GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR - Dept. of IFCT 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
Where to put Towers A and B in the Grid – technical issues 18-Jan-2005 L. Wai (SLAC/Group K) for LAT I&T.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
GLAST Large Area Telescope:
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration and Test (IFCT) Nov 18, 2004 Electrical Test Brian Horwitz IFCT Electrical Engineer SLAC Gamma-ray Large Area Space Telescope

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 2 EGSE TEST REQUIREMENTS: MD Configuration of EGSE shall be controlled via released documentation EGSE shall be acceptance tested EGSE shall be validated before use if it has been moved, reconfigured, or repaired –Validation shows that equipment is both ready for use and safe to use High degree of confidence that equipment in that configuration has full operating capabilities –NASA guidance Perform an EICIT and an SVT to ensure electrical safety Trip points on circuit breakers, current limits in power supplies, shall be verified While everything is validated, the scope of validation is tailored for each piece equipment type

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 3 EGSE REQUIREMENTS / RESPONSIBILITIES

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 4 STATUS OF EGSE– COTS Digital Multimeters (I&T responsible for these) –Calibrated Instrument –Validation Tests Embedded within test procedure that calls them –STATUS: Meter purchased exceed maximum voltage for parts in some equipment, so we are re-procuring Borrowing “Safe” DMM’s in the meantime Hand Tools –Procured, cleaned, and placed in toolbox within cleanroom ATE for Safe to Mate –All parts received - calibrated –Interconnection harness designed –in assembly –Rack tray’s sent out for machining – affected by safety stand down at SLAC

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 5 SCOPE OF EGSE TESTS – BOB’s ETC. Cables and break out boxes (I&T is responsible for these) –Design documentation complete and released –Acceptance Tests include Configuration inspection to assembly drawing Interface integrity and cleanliness, inspection Electrical continuity & isolation tests per LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical continuity tests, manual –Enter into validation log kept in cleanroom Connector Savers –Tests: Interface integrity and cleanliness, inspection

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 6 STATUS OF BOB’s ETC All BOB’s designed, built, and tested –Inspection remains to be completed Associated cables designed, built to shortage, and tested –The backshells for the 100 pin cables were back ordered and just arrived. Estimate assembly complete 12/1 –Inspection remains to be completed Long versions of the Two Tower test cables for EGSE interconnections are awaiting the floor layout to determine lengths. Design, build, and test complete 12/31. Acceptance and Validation Test Procedures in sign off cycle

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 7 STATUS OF CONNECTOR SAVERS Determining connector saver needs –Coordinating with subsystems All ELX boxes arrive with connector savers on each connector CAL delivers mated to an EM TEM, so they are not needed TKR towers arrive with connector savers that will be turned over to I&T –Determining who buys connector savers for the flight cables – submitted lien to program office to fund procurement –Complete determination by 11/24

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 8 SCOPE OF EGSE TESTS - PDU EM PDU –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests –Fill out paperwork and enter into validation log kept in cleanroom Further validation tests performed within the test stand using load box

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 9 SCOPE OF EGSE TESTS – PDU LOAD EM PDU LOAD BOX –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests –Fill out paperwork and enter into validation log kept in cleanroom Further validation tests performed within the test stand

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 10 STATUS OF PDU & LOAD BOX Documentation –PDU Assy, LAT-DS-01696, released –PDU Test Procedure, LAT-TD , released –PDU Load Box Assy, LAT-DS-03400, released –PDU Load Test Procedure, LAT-TD , released –EICIT Procedure, PDU, LAT-TD-04332, released –SVT Procedure, PDU, LAT-TD-04332, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 11 SCOPE OF EGSE TESTS - GASU EM GASU –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests –Fill out paperwork and enter into validation log kept in cleanroom Further validation tests performed within the test stand

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 12 STATUS OF GASU Documentation –GASU Assy, LAT-DS , released –GASU/Test Stand Test Procedure, LAT-TD , released –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 13 SCOPE OF EGSE TESTS – TEM/TPS EM TEM/TPS –Acceptance Tests include Configuration inspection to LAT-DS Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests –Fill out paperwork and enter into validation log kept in cleanroom Further validation tests performed within the test stand

