1 Managing asset information using BIM Level 2
David Churcher Lead author of PAS Director, Hitherwood Consulting 11 August 2015

2 Topics for this afternoon
Key requirements of PAS How asset owners & operators identify the information they need How asset information is approved and authorised How existing enterprise systems support the Asset Information Model

3 Key requirements of PAS 1192-3
Asset owners establish an information management process for the whole operating lifecycle of the asset The scale and extent of the asset is defined by the owner (could be single building/piece of infrastructure, campus/estate, whole portfolio/network) Process is triggered each time something happens to the asset or whenever work is required Long-term planning is vital – the process has to operate for the life of the asset (30, 50, 120 years)

4 Information requirements Information models
Asset management strategy and plan Asset management informs Information requirements Organizational information requirements (OIR) Information models Adapted from PAS Figure 4 generates Asset information requirements (AIR) Asset information model (AIM) specifies Assets informs contributes to Projects Plain language questions (PLQ) Employers information requirements (EIR) Project information model (PIM) generates specifies

5 Key requirements Define high-level information requirements (OIR)
Based on corporate strategy and stakeholder need Define contractual information requirements (AIR) To deliver the information needed Contractors provide the information requested Through information exchange mechanisms Establish and operate Asset Information Model To hold the information for analysis/decision-making With appropriate validation processes

6 Identifying information needs
Ask stakeholders what asset information they need Every asset owner will have its own set of stakeholders, for example Finance, Operations, End-users, Regulator Focus on real needs, not just a long wish list Turn OIR into supplier-specific AIR Takes time, needs facilitation, may require external (independent) expertise

7 Contractual information exchanges
AIR is part of the task specification Supplier provides information Frequency and detail of information exchanges will depend on the scope of the work (type and scale) Extract from PAS Figure 10

8 Authorizing new information
PUBLISHED information available for use WIP approval by supplier SHARED authorization by owner/operator ARCHIVE maintains the complete audit trail PAS Figure 8

9 Existing enterprise systems
The Published area of the Common Data Environment represents the Asset Information Model BUT Where there are existing systems these can be linked to the AIM Extract from PAS Figure 10

10 Examples of existing systems
Property ownership database controlled by the legal department CAFM system recording energy consumption per building/maintenance activities/etc, controlled by facilities department Access control system recording utilization, controlled by security or finance department Retaining wall strain gauge records controlled by highways department

11 Maintaining information integrity
Data and information in linked systems must be subject to the same checks and approvals Automated data collection through a linked system still passes through WIP, SHARED, PUBLISHED and is recorded in ARCHIVE Alignment between the information model and the physical asset is important Continuous alignment may be too expensive or unnecessary Each asset owner must decide what is appropriate for them

12 Summary Asset information management (PAS ) is a key part of BIM Level 2 Information requirements need to be identified The asset management supply chain needs to be engaged The information management process needs to operate for the long term (the life of the asset) This process should be adding value to your organization. So do it right!

13 Email: david.churcher@hitherwood.co.uk Tel: +44 (0)7900 254090