Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE),

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners.
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
LIBER Annual Conference, 2008, Istanbul 1 LIBER 37th Annual Conference, Istanbul, 3 July 2008 DRIVER: Building a sustainable infrastructure of (European)
This presentation arises from the project HEALTH EQUITY – 2020 which has received funding from the European Union, in the framework of the Health Programme.
1 The EPO Co-operation Programme to reorient patent information centres Heidrun Krestel European Affairs, Member States 4 October 2010.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
REAKT Strategies and tools for Real Time Earthquake Risk Reduction WP8: Dissemination Sandra Laskowski, Friedemann Wenzel (KIT) REAKT - Kick-off Meeting,
TENCompetence Management Issues: WP1 Eric Kluijfhout.
4 October 2001 SEESCOASEESCOA STWW - Programma Software Engineering for Embedded Systems using a Component-Oriented Approach Vergadering Gebruikerscommissie.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINIBILITY PLAN Budapest, June 2007.
IST Open, self organising repository for scientific information exchange - SciX Žiga Turk University of Ljubljana, Slovenia
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme Sergio Fantinel (INFN-Padova/LNL)
ERRIN regions tasks. ERRIN regions involved (10) Eszak-Alfold (HU) Lodz (PL) South Moravia (CZ) Basilicata (IT) Örebro (S) Murcia (ES) Slovenia (SI) Northern.
Part I : The EUMEDGRID-Support Project Abderrahman El Kharrim Joint EPIKH/EUMEDGRID-Support Event in Rabat Rabat,
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
Name Speaker This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding from the European.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
WP5 Strategy Domenico Giardini SED ETHZ. WP5 Objectives Harmonize national implementation Integrate the European scientific community Establish Centres.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
The Preparatory Phase Proposal a first draft to be discussed.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
E-SENS Electronic Simple European Networked Services WP2 kick off Berlin, Germany Apr 10th 2013.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
EPOS-PP Work Package 3 Governance John Ludden British Geological Survey/NERC U.K.
EPOS a long term integration plan of research infrastructures for solid Earth Science in Europe Preparatory Phase Project
Supported by the European Commission, grant agreement pending EUROSUPPORT V “Improving sexual and reproductive health of PLWH” Kick-off meeting, May 6-7,
CLARIN work packages. Conference Place yyyy-mm-dd
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and liaison with pan-European initiatives Athens,
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme WP5 Application Support Marco.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EMIDOI - Electronic Marketplace for Information on Decommissioning of Offshore Installations eContent Concertation Meeting 11 october Frankfurt.
European Network for Biodiversity Information. Why ENBI ?
eu.org Anita Heward Europlanet 2020 RI - Impact, Outreach and Engagement.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
Financial Framework for TCS implementation WP 5 Domenico Giardini Rome, 5 Oct 2015.
Lilli Freda and WP2 Team EPOS Communication Plan communication, dissemination, exploitation EPOS kick-off meeting 5 th – 6 th – 7 th October 2015.
Why are we here? projectsnational coordinationWorking groupsTCS.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
A. Review current infrastructure status within Europe Review and overview (national and European scale) of existing and planned Observational infrastructures.
WP6 Technical Work J Lauterjung GFZ Potsdam. Objective The main objective is the development of a novel and efficient e- infrastructure concept addressing.
Dissemination of SBS data and technical visits to MSs item 10 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg.
EUNetPaS is a project supported by a grant from the EAHC. The sole responsibility for the content of this presentation lies with the author(s). The EAHC.
REAKT Strategies and tools for Real Time Earthquake Risk Reduction WP8: Dissemination Sandra Laskowski, Friedemann Wenzel (KIT) REAKT - 1st Annual Meeting,
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
WP4 : Financial work Elisabeth KOHLER Helle PEDERSEN (CNRS)
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
II Course on GBIF Node Management Arusha, Tanzania 31 st October and 1 st November 2008 GBIF Training Materials and Future Plans Alberto GONZÁLEZ-TALAVÁN.
LINKVIT KICK-OFF MEETING ROME 28TH OCTOBER 2013 WP 6 Dissemination and Exploitation.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
AMICI WP1 – Management, coordination and dissemination
INTAROS – Integrated Arctic Observation System
Management - coordination
2010, European Year for combating poverty and social exclusion
WP7 - Dissemination of Results & Exploitation
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
THEMES Thematic Network on Safety Assessment in Waterborne Transport
Civil Protection Financial Instrument – Prevention Projects
BioMedBridges – Work Packages 2 & 12
AMICI WP1 – Management, coordination and dissemination
VCC 4 General VCC meeting, 2/3 April 2012, Utrecht, The Netherlands
Overview of Project EU Fruit Network; EUFRUIT (Coordination & Support Action) 21 partners (DK, BE, FR, DE, NL, UK, ES, CH, IT, RO, HU, LT) 3 years at 1.84.
Draft CIS work programme
4.2 Manure management Inventory
Implementing the ESS Vision 2020
Presentation transcript:

Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE), PAS(PO), UCPH(DK), ASCR(CZ) Objectives: - Providing outreach and dissemination - Identifying further potential downstream users - Promoting the EPOS Research Infrastructures - Develop capacity building through specific training initiatives - Assessment of EPOS impact on stakeholders and users Categories of stakeholders: i) National Research Organisations & funding agencies ii) EPOS data providers [WGs in WP6] iii) EPOS (RI) data users (including Academia) iv) Data and services providers and users outside the research community (including industry) WP 8: Stakeholder interaction and dissemination

Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE), PAS(PO), UCPH(DK), ASCR(CZ) Tasks 8.1 Stakeholder promotion and impact: governments and industry 8.2 Stakeholder promotion and impact: data providers and users 8.3 Facilitating the EPOS promotion strategy 8.4 EPOS promotion activities Categories of stakeholders: i) National Research Organisations & funding agencies ii) EPOS data providers [WGs in WP6] iii) EPOS (RI) data users (including Academia) iv) Data and services providers and users outside the research community (including industry) WP 8: Stakeholder interaction and dissemination

WP 8: Deliverables and Milestones. Deliverables: D8.1 – Web portal and user interfaces [M6/12/…/48] D8.2 – Brokerage events with stakeholders at national and European level [M18/36] D8.3 – Impact validation through web services [M24/36/48] D8.4 – Editorial promotion activities [M24/48] D8.5 – Report on dissemination activities [M36/48] D8.6 – Report on stakeholder interactions [M36/48] Milestones: MS37 – web dynamic overview stakeholders [M6] MS38 – appointment P&U commission [M6] MS39 – WP8 and stakeholder meetings at EGU [8, annual] MS40 – EPOS information booth at EGU [8, annual] MS41 – Stakeholder category (iv) meeting [24, ??] MS42 – P&U commission meeting [18/24/36] MS43 – Stakeholder category (ii) meeting [36] MS44 – Outreach meeting all participants [18/30]

Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE), PAS(PO), UCPH(DK), ASCR(CZ) Starting strategy: 1. Set-up material, actions, detailed actionplan by core group (KNMI, INGV, NERC and UIB) 2. Review relevant interactions with other WPs WP4-7 all have specific requirements (some specified in this meeting) Make sure task interactions are specified. 3. Actionplan Requires interaction with all participants and WP4-7 WP leaders 4. Involve other participants, discuss and distribute specific actions. (based on action plan) - Resources are limited! Make sure we identify priorities, not overreach, optimal coordination WP 8: Stakeholder interaction and dissemination

Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE), PAS(PO), UCPH(DK), ASCR(CZ) Core group actions first months : - NERA dynamic and static web pages (Task 8.4 coordinated with WP1) - Create and produce outreach material for distributing by participants (Task 8.3) - Provider and User (P&U) committee (Task 8.1) - Identify potential data providers & users (Task 8.2) - Initial promotion by core participants (Task 8.4). - WP8 action plan (Task 8.3 and Task 8.4) - WG8 meeting EGU2010: discuss and start running action plan - EPOS exhibition booth at EGU2010 (Task 8.2, 8.3 and 8.4) WP 8: Stakeholder interaction and dissemination

Outreach Material on the way EPOS exhibition materialEPOS web site: