Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)

Similar presentations


Presentation on theme: "Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)"— Presentation transcript:

1 Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)

2 Lukasz Krzempek TE-VSC-DLM 2 15.12.2015 Status from 24 th Nov

3 Lukasz Krzempek TE-VSC-DLM 3 15.12.2015 Gate valve assembly - TAS side

4 Lukasz Krzempek TE-VSC-DLM 4 15.12.2015 Gate valve assembly - TAS side

5 Lukasz Krzempek TE-VSC-DLM 5 15.12.2015 Status of vacuum layout – 24 th Nov 2015 ATLAS experiment – general side view Status of vacuum layout – 15 th Dec 2015 1.Bellow removal from TAS side -> saved ~70mm 2.All layout moved towards TAS 3.Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1785mm Gate valve from IR side intended to install on chamber support Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1854mm

6 CMS experiment – general side view Lukasz Krzempek TE-VSC-DLM 6 15.12.2015 To keep angle valves in available area, assembly of TAS gate valve moved 70mm towards experimental cavern Distance layout from TAS - 80mm- 24 th Nov Distance layout from TAS - 150mm- 14t th Dec 2.53mm

7 Lukasz Krzempek TE-VSC-DLM 7 15.12.2015 3d models: ST0725893 – CMS ST0723775 - ATLAS