DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.

Slides:



Advertisements
Similar presentations
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Advertisements

Mice VC Nov 2005Jean-Sébastien GraulichSlide 1 The ADC Problem in MICE o Reminder: Spill, Readout and Digitization o Acquisition Rate vs dead time o Conventional.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring of PID Detectors o Disclaimer o Remarks on Control and Monitoring: 1) Missions.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE DAQ and Controls ReviewJean-Sebastien GraulichSlide 1 DAQ Overview o Terminology o Requirements o Front End Electronics o Trigger System o DAQ Hardware.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Mice CM Oct 2005Jean-Sébastien GraulichSlide 1 MICE Collaboration Meeting Oct05 Review of DAQ Workshop and DAQ Issues Jean-Sebastien Graulich, Univ. Genève.
3/3/991 Minutes from the fall 98 DAQ meetings: TOF crate will always be running in the single event mode Silicon crate may pipeline several (4?) events.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Jean-Sebastien Graulich, Geneva
PADME L0 Trigger Processor
Hall A Compton Electron detector overview
TOF Clock Distribution
Particle ID Diagnostics in the MICE Beamline
Trigger issues for the CALICE beam test
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible Conditions 2) Implementation of Condition Selection o Choice of hardware o Summary Jean-Sebastien Graulich, Geneva

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 2 Reminder  Particle Trigger Triggers the digitization of the signals arriving at the Front End Electronics Should arrive a few ns around the signal (before in case of the SIS 3320) Distributed to all FEE boards  DAQ Trigger Triggers the readout of the Front End Electronics output buffer memory Should arrive at the end of the Spill, after the last event of the Spill We expect about 600 Particle triggers for 1 DAQ trigger Distributed to all VME crates

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 3 DAQ Trigger  DATE requires dedicated input registers at least for 4 event Types: 1)Start of Spill: A signal sent to the DAQ slightly before the beginning of the Spill in order to make sure that all the processes are ready to receive data 2)Physics 3)End of Spill: A signal sent to the DAQ when the readout is finished which allow checking that all the processes have correctly performed the readout 4) Calibration  More inputs allows more options E.g. Calibration events can be pulser or pedestal or cosmics, etc. Dedicated input allows dedicated readout and/or event building and/or tagging with event attribute  We need a busy output for each input, plus a common busy

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 4 Particle Trigger  4 Particle Trigger Conditions for Normal Events Burst: All ISIS bunch crossing with the target can produce a particle trigger, providing the FEE is not busy Beam: Burst x TOF0 Timing given by Burst Upstream: Beam x TOF1 Timing given by TOF1 Traversing: Upstream x TOF2 Timing given by TOF1 TOFn is defined by a twofold (Left x Right) coincidence of the OR of the 12 (8) slabs of a single layer  Trigger condition does NOT depend on Beam Momentum  Trigger Condition should be selected on the Run Control GUI before each Start of Run

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 5 Particle Trigger  Simplest Implementation of the Trigger Condition selection OReg1 OReg2 OReg3 OReg4 Burst TOF0 TOF1 TOF2 Particle Trigger Request FEE Busy Particle Trigger  Setting OReg selects the trigger condition  Not extendable to more conditions !

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 6 Hardware Choice  Need one module per VME crate (= 6 +1 spare) 16 Channels One OReg per IReg + 1 Common Ready to Order ! (1700 EUR/p) Decision needed !

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 7 Summary  DAQ Trigger requires at least 4 channels of I/O register  Particle Trigger looks very simple: only 4 conditions  CAEN V977 is proposed as the DAQ trigger receiver and it has enough channels to be used also as an interface for Particle Trigger Selection