SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.

Slides:



Advertisements
Similar presentations
Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
Advertisements

ITS-week CERN December 3, 2001 Michel Morel CERN EP/ED.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
JM GAUTIER WG8 FAZIA-DAYS October 2007 Page 1 L P C Laboratoire de Physique Corpusculaire CAEN Points to discuss DESIGN.
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
FEV Boards status N. Seguin-Moreau on behalf of
GigaTracker Working Group meeting Status of the GTK_carrier /03/2015.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN State of the art technologies for front-end hybrids.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 10 th October 2007Luciano Musa Considerations on readout plane IC Area (die size) 1-2 mm 2 /channel Shaping amplifier 0.2 mm 2 ADC0.6 mm 2 (estimate)
Low Mass Rui de Oliveira (CERN) July
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
Status of GTK_CARRIERS_2015 NA62 GTK WG meeting Michel MOREL October,
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
Assembly, construction and testing of the ALICE Silicon Pixel Detector V. Manzari / INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
RIKEN/CERN pixel electronics/bus R&D plans Johann M. Heuser RIKEN - Radiation Laboratory PHENIX Silicon Upgrades Meeting 10 April 2003.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
Status of the TPC readout electronics
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Minutes of the GTK carrier Design Review meeting
Some proposals on HV circuits realization for segmented straw detector
Roberto Dinapoli CERN-CEM II,Montpellier For the ALICE Collaboration
prototype PCB for on detector chip integration
SPD cable length and rack location
Ecal Front End Electronics
SALTRO16 activities in Lund
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002

8/10/2002Michel Morel EP/ED2 1.PIXEL BUS AND PILOT MCM CONNECTIONS 2.PIXEL BUS, PILOT MCM and EXTENDERS CONNECTIONS 3.PIXEL BUS PROTOTYPE PRODUCTION 4.BONDING WIRE TESTS 5.STATUS OF PCB 6.CONCLUSION

8/10/2002Michel Morel EP/ED3 PIXEL BUS AND PILOT MCM CONNECTIONS

8/10/2002Michel Morel EP/ED4 400µ 240µ 500µ DETECTOR PIXEL CHIP SMD COMPONENTS 0402 MCM SMD COMPONENTS 0402 Digital pilot LASER DIODE PIXEL CARRIER EXTENDER 1 EXTENDER 2 GLOB TOP COOLING TUBE 100µ 1.2mm 350µ LASER DIODE 500 PIXEL BUS AND PILOT MCM CONNECTIONS

8/10/2002Michel Morel EP/ED5

8/10/2002Michel Morel EP/ED6 PIXEL BUS AND PILOT MCM CONNECTIONS Top view

8/10/2002Michel Morel EP/ED7 PIXEL BUS, PILOT MCM and EXTENDERS CONNECTIONS Sense + Sense - MCM 2.5V Sense + Sense - Pixel chips 1.8V Laser diode

8/10/2002Michel Morel EP/ED8 VDD Copper Kapton1(top) PIXEL__EXTENDERS if VDD=VDDA=VTT=VTTA=1.8V Cross section Cover-lay 50µm 100µm ~50µm Top view Kapton2 (bottom) GND Pixel_carrier Sense+ VDD 12mm Sense- GND I=7A DDP=102mV P(half stave) = 715mW P(half detector) = 42.9W GND VDD=1.8V

8/10/2002Michel Morel EP/ED9 EXTENDERS WITH CABLES 1m Cable AWG 10: diameter 2.79mm area 4.6mm² weight g/m Rmax 0.4  /100m Ddp at 7A = 56mV P(half stave) = 392mW P(half detector) = 24W

8/10/2002Michel Morel EP/ED10 Pixel_bus prototype production Epoxy Al Cu (base) LASER DIODE 500

8/10/2002Michel Morel EP/ED11 Epoxy Al Cu (base) 300µm Pixel_bus prototype production

8/10/2002Michel Morel EP/ED12 Epoxy (5  ) Al Cu (base) ! Pixel_bus prototype production

8/10/2002Michel Morel EP/ED13 Epoxy Al Cu (base) Kapton Pixel_bus prototype production

8/10/2002Michel Morel EP/ED14 Epoxy Al Cu (base) 300µm Kapton 300µm Pixel_bus prototype production

8/10/2002Michel Morel EP/ED15 Epoxy Al Cu (base) 300µm Kapton ! Cu x Cu y Pixel_bus prototype production

8/10/2002Michel Morel EP/ED16 PIXEL BUS CROSS SECTION Glue 5µ Kapton 8µ Liquid Polyimide 8µm 280µm Cu 5µ +Ni/Au (1µm) Cu 10µ + Ni/Au (1µm) 1) AGND 50µm 2) VDDA 30µm 3) Horizontal lines 4) vertical lines 5) VDD 15µm 6) GND 50µm 7) Resistors + capacitors pads+ Fastor Aluminium

8/10/2002Michel Morel EP/ED17 Cu (base) BONDING WIRE TESTS

8/10/2002Michel Morel EP/ED18 Cu (base) 9~10g BONDING WIRE TESTS

8/10/2002Michel Morel EP/ED19 Cu (base) Al BONDING WIRE TESTS Al (99%) + Si (1%) 1g!

8/10/2002Michel Morel EP/ED20 Status of PCB Pixel_carrier_B. Pixel carrier interface. Pilot MCM. Pilot MCM daughter card.

8/10/2002Michel Morel EP/ED21 Pilot MCM daughter card

8/10/2002Michel Morel EP/ED22 CONCLUSION Power supplies modifications should be finalized ASAP. PIXEL BUS in production: 10 normal, 10 mirror. First mirror bus mounted on PIXEL interface end of October PILOT MCM will be assembled this month (October 2002) and mounted on the daughter card interface.