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 14 STATUS OF TEM/TPS Documentation –TEM/TPS Assy, LAT-DS-01643, released –TEM/TPS Test Procedure, LAT-TD , released –EICIT Procedure, TEM, LAT-TD , released –SVT Procedure, TEM, LAT-TD , released –EICIT Procedure, TPS, LAT-TD , released –SVT Procedure, TPS, LAT-TD , released Two delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 15 SCOPE OF EGSE TESTS – BUS PROTECTOR –Acceptance Tests include Configuration inspection to LAT-DS- Interface integrity and cleanliness, inspection EICIT and SVT tests Functional Tests in accordance with LAT-TD- Labeling with test due date, operator, QA –Validation Tests include Verify Acceptance Testing has been performed and is not due for re-test Configuration inspection Interface integrity and cleanliness, inspection Electrical STM tests –Fill out paperwork and enter into validation log kept in cleanroom Validation tests performed in accordance with LAT-TD-

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 16 STATUS OF BUS PROTECTOR Requirements identified in EGSE Plan Design assigned within ELX Documentation needs be created Awaiting schedule

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 17 TEM TEST STAND - CAL AND TKR TESTS Acceptance Tests include –Configuration inspection LAT-DS CAL LAT-DS TKR –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD –Labeling with test due date, operator, QA Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests Fill out paperwork and enter into validation log kept in cleanroom –Perform tests described in LAT-TD , Para , Basic Test

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 18 STATUS OF TEM TEST STAND Documentation –CAL Test Stand set up procedure, LAT-DS-02861, released –TKR Test Stand set up procedure, LAT-DS-03605, released –TEM/TPS Test Procedure, LAT-TD , released –EICIT Procedure, TEM, LAT-TD , released –SVT Procedure, TEM, LAT-TD , released –EICIT Procedure, TPS, LAT-TD , released –SVT Procedure, TPS, LAT-TD , released Two delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 19 GASU TEST STAND – TESTS IN 1X1 Acceptance Tests include –Configuration inspection LAT-TD –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD –Labeling with test due date, operator, QA Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests Fill out paperwork and enter into validation log kept in cleanroom –Perform tests described in LAT-TD , Para , Basic Test

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 20 STATUS OF GASU TEST STAND Documentation –Assembly and test procedure, LAT-TD , released –Validation test, run LAT-TD , released –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 21 GASU/PDU TEST STAND – TWO TOWER Acceptance Tests include –Configuration inspection LAT-TD –Interface integrity and cleanliness, inspection –EICIT and SVT tests –Functional Tests in accordance with LAT-TD –Labeling with test due date, operator, QA Validation Tests include –Verify Acceptance Testing has been performed and is not due for re-test –Configuration inspection –Interface integrity and cleanliness, inspection –Electrical STM tests Fill out paperwork and enter into validation log kept in cleanroom –Perform tests described in LAT-TD , Para , PDU-GASU Interface and electrical load tests LAT-TD , Para , Basic Test

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 22 STATUS OF GASU/PDU TEST STAND Documentation –Assembly and test procedure, LAT-TD , released –PDU Validation LAT-TD-02544, released –Validation test, run LAT-TD , released –EICIT Procedure, PDU, LAT-TD-04332, released –SVT Procedure, PDU, LAT-TD-04332, in work (12/1) –EICIT Procedure, GASU, LAT-TD-04260, released –SVT Procedure, GASU, LAT-TD-04382, in work (12/1) Delivered to I&T Inspection, acceptance test, validation pending development of flight documentation

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 23 TEST PROCEDURE STATUS Test procedures are being written prior to completion of test plan - risk CAL Test Procedure –Draft complete and in review –Draft must be updated with new input from CAL subsystem (received after procedure completed) –Complete one week after CAL final update TKR Test Procedure –Draft was complete and in review three weeks ago –Draft was updated with new input from TKR subsystem (received after procedure completed) –Complete one week after TKR final update

GLAST LAT Project November 18, 2004 I&T Two Tower IRR 24 TEST PROCEDURE STATUS (cont) Single Tower Test –Draft in review in I&T –Affected by change to subordinate documents References to be updated and test descriptions re- written –Complete 12/15 Two Tower Test –Draft begun –Complete 12/31 VG and CR Data Runs for LAT Integration