IMPLEMENTING A MULTI- LOCATION EQMS SYSTEM – LESSONS LEARNED Aaron Schmick - Quality Systems Manager, Monosol.

Slides:



Advertisements
Similar presentations
Aims e-Business Applications An Overview of Aims Inventory and Procurement Management Design By: Shaikh Abdul Aziz.
Advertisements

Supplier Contract Management © 2006 Oracle Corporation – Proprietary and Confidential 2. Author & Negotiate 5. Amend4. Monitor and Track 6. Renew & Closeout.
MediTract Contract Management Software
Remote Inventory Management System RIMS Cost Control Solutions, LLC.
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Micro Control Solutions Stability System II rev. 6.4
“The Honeywell Web-based Corrective Action Solution”
Is your company drowning in a sea of documents and regulations ? Quality Systems Integrators presents... TMSWeb Quality Management Compliance System.
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
©2011 Team Quality International Inc. PO Box , Simi Valley, CA 93094, USA Tel:
Maintenance Management The Replacement of Legacy MMS Software With Oracle EAM.
Introducing SysAid 5.1 New Features. 12/ 2 Content New Knowledgebase and FAQ abilities Improved Search Additional protocols Improved history and.
Company Background: Nestlé SA is a giant food and pharmaceuticals company that operates virtually all over the world. Headquartered in Vevey, Switzerland,
Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director.
ISO 9001 : 2000.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
HACCP Manager Software™
Modular and Portable Buildings Generic Scheme for temporary accommodation 2010 Implementation 2013 Proposals Key drivers.
MFRPS Lesson Learned North Carolina
SAFETY MANAGEMENT INFORMATION SYSTEM By: Fahad Ishfaq Senior Engineer Safety.
QAD Quality Management Systems Roll Out November 17, 2014.
FPSC Safety, LLC ISO AUDIT.
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
GOOD MANUFACTURING PRACTICES Training about our Food Safety Plan
Midwest Documentum User Group Harley-Davidson Documentum WCM 10/10/2006.
1 Effectively Managing Global Engineering Licenses Kimberley A. Dillman IT Solution Architect – Engineering Delphi Corporation
Fundamentals of ISO.
A Product of Copyright © ANGLER Technologies AURA – Quality Compliance Monitoring & Process Management System.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
GOODWILL OF NORTHWEST NORTH CAROLINA, INC. EMPLOYEE TRAINING DATABASE PROTOTYPE.
Confidential and proprietary to U.S. Bank 1 Corporate Payment Systems Adwebportal Training.
Q5 Systems Limited “Pay me now or pay me later!” Reducing field data capture, reporting, trend analysis and corrective action by up to 70%
© 2009, ioMosaic Corporation; all rights reserved. Do not copy or distribute without the express written permission of ioMosaic Corporation Process Safety.
Visit us at E mail: Tele:
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
Auditing Information Systems (AIS)
After this class, you will be able to:  Apply the system settings required for Accela EDR  Apply the suggested customization options for Adobe Acrobat.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Security in ERP Systems By Jason Rhodewalt & Marcel Gibson.
Visit us at E mail: Tele:
Soil Excavation and Concrete Penetration Permitting Process at LLNL Dennis Chew Plant Engineering Department September, 2006 UCRL-PRES This work.
Systems Development Life Cycle: Mean Motocross Machines By: Cortney Robertson Paul Garcia.
18 th April 2007 Dan Lyon Vice President. 2 ACCRA Manufacturing, Inc. Supplier of Aerospace machined parts and assemblies  Founded in 1978  Bothell,
Elga LTD Contact Management System. Elga UK Background of Elga Research of the project Why Notes? Progress to date Benefits of system Future potential.
April 23, 2008 Electronic Certified Payroll Sandia National Laboratories.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
ENGINEERING SERVICE CENTER EMSWeb FES-West 2009 ENVIRONMENTAL MANAGEMENT SYSTEM WEB SITE (EMSWeb) Eugene Wang NFESC -- Code 423 (805)
York Laboratory Information Systems Restructuring Proposal IEM 5303 Term Paper Fall 2000 Chris M. Forth Senior Project Engineer York International.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
ERP/QMS by PMI Aerospace ERP/QMS by PMI Aerospace
ACTION TRACKING SYSTEM
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
Quality Assurance System Field Service Automation
Construction Worksites
Awareness program on ISO/TS16949:2002
Graduation Project (II): Operations Improvement at Mhanna Factory
Fundamentals of ISO.
Quality Assurance System Field Service Automation
Introduction to Internal Audits
Supplier Improvement Program
GFSI Certification What Top Management Needs to Know
You’ve bought a LIMS, now what?
Quality Assurance System Field Service Automation
Quality Assurance System Field Service Automation
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

