Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold,
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
How to apply this technology into product innovation ???
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
11 Heating System Operation and Diagnosis.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Heating/Cooling Curve Melting (ice & water) ALL ice ALL Water Vaporizing (water & vapor) ALL Vapor.
How does the ocean affect weather?. Ocean water is heated at the equator. Why does it heat up more at the equator than other parts of the world?
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Roadmap PowerPoint Notes and Textbook Assignment Friday: refrigeration and cooling systems Next week we will review before having a test on Chapter 5.
ENERGY CALCULATION PRACTICE UNIT 3. HOW MUCH ENERGY IS REQUIRED TO HEAT 200 GRAMS OF WATER FROM 25˚C TO 125˚C? HOW MUCH ENERGY IS RELEASED WHEN COOLING.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Chapter-11 Heat Engines and the Laws of Thermodynamics 1 Heat Engines and First law of thermodynamics 2Second Law of Thermodynamics 3 Refrigerators and.
Mars Airplane Thermoelectric Carbon Dioxide Propellant Generator Paul Rosensteel Michael McVey Advisor: Dr. Robert Ash.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Basic Processes TemperatureFreezingMelting Boiling Evaporation Condensation.
Heat Molecules and Motion The motion of molecules produces heat The motion of molecules produces heat The more motion, the more heat is generated The.
Salt in Boiling Water By John-Paul Evans. Purpose What does ice do to hot boiling salt water and why does it do it?
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Water is made up of molecules. Water changes state (gas, liquid, solid) when it’s molecules are heated or cooled.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
A ROOM AND 2 COKE CANS (A SCIENCE EXPERIMENT) Kelsie Neumann.
Lecture Objectives: Cooling towers and modeling Project 1 Thermal storage systems.
When you are making ice cream, the temperature around the ice cream mixture needs to be lower than 32 F if you want the mixture to freeze. Salt mixed with.
Science Vocabulary Review SNAP! Game
Thermal measurements of TPG and Diamond I. Bonad, R. Bates and F. McEwan.
Testing the Enclosure Original Plan: Intrinsic safety and wireless communication New Plan: Sensor circuitry and relay together, and totally enclosed EE.
Short update from Glasgow R. Bates, A. Blue, T. McMullen.
Date of download: 7/6/2016 Copyright © ASME. All rights reserved. From: Performance Analysis of a Combination System of Concentrating Photovoltaic/Thermal.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Phase 2 Outer Tracker Module analysis
Lecture Objectives: Continue with cooling towers
Heating of ALFA detectors
On behalf of the US TOB testing group
US Module Testing Progress Report
Equipment Status ARCS equipment status DAQ equipment status
Then cut lines (top sheet only!)
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Flow Control Panel 95% Complete Completed 1st Pitch Adaptor Antenna à L=0.13” coupling distance Assembly of Cold Box 95% Complete

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Completed assembly of Relay Control Board à Schematic generated à Simple Peltier over heat interlock discovered Thermo-Electric Element Test (see vi gui) à ACDC VI Control à 15 deg C goal à 4min natural oscillation observed

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Chassis

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Pitch Adapter Antenna à

Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Antenna Detail 0.13” coupling distance from antenna to near pitch adapter traces

Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Chiller Antifreeze required to prevent freezing of Peltier Water cooling lines during power failure. à If unit is powered down with cold box at -20 deg C the cooling water will turn to ice unless 50% solution of antifreeze is used. This will freeze at -34 deg C.

Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 1st Cold Box System Test

Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Add Temperature Sensor for Peltier Control Verify Flow sensor calibration Check à FR1001 Air 40 mL/min*volt +-3% 0-5v (on order) à FR1005 Air 0.40 L/min*volt +-3% à FR1011 Water 0.40 L/min*volt +-3%

Slide 11UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Calibrate UCSB Hybrid Cold Box à CERN Box is (18+20)/25min on cooling à CERN Box is (20+18)/3min on heating Study scale factors used in CERN vi Start writeup of Hybrid Test Procedures