Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.

Slides:



Advertisements
Similar presentations
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Advertisements

Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.
Team Name Conceptual Design Review Team Members Date Fall 2011 Rev A
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
Full Mission Simulation Test Report UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus May 14, 2010.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
CS 545 Software Systems Design Project Presentation Format Lecture Created by Dan Benson Computer Science Lectures © D. Benson, 2002.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
All Your Names (everyone should be committed by now)
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Launch Readiness Review Team Name University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Rev
RockSat-C 2011 ISTR Individual Subsystem Testing Report Team Name School Date 1 Team Members
P07302 Summary Motor Controller Module. Team Members.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
Critical Design Review Team Name University/Institution Team Members Date.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Critical Design Review Team Name University/Institution Team Members Date.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
ECE477 Midterm Design Review: Team #
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,
CSE Senior Design I Architecture Design Review/Final Exam Template CSE 4316 Final Exam.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Simplifying Customer Software Integration Tim Myers April 9 th, 2011 Colorado Undergraduate Space Research Symposium Payload Configuration GUI.
Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Insert Product Photograph Here
0.0 Instrument Suite Name Presenter’s name
ECE 477 Final Review: Team #
Individual Subsystem Testing Report
School/Team member names Date
Launch Readiness Review
E190Q – Final Project Presenation
Team Name Conceptual Design Review
Team Name Conceptual Design Review
FRIDAY SLIDES TEMPLATE
SUNDAY SLIDES TEMPLATE
Launch Readiness Report West Virginia University
Project Journal Title Slide
<Your Team # > Your Team Name Here
Project Management Unit #2
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date

User notes: –This template shall be followed as closely as possible. –Deviations from this template will make it hard to assess your flight readiness. Without an understanding of your level of flight readiness, your chances of being awarded a primary position will be decreased.

Mission Overview –Briefly remind everyone what your mission is.

Functional Block Diagrams -A Functional block diagram of the entire system should be presented here. -By now, your payload should have excellent block diagrams after CDR completion. -Yes… again… I know.

Subsystem Overview -What subsystems do you have?: -Power (EPS) -Software -Command and Data Handling (C&DH) -Structures -Electrical -Science -…

Interfaces -Did everything fit together as planned? -What issues (if any) did you run into? -How will issues be resolved?

Pictures -Show lots of pictures of your subsystems fully integrated together -You can never have too many pictures!

Test Description -Describe the tests that were conducted… -Were all sensors/science experiments poled? -How long were the tests run? -Why were these tests run? -What requirements were verified?

Test Results -Did everything work as planned? -Did all electronics communicate? -Did the software work with all subsystems? -Did the sensors return reasonable data? -Will the sensors need calibration? -Most importantly, just summarize your findings -What needs to change before flight? -Action items…

Conclusions –Issues and concerns –Closing remarks

Canister Integration Plan –One slide for all payloads outlining the plan to ensure that integration of the N payloads will go smoothly.

Appendix –Additional data not immediately relevant to the presentation