1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
1 GLAST-LAT Calibration Unit Shipment to SLAC Plan Review Luca Latronico Alessandro Brez Michele Pinchera
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 3 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
SBN Far Detector Installation & Integration
Environmental Test Planning
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
Integration, Test, and Verification
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With LAT inside (Lift Points and Cover to Base Fasteners)?? –Yes? Needs to be Proofloaded Accordingly –No? Can the Design be Changed? Operation #1: Preferred Off-Load: Flatbed Truck Backs into Receiving Area Off-Load Truck Using 10 Ton Facility Crane Red Arrows Show Path to I&T Highbay for Op #2 LAT Activities at Spectrum Astro Environmental Test Area 7200 sq.ft Horn Rm. Lav S/V GSE Area 1220 sq. ft. Electrical Room TBD Fire 29' x 40' Acoustic Test Cell Change Room 170'-0" Shipping Receiving 54' W X 54' L X 25' H (10 ) Ton Crane Area

2 GLAST LAT Activities at Spectrum Astro Operation #2: Transfer LAT to I&T High Bay –Question: Can SLAC Perform LAT Functional Testing and Inspections While Installed in the Transport Container Base? –Connector Access, Cooling/Purge Access, etc.? –Is it Smart to Transfer the LAT to the Rotation Stand? –Pro – Rotation Stand has Casters for Moving Into I&T High Bay –Con – Additional Handling –Can Caster Jacks be Added to Transport Container Base Design? »Allows Movement of Container Base Without Having to Place Container on Some Kind of Roller –Ops #2 and #3 May be Swapped Pending Answers/Discussion Operation #3: Remove Transport Container Cover –Use SLAC LAT Lift Fixture –Need Proofload Tags on sling as Well as Certifications –Container Cover Proofload –Assuming LAT is Bagged Inside Container

3 GLAST LAT Activities at Spectrum Astro GLAST I&T Highbay

4 GLAST LAT Activities at Spectrum Astro LAT EGSE Setup and Checkout How Much Space do You Need? What Kind of Electrical Outlets do You Need (i.e. Anything Special)? How Much Time do You Need? Current Calibrations, and Do You Need to Re-Calibrate During Obs. I&T? What Kind Of Support Do You Need From Spectrum? LAT Post Ship Inspections What, How Long, Spectrum Support? LAT Post Ship Functional Testing What, How Long, Spectrum Support?

5 GLAST LAT Activities at Spectrum Astro LAT Integration with Spacecraft Use SLAC Provided LAT Lift Fixture and Grid Perimeter Ring Hoist Out of Container Base (or Rotation Stand), Move over to Spacecraft, Lower onto Flexures, Install Bolts Disconnect/Remove Grid Perimeter Ring From LAT Radiator Installation What Are They Shipped In? Pre-Installation Checkout/Inspection? Use SLAC Provided Lift Sling Installation Sequence –How are They Attached? Alignment What are we Measuring? Should we be Doing This Before Radiator Installation?

6 GLAST LAT Activities at Spectrum Astro LAT/Spacecraft Functional Testing Interface verification (safe-to-mate) Prior to Electrical Connection Spacecraft to LAT Functional Testing –LAT Database Merged With Spacecraft Database Long Before This (PSR – 6 months) LAT Stand-Alone Testing??? (LAT CPT??) Observatory Testing LAT CPT Combined with Spacecraft CPT to Form Observatory CPT LAT Data fed to LAT EGSE Thru Spacecraft I&T Rack LAT EGSE Connected to LAT for Troubleshooting LAT Cooling?? Environmental Testing Acoustics and Sine Vibe Instrumentation –Same as LAT Standalone Tests? TVAC –Instrumentation and Ramp Rate

7 GLAST LAT Activities at Spectrum Astro Contingencies LAT Removal Procedure Released and Ready if Needed (Operation Thought Out in Advance so if we Need to do it, we are Ready). –Includes Radiator Removal Procedure for LAT Dry Air Purge What Else?