13 APS. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.

Slides:



Advertisements
Similar presentations
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Advertisements

Chapter 3 Creating a Business Letter with a Letterhead and Table
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
Enter the application Click to advance to the next slide.
Project Information: Customizing and Printing Lesson 7.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation. All.
The sequence of folders to a file or folder is called a(n) ________.
TUTORIAL 3 TESTING THE COMMERCIALIZATION STRATEGY Part 1 - Steps to enter the sales and variable production costs.
16 Cost sheet. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Supplier Invoicing North America
Education Google Calendar (GCal) English. Education Upon completion of this course, you will be able to:  Navigate the GCal interface  Search your calendar.
Welcome to Kronos Employee Training – Understanding the Kronos Display.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
WEB Apps Product Info. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
© Paradigm Publishing, Inc Access 2010 Level 2 Unit 1Advanced Tables, Relationships, Queries, and Forms Chapter 4Creating and Using Custom Forms.
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice SISP Training Documentation Template.
Parallel resources. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Templates. © beas2009 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way.
Event control. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
V8.0 Upgrade. Overall Changes Task List Additions Counts in Employer/Contact Profiles Search Results Page – Mass Partial Delete Defaulting Allowed.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
Kaba B-Net terminal Functionality. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents.
Alerts Manager Refer to Slide 2 for instructions on how to view the full-screen slideshow.Slide 2.
Microsoft Publisher 2010 Chapter 7 Advanced Formatting and Merging Publications with Data.
19 Data import. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
My Workspace ELearning in Sakai Randy Graff, PhD HSC Training.
Microsoft Access 2010 Chapter 8 Advanced Form Techniques.
Establishing Resources Lesson 2. Skills Matrix SkillsMatrix Skill Establish people resourcesEstablish individual people resources Establish a resource.
Inventory. © beas2009/Page 2 This documentation and training is provided to you by beas gmbh. The documents are neither approved nor in any way acknowledged.
Resource groups. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Microsoft Access 2010 Chapter 4 Creating Reports and Forms.
Editing Basics Lesson 8. Skills Matrix SKILL #MATRIX SKILL 2.2.1Cut, copy, and paste text 2.2.2Find and replace text 4.1.1Insert building blocks in documents.
17 Personnel Time Recording A Tutorial for Advisers/Key Users.
2004/051 >> Supply Chain Solutions That Deliver Users.
PestPac Software. Pay On Commission Commission can be paid on Production, Receipt, or Up-Front. Production: Commission will be paid when work is completed/an.
Variants with be.as script. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither.
09 Calculation. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
08 MRP. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
 Tata Consultancy Services  SAP AG FI - Accounts Receivable.
 Tata Consultancy Services CONTENTS PRODUCTION ORDERS METHODS OF CREATING PRODUCTION ORDERS Results of creation and release of production order. Production.
04 Master Data – Resources
16 Cost sheet
Dalikoo User Guide.
22-INTEGRATION HUB
12a Product configurator Example and data flow
Factory calendar
17 Personnel Time Recording
Chapter 7 Advanced Formatting and Merging Publications with Data
13 APS
06 Master Data – Item
12 Product Configurator
09 Calculation
07 Master Data – Tools
Event control
PROJECT MANAGEMENT Bill Biddle.
Variants with be.as script
Resource groups
Lesson 10: Epic Appointment Scheduling Viewing Provider’s Schedule
Lesson 10: Epic Appointment Scheduling Viewing Provider’s Schedule
14 Bin location management
Scrap factors
Lesson 10: Epic Appointment Scheduling Viewing Provider’s Schedule
Parallel resources
20 Batch transfer
Presentation transcript:

13 APS

© beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at and

© beas group 2011 / Page 3 Requirements for this Tutorial You will need a good grasp of: The basics of SAP Advanced be.as skills

© beas group 2011 / Page 4 Learning Targets After working through the lesson, you will be able to: Generate and edit calculation types Generate and edit calculation scenarios Carry out planning in the graphical/detail view

© beas group 2011 / Page 5 Agenda APS 1: General 2: Working with APS

© beas group 2011 / Page 6 General (Online Connection) Database be.as APS  Production planning is always implemented directly from the production data. A copy of the data is never created for planning.  in the graphical view too, the calculation is always performed from the original data. Each change therefore always directly affects production.  If an incorrect action was unintentionally implemented in the graphical view, effective undo functions are available.

