The BIM Toolkit Stephen Hamil – March 2015 – v2.0.

Similar presentations


Presentation on theme: "The BIM Toolkit Stephen Hamil – March 2015 – v2.0."— Presentation transcript:

1 The BIM Toolkit Stephen Hamil – March 2015 – v2.0

2 BIM – Government Construction Strategy Francis Maude Minister for the Cabinet Office

3 BIM – Government Construction Strategy

4

5 Completing “Level-2” BIM Suite

6 The Missing Pieces Digital Plan of Work Classification

7 The Project 20142015 JanFebMarAprMayJunJulAugSepOctNovDecJanFebMar ScopeBriefPhase 1 - DefinePhase 2 - Deliver Clients BriefTeam Industry

8 BIM Toolkit and Level-2 BIM How will the BIM Toolkit benefit those working within the level-2 BIM process? Standards are freely available at - http://shop.bsigroup.com/BIMhttp://shop.bsigroup.com/BIM Standards are freely available at - http://shop.bsigroup.com/BIMhttp://shop.bsigroup.com/BIM

9 Assessment and need Procurement Post-contract award and mobilisation Production Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Maintenance and use

10 Assessment and need

11 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

12 Assessment and need  Client determines their plain language questions (determines the need)  Client produces their employer’s information requirements (Required information to meet the needs as )  Information requirements aligned to the project stages  This is part of the tender documentation

13 Assessment and need – BIM Toolkit A collection of projects

14 Assessment and need – BIM Toolkit Information at a project level

15 Assessment and need – BIM Toolkit Information at a stage level

16 Assessment and need – BIM Toolkit At the start of the project the client has not assembled their team

17 Assessment and need – BIM Toolkit At strategy/brief stage it is possible to determine information needs

18 Assessment and need – BIM Toolkit Template tasks can be modified, removed and added to

19 Assessment and need – BIM Toolkit Tasks and deliverables are assigned to roles prior to the team being assembled This information may be exported

20 Assessment and need Export to MS Excel for inclusion within the EIR document (PDF) …and export to IFC/COBie for digital re-use

21 Procurement

22 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

23 Procurement  Bidders respond with their pre-contract BIM execution plan  Proposed responsibility of bidders supply-chain is provided  The client can compare these against their original information requirements  Selection can take place

24 Assessment and need – BIM Toolkit The proposed roles have been assigned The proposed project team has been added Each item, at each stage has a party responsible The bidder

25 Procurement Export to MS Excel for inclusion within the BEP document (PDF) …and export to IFC/COBie for digital re-use

26 Post-contract award and mobilisation

27 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

28 Production

29 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

30 Production From design suppliers to construction suppliers:  The federated Project Information Model begins to grow  dPOW defines the what, the when and who  Information exchanges between supply-chain  Information delivery to the client as agreed in EIR  Documented classification and data structure allows for verification

31 Assessment and need – BIM Toolkit Moving into the design phases the team is now assembled and the information requirements grow

32 Assessment and need – BIM Toolkit Level of detail guidance can be defined for each deliverable

33 Assessment and need – BIM Toolkit Level of information guidance can be defined for each deliverable

34 Assessment and need – BIM Toolkit A definitions library of 6,000 items across all construction disciplines will be provided

35 Assessment and need – BIM Toolkit At concept stage – the operations phase may be considered

36 Assessment and need – BIM Toolkit At the technical design stage more geometric detail is required

37 Assessment and need – BIM Toolkit The level of information grows through the bandings too

38 Assessment and need – BIM Toolkit LOI-6 contains the standard COBie properties for transfer to the asset management systems

39 Assessment and need – BIM Toolkit The definitions library covers infrastructure in addition to buildings

40 Assessment and need – BIM Toolkit RICS have joined the core team and have provided classification mappings to NRM1

41 Assessment and need – BIM Toolkit A number of new Uniclass classification tables will be published

42 Assessment and need – BIM Toolkit At an early stage space requirements may be specified

43 New Uniclass – the Core Classification

44 Assessment and need – BIM Toolkit Advanced search technology is used to take the complexity away from classification

45 Production What has been asked for by the project lead What is provided by the project team

46 Deliverables COBie XLSIFC 2x3 Documents EIR Data Objects Documents Objects Documents Objects Documents Objects Documents Objects Documents Objects Spreadsheet BIM Tool XML Validation Process Overview Requirements COBieLite Validation IFC Exchange DPoW Exchange BEP Data DPoW Exchange Schema too rich Schema too loose

47 Assessment and need – BIM Toolkit A dPOW in IFC – every deliverable represented as a coloured cube

48 Following hand-over then “In use”

49 Operation Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013 Figure taken from PAS1192-2:2013 – Copyright Mervyn RichardsPAS1192-2:2013

50 -ID -ParentSpace -Level -Manufacturer -Model -ExpectedLife -O+M-Manual -ID -ParentSpace -Level -Manufacturer -Model -ExpectedLife -O+M-Manual

51 More Information BIMTaskGroup.org theNBS.com/BIMToolkit Social Media - #BIMToolkit