IMPLEMENTING A MULTI- LOCATION EQMS SYSTEM – LESSONS LEARNED Aaron Schmick - Quality Systems Manager, Monosol

EQMS Users Group Meeting 2

MonoSol Business Segments

Consumer Products Worldwide Confidential 4

Late 1950’s – MonoSol acquired by Chris-Craft Industries. Began developing water-soluble films for the aerospace and solid surface markets, early developments of MonoDose segment 1999 − MonoDose launches in EU laundry detergent market − Entered the Global ADW market 2010 – Developed and installed Generation III Manufacturing Line 1953 − Founded as an automotive foam manufacturer 1990’s − Spearheaded the worldwide use of water soluble films in the agrochemical industry 2001 − Became independent from Chris Craft 2004 – MonoSol acquired AquaFilm 2012 − Acquired by Kuraray … – Developed and installed Generation II Manufacturing Line – Spins off pharmaceutical division, MonoSol RX; two separate businesses 2005 MonoSol History 2013

England MonoSol Manufacturing Locations

Business Segments

Plant 1 Portage, IN Plant 2 La Porte, IN Headquarters & R&D Merrillville, IN MonoSol Locations in the US

9 Duneland Cast film site USA

EQMS Implementation Confidential 10 MonoSol had a Document Control Software in place that was out of date and unsupported by the manufacture Project was started to implement a replacement 20 potential candidates were reviewed and compared and narrowed down to 4 – One of the 4 was the same manufacturer as the one currently in place. Demonstrations were conducted with the 4 potential candidates and EQMS was found to be the most user friendly and had the most useful additional modules. Two candidates were presented to Senior Management, EQMS and the software that was in place, for consideration with a push to change over to the Qualsys EQMS software. Approval was given quickly. Qualsys quickly took the lead as the project manager for implementation. The decision was unanimous to start with the Document Manager Module.

Document Control Confidential 11 Aggressive timeline was developed by Qualsys MonoSol had to determine an effective method of transferring from the current software to the new without losing any critical data such as revision dates and past approvals.

Document Control cont. Confidential 12 Difficulties With Implementation – A lot of upfront building needed, requiring much thought and consideration. Approval paths, permissions, escalation paths, layout of the files. – Launching 1 system for all sites to share, sites having different accessibility options. – Establishing review protocols, and frequency – Over thinking the permissions portion of the structure, caused difficulties in adding groups to document types later.

Document Control cont. Confidential 13 Greater Advantages with implementation – With the enforceable notification option we are able to track employee review and training. – Escalation paths help ensure approvals are completed in a timely manner. – Document review and expiration date notifications helpful to ensure completion. – Ease of launching a document revision by non-document control owner.

Audit Manager Confidential 14 Audit Manager was installed and set up to be initially utilized for ISO 9001 and RC14001 internal auditing. Additional usages are in discussions for many other areas – Forklift inspections, daily – Safety audits – Supplier Audits

Audit Manager cont. Confidential 15 Difficulties with implementation – Auditors new to electronic auditing, attached to pen and paper audits. – Auditor not utilizing the evidence attachment or auditee feature, also adhering to the checklist and not auditing the process thoroughly enough. – Training of auditors in multiple sites. – Some confusion on the closing of audits with and without findings, ability to delete an audit with no findings. – Some lack of flexibility in the set-up All or nothing with the text required fields Some audits lost due to auto log off, learning curve

Audit Manager cont. Confidential 16 Greater Advantages with implementation – Ease in creating new audits – Simple to launch a round of audits – The process of making adjustments to audit checklists and questions is simplistic. – Ability to audit remotely greatly increased. – Evidence attachment – Availability to review past audits much more simple.

Issue Manager Confidential 17 Issue Manager implemented to control our Customer Complaints and corrective actions. – CARs – RMAs – Credits – Replacements

Issue Manager cont. Confidential 18 Difficulties with implementation – Flexibility of some of the fields – Difficulty to track complaints by weight – Would not directly tie into our RMA numbering system causing us to continue using the current RMA database – No printable form for CARs or RMA for distribution to a customer or supplier. – CAR process has been temporarily dropped for reconsideration, and restructuring. – Accessibility (my additional modules)

Issue Manager cont. Confidential 19 Greater advantages with implementation – Tracking of issue by customer/site – Ability to tie all documents, evidence, and reports to the issue – Ease of monitoring to closure – Adaptability

Up Next Confidential 20 We are moving forward with implementation of the Training Module in our Hartlebury UK Facility. Investigate and implement the CAPA manager to potentially replace our current Access Database process Investigate and implement the Supplier Management Module with your purchasing dept.

21 Questions