© beas group 2011 / Page 7 General (Important Parameters) Production order Define work orders and delivery dates APS Resources Enter capacities in master data Calculation types Forward, backward, etc Factory calendar Basis for resource scheduling Backward scheduling: optimized for material, scheduling to the latest possible date with consideration of time and material reservations Forward scheduling: resource optimized, time reservations are considered. Standard method for rough and detailed planning. Re-allocate forward: resource optimized from start date. If delivery date cannot be met, resources are overloaded stepwise, until the delivery date can be met Catch up: For planned orders, which have not startet yet. Operations are moved and compressed. Backward simulation: determines the latest possible start date without consideration of time reservations and material availability

© beas group 2011 / Page 8 General (Activating the APS License)

© beas group 2011 / Page 9 General Scheduling: Backward  Backward- calculation is optimized for material requirement  backwards from date of delivery, start date as late as possible.  2 order related sub-assemblies.  Subassemblies are finished, when „Assembly 1“ starts.

© beas group 2011 / Page 10 General Scheduling: forward  „Assembly 1“ can be produced only, after all sub-assemblies have been finished.  last operations of the sub- assemblies are linked to the first operation of „Assembly 1“.

© beas group 2011 / Page 11 Agenda APS 1: General 2: Working with APS

© beas group 2011 / Page 12 Work with APS Standard: planning based on work orders Resource: planning based on resources Examples: -Planning for resource-critical machines (eg. laser machine) -Planning view only for the next 5 days and only for one resource group „laser machine“

© beas group 2011 / Page 13 Work with APS (planning view)  Filter production orders by resource usage and other criteria  Sort production orders (Planning with priority)  Plan and dispatch production orders

© beas group 2011 / Page 14 Work with APS (planning view)  Set flags for manufacturing control -MRP -Scheduling ID -Posting

© beas group 2011 / Page 15 Work with APS (planning view)  Block work orders  Direct access on work order structure

© beas group 2011 / Page 16 Work with APS (planning view)  Shortage per work order  Material requirement per work order

© beas group 2011 / Page 17 Work with APS (Sorting in the planning view)  Pre-sort via right click on column header – sort by column xyz.  Left click on document number and keep mouse button pressed. Move the selected entry (drag and drop).

© beas group 2011 / Page 18 Working with APS (Graphical View – PO – Description) Header Gantt Display 1.Menu header: Depends on selected area 2.PO list / resource list: all WOs/resources that were selected in the planning view are displayed, individually expanded. 3.Time scale: Day, hour 4.Gantt display: each individual assembly in turn has its own bar

© beas group 2011 / Page 19 Working with APS (Structuring a Routing Position)

© beas group 2011 / Page 20 Working with APS (Menu Area) Depending on the field just selected in APS, the menu automatically adjusts. Only those fields that are currently necessary are displayed.

© beas group 2011 / Page 21 Working with APS (Moving Operations)  Routing positions can be freely moved  You can configure what happens after the move.  select the Settings tab and then select the desired setting in the After moving field.

© beas group 2011 / Page 22 Working with APS (New Calculation) to carry out a new calculation in the graphical view, at least one operation must be selected. After you have done this, you can use the button to begin calculations.

© beas group 2011 / Page 23 Working with APS (Undo) it is possible to undo the last action carried out in the graphical view. be.as stores the 10 most recent actions.

© beas group 2011 / Page 24 Working with APS (Resource Utilization) 1. Utilization Shows the overall utilization of the resource. 2. Resources Shows the individual operations which are currently dispatched to the resource.

© beas group 2011 / Page 25 Working with APS (Resource Utilization) resource group allocated to an operation Alternative operation allocated to an operation this can be done directly in APS. In the lower area operation can be planned and dispatched

© beas group 2011 / Page 26 Working with APS (Grouping Function) 1. Hold down the Ctrl+ key and click on the routing positions 2. Click on the empty Gantt area, hold and drag a rectangle over all routing positions to be selected 3. Hold down the Ctrl+ key and click on the scale (upper timeline): All routing positions from that day are selected.

© beas group 2011 / Page 27 Summary You can now: Generate and edit calculation types Generate and edit calculation scenarios Carry out planning in the graphical/detail view

Thank you for your participation!