Dan Rossiter BIM Team, BRE Wales 26th of September, 2014

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Conference xxx - August 2003 Fabrizio Gagliardi EDG Project Leader and EGEE designated Project Director Position paper Delivery of industrial-strength.
Hussey Fraser Solicitors
Government Construction Strategy (for England)
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Corporate Records Management (Practitioner) Information Governance Policy Team NHS Connecting for Health.
MR1 Consulting ltd Collaborating for Business Performance
Corporate Records Management (Practitioner) Information Governance Policy Team NHS Connecting for Health.
Health Records Management Practitioner
Nov 13 th 2013 Paul Coates Thoughts on BIM Maturity Teams Organisations Individuals Projects.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
David Walker Head of Procurement & Property Services, Aegon UK.
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
BIM Sarah Birchall and Jo Harris 25 th September 2014.
BIM Software for Construction. - Twitter Web &
CLAW/CEW BIM Toolkit for Clients Client Training and
The countdown to 2016: Your action list to be ready
ISO Energy Management System Certification
© 1998 Concept Five Technologies Enterprise Application Integration Capability Maturity Model.
NETLIPSE Network Meeting 17 & 18 May 2010 Vilnius The ICE Client Best Practice Guide.
BIM Execution Planning (BEP)
The BIM Project Execution Planning Procedure
Introduction to BIM BIM Curriculum 01.
What was BIM4Real? The Project.
1 Building (& Asset) Information Modelling (& Management) Mark Bew CIO URS/Scott Wilson.
The Lean Sourcing Process
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
Information Security Governance 25 th June 2007 Gordon Micallef Vice President – ISACA MALTA CHAPTER.
Strategic Forum for Construction Integration Task Group PROFITING FROM INTEGRATION.
CLINICAL GOVERNANCE and MI Services : An introduction National MI Training Course University of Leicester 5 th July 2007 Mark Cheeseman E ast Anglia MI.
Developing Cultural Tourism In Wales Nigel Adams Head of Policy & Regeneration Visit Wales Reväst Conference on Cultural Tourism Goteborg 7 th May 2010.
Commercial Opportunities
The BIM Toolkit Stephen Hamil – March 2015 – v2.0.
Managing asset information using BIM Level 2
Deakin Richard Tan Head, Information Technology Services Division DEAKIN UNIVERSITY 14 th October 2003.
Introduction to Interactive Media The Interactive Media Development Process.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
RIAAN VISSER GFIMFO Manager: Consulting Services SizweNtsalubaGobodo.
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
Document Number: Version: 1v0 © Outperform UK Ltd 1 Assessing the change capability of an organisation Jennifer Stapleton.
Foundation Skills Training Package Anita Roberts Project Co-ordinator.
Building Information Modelling (BIM) Food for thought Project Challenge Expo
Meet the Buyer West Yorkshire Transport Fund. WELCOME Mark Roper & Steve Carmody.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
1 | Nick Nisbet COBie in the UK Federated Building Information Modelling HMG BIM Working Group Technical Coordinator, buildingSMART UKI.
BEST East – Introduction Developing the capability to deliver more with less Neil Jarrett CWC.
CMMI Certification - By Global Certification Consultancy.
Project Management in Marketing Assignment briefing June and September 2013 Frank McKee Senior Examiner Professional Diploma in Marketing.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Raj Chawla Chief Technology Officer and Projects Director at NUNELAH, Executive Member of UK BIM Alliance, Chair BIM4SME.
The NBS BIM Toolkit Dr Stephen Hamil – Director of Design and Innovation.
BIM Terminology Explained BIM Masterclass & Technical Workshop 2015.
Procurement Development Programs
A digital tool for building information modelling
IT Project Management Version IT Industry Apprenticeship System
Mathew Brett Transport for London BIM Manager.
Victoria Australia (BUGVA).
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Building Information Modelling - UK Transition to ISO standards
The Lean Sourcing Process
Building Information Modelling - UK Transition to ISO standards
Building Information Modelling - UK Transition to ISO standards
Michelle Papayannakos
Building Information Modelling - UK Transition to ISO standards
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Building Information Modelling - UK Transition to ISO standards
CIC BIM Competition Presentation Template & Content Guide
Presentation transcript:

Dan Rossiter BIM Team, BRE Wales 26th of September, 2014 BRE: BIM in Wales Dan Rossiter BIM Team, BRE Wales 26th of September, 2014

Agenda About me What is BIM The Origins of BIM Egan, Latham, Construction Strategy BIM Level 2 Requirements BS1192, BS1192-2 and other documents BIM in Wales Welsh Construction Strategy, CLAW Toolkit How the BRE can help Education Certification Consultancy

About Me

? Dan Rossiter Cov Uni, Architectural Design Technology CIAT member. Associate, working to chartership Cardiff Council, Architectural Technician CE Wales BIM Steering group CLAW BIM Toolkit working group RISC Certified BIM Manager (one of 15, only one that I know of based in Wales) CE Wales Young Achiever of the Year 2014 for my work on BIM in Wales, and PhD work with Cardiff Council Joined buildingSMART and the BRE as a BIM consultant & trainer

What is BIM

BETTER INFORMATION MANAGEMENT What is BIM BETTER INFORMATION MANAGEMENT BIM (Building Information Modelling) It’s not just 3D CAD It’s not just a new technology application It’s not next generation, it here and now! BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them. http://www.bimtaskgroup.org/bim-faqs/ There are many different definitions, and instead of giving my own This quote is taken from the task group website

What is BIM? Word cloud: The words appear larger the more often they are used. This word cloud uses the complete text found within BS1192-2:2013 Information is key. Where is 3D ? IT’S NOT ABOUT THE MODEL

The Origins of BIM

The Origins of BIM Latham Report Egan Report Accelerating Change 1994 Egan Report 1998 Accelerating Change 2002 Never Waste A Good Crisis 2009 Latham Report: Industry should move away from adversarial construction, integrated approach should be adopted Egan Report: Construction in underperforming Recommends 10% reduction in cost & time, 20% reduction in defects via integrated projects Accelerating Change: 20% of construction (by value) to be integrated. 50% by 2007 Never Waste a Good Crisis: Demonstrations have shown that cost, time, defects can be achieved through integration. The industry has not performed. Lack of cohesive industry vision, no incentives for change, too many industry bodies, industry driven by economic forces

The Origins of BIM Quiz Time Based on the last eleven years of KPI’s: ~50% What percentage of projects come in on time and no budget? Wolstenholme, 2009 Taken from Never Waste a Good Crisis

The Origins of BIM Cost Carbon BIM was seen as a way to Improve: From these reports BIM was to be focused with two keys drivers in mind. Cost and Carbon

The Origins of BIM “Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous” Avanti published ‘Production Information’ using the tagline that ‘Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous’. This was later used as the basis for the BS1192 series

“Information is Uncoordinated…” This image shows an architects drawing in Blue with the engineer drawings overlaid in Red. D046 doesn’t’ appear on the engineers drawings, walls clash, the stairs clash

“Information is ambiguous… or why we need Standards” This scenario is directly addressed within BS8541-2:2011. Filled circles are described as ‘from within outline’, but if a filled arrow head had been used it would have meant ‘from outline’, pointing at the smaller circle. By following the standard this would be avoided!

“Information may be incomplete…” This drawing was incomplete, it lacked topographical and tree survey information, which resulted in…

“Information is uncoordinated…” In 1999 NASA famous lost a £125m probe due to consultants using a mix of metric and imperial units. Information needs to be co-ordinated correctly

“Information is also geospatially incorrect…” In 2003 a Swiss / German joint project. The Laufenburg bridge came together with a difference of 540mm as different sea levels datums were used. Agreed standards would have resolved this. Cinema in Cambridge was constructed 750mm out of place, planning issue and the cinema had to be demolished and rebuilt

The Origins of BIM Construction Strategy 2011 There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament. Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year. Essentially the Government has decided it does not want to spend money on waste and defects, and one of the ways to hit its 20% target is through BIM. By collaborating, the cost of defects and design can be decreased. The industry needs to adopt if it wants any government money.

