Carrier Pre-Select Meeting BT Systems Interface Roadmap

Slides:



Advertisements
Similar presentations
Connect. Communicate. Collaborate I-SHARe Anand Patil, DANTE NML-WG, Open Grid Forum 22, Cambridge (MA), 26 February 2008.
Advertisements

BTs Plans for its NGN EU Open Workshop on NGN Policy and Regulatory Issues 22 June 2005 Ittai Hershman Director, 21CN Commercial Development BT Wholesale.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Current thinking. Subject to change. October 2011 BENEFITS OF BUILDING AN IN-HOUSE CONTENT DISTRIBUTION NETWORK (CDN)
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Ofcom Consumer Switching
Ofcom Consumer Switching
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Consult21 Steering Board Working Group Status RAGRAG Jan 08 / Feb 08 - Interim Architecture & Framework  Network Structure  Systems & Processes Products.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
Btwholesale.com 21CN product order portal 14 th April 2008 Welcome Sheena Thompson and Neal Mundy 21C ECO Plus team Graham Crane Consult21 & 21C Customer.
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
Thank you.
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
Consult21 Systems Work Package BT Architecture and eBusiness Derrick Evans 21CN Systems.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
©OTA O TA Office of the Telecommunications Adjudicator 1 11/10/20041 High Level Review and Status of Activities under the Telecommunications Adjudicator.
1 New actions from Oct 2012 ActionOwnerActionStatusDetail AP1 10/12 Simon Brisbourne Investigate requirement to have bills in PDF format New AP2 10/12.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Consult21 Systems & Process Experts Group Business Processes 6th March 2006.
BT’s Undertakings to Ofcom: An overview
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Quarterly update webcall on BT’s 21CN programme 28 th April 2009 Welcome to the BT's 21CN programme is subject to consultation and further development.
PPC Industry Forum, 4 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
BT Wholesale HARD TURN BACK When shouldn’t I call or request an escalation? There are several occasions when BT Wholesale receive requests on the phone/via.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
Business unit (for internal use only) / url (for external use) Implementation & Migration Programme Plans This presentation covers: Consultation Plan –
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
UK Link Programme Update to PNUNC June 17 th 2013.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Obligatory Products: Consultation Closures Anthony Sheppard Portfolio Strategy.
Consult21 Consult21 – Systems & Processes Expert meeting - Business Welcome.
21C Customer Experience (CE) Programme Progress update and next steps - web call 14th March :00 to 13:00 Caroline Watson Head of 21C Customer Experience.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Pathfinder update webcall 15 th May 2009 Welcome to the BT's 21CN programme is subject to consultation and further development. Dates and other details.
Consult21 Line Access Working Group Voice Line Access Sub-Group 27 Jan 2006 Martin Whewell Openreach MSAN Voice Access Product Requirements.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
Billing programme web call 11 th September 2008 Welcome Keith Wilkins Billing Development Graham Crane Consult21 & 21C Customer Experience.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Raising a Fault Version 1
Presentation transcript:

Carrier Pre-Select Meeting BT Systems Interface Roadmap Graham Crane 18th September 2007

Cautionary Statement BT's 21st Century Network is still in the process of development and the subject of consultation. The information in this presentation may be subject to change' The purpose of this session is to cover: Background to the Workshop Scope & Objectives of the Day Agenda Mention the voting & texting

21CN Systems Architecture Roadmap & Example Interface Contents/Agenda 21CN Systems Architecture Roadmap & Example Interface Detailed documents / Further Information Enabling the eMarket - Detail 1. Future Industry model needs standards for processes, data & technology Moving to automated multi-service multi-supplier industry Need to move from multiple incompatible gateways, data and processes to fewer standard product agnostic data, gateways and processes 2. Consult(21) on future gateways Agree principles & capture requirements for future gateways Roadmap to consult on changes 3. NICC to agree standards Agree standards, best practice & governance Builds on existing work like EMP & consutl21 Takes account of any existing UK or international standards Update with feedback from real projects and capability development 4. Engagement with real projects & stakeholders Not just shelf-ware use on real projects, eg WBBC, BTW & Openreach gateways Engagement across BT and CPs, eg 21CN, 21CCE, Industry Forums, LoBs, 1IT, product teams, etc 5. Utilises & enables capabilities, reuse and agile working Standards & real projects used to create capabilities from reusable system and process components Capabilities exposed via Service Development Tool Kits (SDK) being developed in web21C programme Agile working techniques, hothouses, etc used and included in best practice 6. Industry forums can concentrate on commercials & requirements Delivery through common capabilities enabled by NICC standards 7. Continuous improvement By reviewing and aligning standards, real projects and capabilities

BT’s Platform Architecture – The Matrix Systems Investment and development for 21CN is aligned to a common architecture – we call it the “matrix architecture” The architecture defines the systems into 14 platform areas covering discrete functions It separates customer, service & network into layers across defined application interfaces It supports both new and old networks & services It is designed to protect our customers from underlying technology changes & allow them to embrace 21CN facilities as they choose 21CN (& implementing the “Undertakings”) are accelerating BTs transformation of systems throughout the architecture, but today we will concentrate on changes that impact you the customers, ie The collaboration platform

Figure 1: Roadmap Outline – Driving Change Programme Key: Firm Plans Figure 1: Roadmap Outline – Driving Change Programme Concept BT Wholesale Openreach 2006/07 2007/08 2008/09 2009/10 2010/11 Undertakings/EOI Physical Separation of BT Systems 21C CE (Customer Experience) 21CN Remake Our Portfolio Gateway Impacts BT Wholesale: North Side Migration Apr 07 Onwards wBC Apr 08 Other products tba Openreach: EMP 200 June 06 WLR3 Dec 06 ISDN 2 Sept 07 ONES Sept 07 ISDN 30 Dec 07 VLA Q3/4 08 Strategic Gateways Built 21CN Product Migration1 Current Gateway Closures2 Note 1: This migration follows undertaking/EOI ones Note 2: Not yet planned and will be subject to industry negotiation

Raise/modify/cease Order Example of new Systems Interfaces – based on Wholesale Broadband Connect (WBC) CP Systems Customer Services XML BTWholesale Portal B2B Gateway Service Availability Raise/modify/cease Order Diagnostics Raise Fault CRM (OneSiebel)

Strategic Changes – WBC Example Our vision and how it will impact CPs More interactive B2B interface – no longer need to poll for responses, responses to pushed back by BTW Improving Scalability and Resiliency of the B2B Gateway – deploying a B2B gateway with greater scalability and resilience Greater consistency of interfaces – Provision and fault B2B interfaces currently use different technology. Provision interface to use same technology as current Fault interface for WBC Consistent experience across BT Products – similar B2B interface as is used for Openreach products SMPF/MPF Updating your interface with us - to use more up to date technology – e.g. using later versions of Siebel, browser-based client -no client deployment needed. Consistent across UK Industry – Aligned with Consult21 & NICC B2B

Customer systems interface (B2B) roadmap document Roadmap Structure: Introduction Roadmap Outline – 1-5 years Collaboration Platform / B2B Target Architecture Dialogue Services Governance EoI/Undertakings & 21CN inter-working & dates Requirements, Issues & Next Steps Pathfinder & 21CN Migration Further information Annexes Planned changes & consultations Pathfinder Interface Impacts - Product by Product 21CN Products Interface by Interface plans

Open roadmap & go through Annexes 1 & 2 Roadmap – More Detail Annex 1: Outline Roadmap Undertakings Separation 21C Customer Experience 21C Products Pathfinder If required Open roadmap & go through Annexes 1 & 2 See Roadmap on Consult21 Systems & Process WG pages for more detail Please Note: The roadmap is a summary of current known plans and a guide at the time of publication. Formal notifications of change will come out through the normal product channels or via the Consult21/21CN migration plan consultations as appropriate;

Links to Detailed information BTW Gateways BT Wholesale B2B Gateway BT Wholesale B2B Gateway News BT Wholesale Gateway Migration Eco Broadband Eco Order Eco Repair See also NICC B2B Forum - Published Documents Openreach Gateways Including EMP Openreach Wholesale Line Rental 2 (WLR2) LL Product & LLU Technical Other Openreach Products Source: NICC B2B @ http://193.113.58.84/twiki/bin/view/Work/FurtherInformation

Further Information Consult21 Systems & Processes working group @ http://www.btwholesale.com/consult21 Consultations, issues, requirements to date Systems Interface Roadmap Document NICC B2B @ http://niccb2b.org.uk/ Work plan & progress Standards & ways of working established to date Next steps – T2R, L2C, etc Useful Links Email: graham.crane@bt.com

Close Thank you