Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
EPPOG - LHC Machine LHC machine (and some outreach) Mike Lamont.
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
The integration of 420 m detectors into the LHC
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
A liner in the Corrector package A Cu liner has been inserted in the gap between the CBT and the coil aperture of all the corrector package elements (see.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
ELENA installation progress F. Butin / ELENA collaboration.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Superconducting Links R2E and Avalilability Workshop
Cryogenics storage and distribution
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Powering LHC magnets version 30/3/2007.
Testing of SC Magnets Status - November 2010
The HL-LHC Circuits: Global View and Open Questions
FiDeL: the model to predict the magnetic state of the LHC
on behalf of the RF group
The LHC - Status Is COLD Is almost fully commissioned
Powering the LHC Magnets
Powering from short circuit tests up to nominal
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
TEST PLANS for HL LHC IT STRING
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
DS Collimators TE-MSC-CI
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
LHC installation status
as a prototype for Super c-tau factory
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005

CERN L.Evans & C.WyssINFN CSN1 Napoli September

3 Beam parameters obtained from the central frequency measurements, averaged over the data obtained from the horizontal and vertical planes.

CERN L.Evans & C.WyssINFN CSN1 Napoli September Results of TI8 test

CERN L.Evans & C.WyssINFN CSN1 Napoli September End of civil engineering works in Point 5 (1st February 2005)

CERN L.Evans & C.WyssINFN CSN1 Napoli September Superconducting cable 1

CERN L.Evans & C.WyssINFN CSN1 Napoli September Superconducting cable 2

CERN L.Evans & C.WyssINFN CSN1 Napoli September Dipole cold masses

CERN L.Evans & C.WyssINFN CSN1 Napoli September Number of quenches to reach 8,33 T at the first cooldown (560 dipoles)

CERN L.Evans & C.WyssINFN CSN1 Napoli September LHC Dipoles: integrated field

CERN L.Evans & C.WyssINFN CSN1 Napoli September Dipole field quality: average b3

CERN L.Evans & C.WyssINFN CSN1 Napoli September Arc quadrupole cold masses

CERN L.Evans & C.WyssINFN CSN1 Napoli September MSCB sextupole dipole correctors

CERN L.Evans & C.WyssINFN CSN1 Napoli September Cryodipole overview

CERN L.Evans & C.WyssINFN CSN1 Napoli September SSS overview

CERN L.Evans & C.WyssINFN CSN1 Napoli September Magnet Installation Installation is progressing in sectors 8-1 and 4-5. More than 100 superconducting magnets have been installed. The installation rate must now ramp up to 20 magnets per week (16 dipoles and 4 SSSs) in the next few weeks. At the end of October, sector 7-8 will be liberated for magnetic installation. From then on there will be no shortage of slots.

CERN L.Evans & C.WyssINFN CSN1 Napoli September First cryodipole lowered on 7 March 2005

CERN L.Evans & C.WyssINFN CSN1 Napoli September First SSS lowered on 19 April 2005

CERN L.Evans & C.WyssINFN CSN1 Napoli September Transport in the tunnel with an optical guided vehicle

CERN L.Evans & C.WyssINFN CSN1 Napoli September Transfer on jacks

CERN L.Evans & C.WyssINFN CSN1 Napoli September Preparation of interconnect

CERN L.Evans & C.WyssINFN CSN1 Napoli September Interconnection of beam tubes

CERN L.Evans & C.WyssINFN CSN1 Napoli September Interconnect in sector 8-1: in progress in sub- sectors C and F

CERN L.Evans & C.WyssINFN CSN1 Napoli September Pre-assembly of first low-beta triplet (hall 181)

CERN L.Evans & C.WyssINFN CSN1 Napoli September

CERN L.Evans & C.WyssINFN CSN1 Napoli September UA47: Quench protection & Power converters

CERN L.Evans & C.WyssINFN CSN1 Napoli September

CERN L.Evans & C.WyssINFN CSN1 Napoli September Cryogenics overview

CERN L.Evans & C.WyssINFN CSN1 Napoli September ,8 K in the UX85 cavern

CERN L.Evans & C.WyssINFN CSN1 Napoli September Repair of QRL modules

CERN L.Evans & C.WyssINFN CSN1 Napoli September Repair of special QRL elements at CERN

CERN L.Evans & C.WyssINFN CSN1 Napoli September Cryogenic distribution line

CERN L.Evans & C.WyssINFN CSN1 Napoli September QRL

CERN L.Evans & C.WyssINFN CSN1 Napoli September Reinstallation of QRL in 7-8 Sub-sectors A and B (600 m) have been cooled down on Wednesday 14 th September. After the cold tests, the inner triplet will be installed, cooled down and powered whilst the rest of the line is being installed.

First cooldown of 600 m cryogenic LHC line sector September 2005 He in He out Th.screen line LHe line Pump. line 20 K line

CERN L.Evans & C.WyssINFN CSN1 Napoli September Conclusions Main objectives: –terminate installation in February 2007 –first collisions in summer 2007 The industrial production of standard components is compatible with this objective. The ramping up of QRL activities and magnet installation is critical to maintain this schedule. Additional actions have been implemented to ensure proper QRL production and installation rates. The installation and interconnection of cryomagnets have started in the tunnel. The commissioning of technical systems will take place in two adjacent sectors in parallel. Main next actions: –partial test of sector 7-8 in autumn 2005 –commissioning test of the two first sectors (7-8 and 8-1) in summer 2006 –find external collaborators to help with commissioning. => many thanks to INFN for its support !