The Origins of BIM BIS BIM Strategy 2011 The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information. This idea is reiterated in the BIM strategy document

BIM Level 2 Requirements

BIM Maturity Levels – Strategy Paper 2011 0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism. 1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration. 2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements. 3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes. 0 – Standard CAD office 1 – Uses common data environments and standard data structures 2 – Uses a federated model (model made up of multi discipline models), and library management 3 – IFC / IFD driven BIM via cloud based servers. No clear indication on how this’ll look at present

UK Standards for BIM BS1192:2007 PAS1192-2:2013 PAS1192-3:2014 (COBie) BS 8541 Series To help you achieve BIM level 2. There are a number of British Standards available BS1192:2007 Common data environments and file naming (required to achieve level 1) PAS1192-2 information management during CAPex using BIM PAS1192-3 information management during Opex using BIM PAS1192-4 COBie BS8541 series looking at object naming, level of detail and standard symbology

BIM Industry Documentation PI For BIM (CIC) BIM Protocol (CIC) Uniclass (CPIC) Digital Plan of Work (BIM Task Group) CPIx Online (CPIC) ? ? Uniclass and dPOW are currently outstanding. RIBA enterprises has one a TSB bid to develop them during the next 6months

BIM in Wales

Task Group Working Paper BIM in Wales CEWales BIM Task Group Working Paper 2012 Recommendations: Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015. A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15. The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence Only Welsh Govt. response being the construction procurement strategy (next slide)

BIM in Wales Welsh Construction Procurement Strategy 2013 Key Objectives and Milestones: Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015. No official response from Welsh Government as of yet

The CLAW All Wales BIM Toolkit BIM in Wales Contains: Introduction Setting the BIM Scene Business Case IT Investment Employer Information Requirements Template Employer Information Requirements Example Glossary of Terms Procurement Guide BIM and GSL Guide Collaborative Maturity Assessment Tool Standards and Protocol Reference The CLAW All Wales BIM Toolkit 2014 (Draft) Aimed at clients to allow for a consistent BIM approach in Wales as it will be utilised my all 22 local authorities when tendering for BIM related schemes.

How BRE Can Help www.bre.co.uk/BIM We at BRE can help achieve these requirements through our Education, Certification and Consultancy Services

BIM Level 2 Training Course BIM Foundation Course (AP) Covering BIM processes, procedures, information models, management and collaboration BIM Level 2 PAS1192-2 Project Information Manager (PIM) Task Information Manager (TIM) Project Delivery Manager (PDM) BIM training courses are available normally at our Watford office. However, from the new year I will be presenting them as well from our Swansea office. We can even come to you if you can get sufficient numbers, and arrange the venue (15+). Can discuss training with me further after the presentation if you wish.

BIM Level 2 Certification Schemes BRE BIM Certificated Professional Schemes Task Information Manager Project Information Manager Project Delivery Manager BRE BIM Business System Certification Scheme Audited BIM Capability Assessment

Business Certificate Scheme Benefits PAS 91 (Working towards UKAS accreditation ) BRE Certificated Audited Business Evaluation Defined Industry Benchmark Lean Process Reduced Employers Effort / Cost Reduced Supply Chain Effort / Cost Checked by Industry Specialist and Supported by BuildingSMART UKI Business Scheme was launched in September and we have one major contractor who has already been assessed and will soon be certified.

BIM Checking Service Documentation Employers Information Requirements (EIRs) BIM Execution Plans (BEP) Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series) Naming Conventions Spatial Co-ordination Model Definition Volume Strategy Level of Definitions Data Segregation Annotations & symbology We also offer a checking services for 3D models (not just Revit!) Where we review how information was produced against the British Standards

Summary About me What is BIM The Origins of BIM Egan, Latham, Construction Strategy BIM Level 2 Requirements BS1192, BS1192-2 and other documents BIM in Wales Welsh Construction Strategy, CLAW Toolkit How the BRE can help Education Certification Consultancy

Any Questions? Dan Rossiter BIM Consulting / Training Manager RossiterD@bre.co.uk