Data Collection

Living Roof

Interpretive Walk Restoration Self Contained Solar Power Kiosk

Rural Broadband Wireless Access/Subscriber Computing Partners Green IT Alliance Integration, Power Testing Galexis Technologies Wireless System Design/Integration/Service First Step Internet ISP Safedesk Low Power Computer Platform Green Wireless

Interpretive Walk Restoration Solar Powered Irrigation System

Conclusions  Green IT  IT is a major power consumer  A significant percentage of the power is wasted  Opportunities exist to dramtically improve IT energy efficiency  IT can be a very beneficial part of the Green movement