GLAST LAT ProjectF-to-F, June 15, 2005 4.1.4 TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S 4.1.4 Face-To-Face June Meeting Robert Johnson.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
November 17, 2004Tracker1 Tracker November System Manager Meeting R.P. Johnson U.C. Santa Cruz.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson U.C. Santa Cruz Gamma-ray Large Area Space Telescope

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 2 Tower Status Towers A, B, 1, 2, 3, 4, 5: –Handed off to I&T Tower 6: –Assembled and electrically tested with C5, C6, and C7 cables missing. –Sidewalls installed and full alignment CMM measurements done. –Stored in its inner shipping container in the Pisa cleanroom. Tower 7: –Assembly is in progress in Pisa. –Only 2 cables (C0 and C1) are available in Pisa for this assembly. Tower 8: –All but 3 (heavy) mechanical panels were delivered by Plyform as of Monday of this week. The remainder should be delivered this week. –G&A is assembling Tower-8 trays. Tower 9: –At least most of the Tower-9 mechanical panels should be delivered by the end of this week.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 3 Tray Panel Fabrication Plyform received a payment on their first invoice under the ASI/G&A subcontract, which helped defuse many concerns. Plyform has been doing an excellent job at delivering trays. There have been some potential material problems: –Defective bias circuits (see the following slide). Replacements are on order. –Carbon-carbon materials: the last orders were received and shipped to Italy. –Tungsten tiles could hold up the show. The new orders were received in Italy and shipped to GSFC. Substantial customs delays resulted. Pisa has said that delays could result if the tiles are not receive in Italy by about June 20 (next week). The work is now in progress at GSFC, but I don’t yet have a status update on when the first batches will be ready.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 4 Bias Circuit Issue The root cause of the bad circuits was never determined. –The bad circuits have a different color in the region where there is no copper plane. See below. However, a visual screening procedure was discovered, and we found that a total of 75 circuits have to be replaced. FAILEDPASSED This region delaminates easily in the bad circuits.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 5 MCM Production Production halted for one week to rework the tooling for flex trimming. Production is underway again this week. 15 MIP-2 tests Mon./Tues. Only about 2 more weeks of production are needed for flight towers.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 6 MCM Production Issues We believe that we have resolved the financial issues remaining in the contract with a good compromise between SLAC and Teledyne (many thanks to Ladan Saghafi in SLAC purchasing!). Omnetics connector deliveries are critical for keeping the Teledyne production rolling. –The next delivery date given by Omnetics, July 1 for 400 units, is most likely too late to avoid a work stoppage at Teledyne. –Jeff Tice is pushing Omnetics to deliver some connectors earlier than that, but they have been strongly resisting so far. –We have started removing connectors from failed flight MCMs in order to build up a stock of usable connectors, just in case. They are now in the hands of QA for cleaning and inspection. The first production trial of conformal coating (4 MCMs) had problems that have not yet been resolved. Production is continuing with the in-house Teledyne process. Moving to the new process becomes less and less attractive as we near the finish line.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 7 Flex-Circuit Cables The last Tower-6 cable is supposed to ship from Parlex June 24 I’m hoping to get some firm information on Tower-7 cables from Parlex today. In principle they are only slightly behind Tower 6. Cables are dribbling in from Parlex, with 4 shipped last week and hopefully at least 3 this week. Parlex was funded to make 2 improvements: –Work weekends –Retool the longest cables to go 4 per panel (not diagonal) on a new panel size that Parlex is now processing (this will not pay off immediately) We are investigating relaxing the annular ring requirements to IPC Class-3 specs to improve the yield. Pioneer flex-circuit manufacturing is in progress, with all circuits due to be fabricated by July 1. Pioneer is also actively working on assembly issues, including making test assemblies.

GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 8 Tracker Tower RFI Schedule Tower 6July 11 Tower 7July 13 Tower 8July 29 Tower 9August 2 Tower 10August 16 Tower 11August 18 Tower 12August 25 Tower 13September 7 Tower 14September 9 These are my guesses, based on my MS Project schedule. Towers 6 and 7 are already in trouble due to lack of cables. INFN believes that up through Tower 14 can still be assembled and tested in Italy by end of August if cable sets start arriving regularly no later than mid July (assuming that at least Towers 6 and 7 are equipped and tested earlier). There are potential problems with competing for access to the Alenia vibration facilities.