ER Bundle “final” design D. Giugni / INFN Milano D. Giugni 2011-07-14 nSQP's meeting 1.

Slides:



Advertisements
Similar presentations
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
Advertisements

PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.

Router. Switch Repeater Cable is the medium through which information usually moves from one network device to another. It used to connect one network.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
E-readout workplan & organization Successfully passed FDR – Draft report: ATL-IP-MR-0003ATL-IP-MR-0003 Mechanical baseline is defined Focus now more on.
Composite Battery Box design discussion To fit Mike W's Porsche 944 Former FVEAA Club Car.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Insulated rendering systems General Principles of Thermal Insulation.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
FE-I4a Single Chip Card issues V. Tyzhnevyi HEP group, University of Manchester.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Cable for UPAMD Steve Sedio Foxconn 7/19/2011. Requirements: Power, 25 milliohms max – AWG selected by worst case resistance and operation at 50C Signal.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Activities Status and Plan for the week D. Giugni Monday Meeting
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
David Nelson SQP E-board November 4, Pixel nSQP E-board Presented by David Nelson
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
ASSEMBLING THE PCB Have the PCB in front of you as shown. Make sure there are no copper tracks showing. This side is called the component side.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
V. Bobillier1 Cable installation status.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
Update on the activities in Milano M. Citterio and N. Neri on behalf of INFN and University of Milan SuperB Meeting: SVT Parallel Session.
NSQP’s + design implications D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
Transmission Line Studies Need to understand data transmission at 640 Mbps along bus tape. Analytic formulae FEA calculations from Roy. Network analyser.
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Metals. Ferrous metals – contain iron Non-ferrous – contain no iron Alloys – a mixture of two or more metals.
Mauro Citterio - Mi meeting
Chapter 7 Transmission Media
Plans for this week MWPC: wire stretching today
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Carbon wire sensor based in semiconductor strain gauges
Activities Status and Plan for the week
Activities Status and Plan for the week
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Introduction to Computers
Parts exchange for HL-LHC AUP Q1&Q3
Describe the properties of the following object?
Twinax A Twinax is a dual coaxial cable with a common shield (“Extension” of TWP). 3 custom prototypes were produced for R&D purposes. Currently Cu wire.
WA105: Order Status IFAE Thorsten Lux.
Presentation transcript:

ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1

Assumption I am going to present what I would call “final design” of the ER bundles... with some caveats: –The transmission properties of the data line are not covered here. We cannot say that it is fully qualify. A “system” test with all the parts (E-board, ER Bundle, Optoboard) has not been done yet. –I assume hereafter that it is or, it will be, ok. Therefore the design is “final” if the system test will show good results. –If it is true, then the design is really final: Wires, boards, connectors Mechanics: connector shells, strain releases, assembly procedures Shielding (*) and grounding. –(*) There are still two options for the shielding braids: tin copper and carbon. It does not affect the design nor the fabrication procedure D. Giugni nSQP's meeting2

Details from PP0 to Opto-box D. Giugni nSQP's meeting3

Details at PP0 D. Giugni nSQP's meeting4

Details at PP1 D. Giugni nSQP's meeting5 PP1 End Plate Silicon feed through Heat shrinkable tubing NOMEX Braid KEVLAR Braid Tin Cu/ C fiber + AWG 28 Tin Cu drain MYLAR Foil MWS Wires KEVLAR Braid + Drain wire  “Outside” to Optobox“Inside” to PP0 

Details of the Connector D. Giugni nSQP's meeting6 KEVLAR Braid Heat Shrinkable tubing Cu/ C Braid Brass Hollow Plate Brass Ferule MWS Wires Drain Wire Shell (5um Ti/Ni coating)

Connector Board assembly D. Giugni nSQP's meeting7 Tin Cu Braid Heat Shrinkable tubing KEVLAR Braid Ferule Hollow Brass Plate Silder Drain Wire Connector Shell (not Coated here)

Connector Shell Sputtering Sputtering seems to be ok. Tested 2um Ti coating Good adhesion Next layer can be ~3um Cu or Ni Ni preferred (by me) Total coauting th. ~5um Fast an almost inexpensive D. Giugni nSQP's meeting8 Uncoated SLA shell 2um Ti spattered

D-bundle production plan Re-spin the Cable and D/B Connector board. Some already in hands. Need to load with connectors and capacitors Re-spin the production of the new shells (both D&B type) Spattering available. All braids (NOMEX, KEVLAR, Cu and Carbon fiber) in hands Silicon casting available at CERN and ready to go. Can assemble 14 D-ER Bundles with all the final parts... however we are in a vacation period. –10 bundles with Ti Cu braid –4 Bundles with CF braid. D. Giugni nSQP's meeting9