Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
Stephen Milton Undulator System 12 October 2004 Undulator System Update Stephen Milton, ANL.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Jan. 6, 2006 Chamber & Bellows IDR 1 LCLS Undulator Bellows Module Soon-Hong Lee Internal Design Review.
Specs and Design Options for a 8”-flat-panel MCP-PMT Fabrication Facility Dean Walters Argonne National Laboratory.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Dean R. Walters April 20, 2006 Vacuum Chamber Review 1 LCLS Undulator Vacuum Chamber Dean R. Walters.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Stephen Milton Undulator System 14 November, 2004 Undulator System Overview Stephen Milton.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
British Standards BS8888.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)
The reading is 7.38 mm. The reading is 7.72 mm.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
1. 課程大綱 OUTLINE Line Integrals (曲線積分) Surface Integral (曲面積分) 2.
Update on Pavia MM mechanical prototype
Wire Scanner / A.Demougeot
nSW Alignment Installation
TAS at IP1 Present situation and plans
FEA of the On-Off Mechanism Piston Movement Impact
“Changes in Altitude” SMCC Payload Design and Data Collection.
Beam Finder Wire Assembly Undulator System
Linac Coherent Light Source Procurement
Undulator Scope, Management, and Organization
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
Undulator Scope, Management, Organization
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
J. García, F. Toral (CIEMAT) P. Fessia (CERN)
Undulator Integration Test Status
Electron Beam Systems ETC and Methodology
Aluminum Clamshell Vacuum Chamber Development Plan
LCLS Undulator Vacuum Chamber
Breakout Session SC3 – Undulator
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS

Dean R Walters November 15, 2004 Talk Outline Vacuum Chamber Design Current Chamber Design Assembly of Chamber and Undulator Chamber Supports Tolerance Stack-up Future Design Component Layout System Layout Short Diagnostics Break Long Diagnostics Break Integration of Vacuum/Diagnostics with Undulator

Dean R Walters November 15, 2004 Vacuum Chamber Design Current Chamber Design Undulator Vacuum System

Dean R Walters November 15, 2004 Vacuum Design Assembly of Undulator and Chamber Vacuum Design Assembly of Undulator and Chamber Undulator Moves In & Out Undulato r Vacuum Chamber with Supports

Dean R Walters November 15, 2004 Vacuum Design Chamber Supports Supports Chamber Strongback Tubular Chamber 6 mm OD X 5 mm ID

Dean R Walters November 15, 2004 Vacuum Design Tolerance Stack-up

Dean R Walters November 15, 2004 Vacuum Design Future Design Aluminum Chamber

Dean R Walters November 15, 2004 Component Layout System Layout

Dean R Walters November 15, 2004 Component Layout Short Diagnostics Break

Dean R Walters November 15, 2004 Component Layout Long Diagnostics Break

Dean R Walters November 15, 2004 Integration of Vacuum/Diagnostics with Undulator Conclusions Current chamber designs are well developed to continue the design of the cradle Current designs are well integrated together to allow progress to continue Future designs are going to have interior surfaces of aluminum rather than copper, this will necessitate a new approach to the chamber design Questions ?