Roberto lopez LSSMBB DMAIC project template.

Slides:



Advertisements
Similar presentations
Six Sigma Overview.
Advertisements

Demystifying 6.
Lean Six Sigma Project Presentation Template
©2014 IDBS, Confidential Statistical Process Control Workshop An Introduction to the Principles behind SPC Ilca Croufer.
Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Assisting Organizations Reach the Next Level of Excellence and Profitability – – -
Project Storyboard Template
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Six-Sigma Management and Lean Tools
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Barry Murash MBBit Nortel 2007
Define Measure Analyze Improve Control 1 Project Title BB Candidate Name Define.
Overview of DMAIC A Systematic Framework for Problem Solving
MOHAMAD SHARIF B ISHAK B
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Do not put content on the brand signature area Basic template Subtitle Location – Date Name of the speaker Job title.
L Berkley Davis Copyright 2009 MER301: Engineering Reliability1 LECTURE 2: Chapter 1: Role of Statistics in Engineering Chapter 2: Data Summary and Presentation.
Black Belt Level DMAIC Certification Checklist
Project Title GB or BB name: XYZ.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
First Developed by Motorola in the mid 1980's, the methodology only became well known after GE's Jack Welch made it a central focus of his business strategy.
Practical Assessment Project Template
Project Title GB or BB name: XYZ. Define Phase D D M M A A I I C C.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Project Briefing Type Briefer Organization Here
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
Project Title GB or BB name: XYZ.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
DMAIC A FIVE STEP METHODOLOGY TO PROBLEM SOLVING 1.
Project Storyboard (Page 1 of 2)
Confidential, , MBX Template Book Confidential, ,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Six Sigma by Aranyos Attila for MSc. Mérnök Informatika Production and Process Management class held by Vida Csaba.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Analyze Wrap Up and Action Items
What is Six Sigma?.

Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
Six-Sigma : DMAIC Cycle & Application
Six Sigma.
Process Capability and Capability Index
Improving Existing Products & Services
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Chapter 2 Six Sigma Installation
Practical Assessment Project Template
DMAIC Project Template
OPS/571 Operations Management
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Certification Resources Workbook
Six Sigma DMAIC Process
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
OPEX DMAIC Routemap Slides
Lean-Green belt six sigma program
Practical Assessment Project Template – REV. 5.2
Six Sigma DMAIC Process
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Roberto lopez LSSMBB DMAIC project template

6 sigma steps (DMAIC) Define Measure Analyze Improve Control Define your business problem Measure your process (Y) performance Find the root causes (X’s) of the problem Improve, implement new solution Deliver Y performance over time

Description of the problem (what? where? since when? based on which data? Based on which facts?) Voice Of Customer (Customer perception) Internal perception Competitors benchmark 1 Pb Statement Business Problem Develop Goal statement/opportunity or objective in clear, concise, measurable terms Demonstrate alignment of the project with the company/business strategy 2 Goal Statement Define

Why to do the project? What if project not done? Financial Business Case Business Case 3 Business Case Define

Green Belt/Black Belt role: Team members/role: Black Belt: Master Black Belt: VP Quality / Quality Manager: Manager: Key stakeholders from Business team: Customers: Others: 4 Project scope Project: in scope DMAIC Dates: Gantt Project: out of scope Project charter 5 Team 6 Planning Define

7 (SIPOC) Process map & CTQ’s process as felt by the customer Input Output Supplier = My Company DefinitionSpecificationPerformance limit targets CTQ* Step 2Step 1Step 3 measurement *Critical To Quality My Customer Define

M-step 1: Selected CTQs Selected Project CTQ(s): Discrete/continuous CTQ? CTQ Operational Definition(s): What is it (measurement starting point and end point) ? How to measure it? What is a defect? If applicable to your CTQ, LSL* contractual value or limit defined by customer: If applicable to your CTQ USL* contractual value or limit defined by customer: M-step 2: Define Performance standard Measure CTQ details *LSL Lower Specification Limit *USL Upper Specification Limit

M-step 3: Measurement System Analysis Measurement system analysis Data Collection plan for Repeatability & Reproductibility study: Data sample size = Date of data collection: Where data have been collected? How data have been collected? How many operators?How many repeats per operator? Gage R&R study – Continuous data: -Tolerance (USL-LSL): -Short method (yes/no): -Gage R&R as %contribution:Gage R&R as %tolerance: Nb of distinct categories: Gage R&R study – discrete data: If we have a Known sample (a reference), then how was built the known sample? Conclusion/decision taken (evidence that the measurement of our CTQ is reliable): Measure Gauge R&R

M-step 4: Baseline current (As Is) process capability CTQ data collection plan Data sample size = Date of data collection: Where data have been collected? How data have been collected? Will you take the opportunity to collect obvious X’s when collecting your CTQ measurements? If yes, which X’s: Display an extract of the data collected: Measure CTQ data collection plan

Continuous CTQ Sample size= Short term data or Long term data? Histogram with Normality test result and descriptive statistics: Type of the distribution (normal, other): Trend represented by its ( , median, Q1, Q3, other): Variability represented by its (  P95, Q1/Q3, other) : PROCESS CAPABILITY MEASURE: NORMAL Distribution Observed DPMO= Potential DPMO= Z LT = Z ST (Z LT +1.5)= Conclusion Problem with trend, variability or both? M-step 4: Baseline current (As Is) process capability Photography of current performance Measure Non NORMAL Distribution Observed DPMO= Equivalent Z LT = Equivalent Z ST (Z LT +1.5)=

Discrete CTQ Sample size: Short term data or Long term data? Process capability Yield (%)= %defects= DPMO= Opportunities per unit= DPU= Equivalent Z LT= Equivalent Z ST (Z LT +1.5)= 95% confidence interval on DPMO: Measure Photography of current performance M-step 4: Baseline current (As Is) process capability

Continuous CTQ Normal probability plot: Conclusion (can we detect a true process and an unstable process?): All type of CTQ Stability over time/Run chart: Conclusion: Pb of technology (short term common causes)? Pb of control (long term shift due to special causes)? Both pbs? A-step 5: As Is process Graph Analysis Analyze Graph analysis

A-step 6: Define Performance Objectives of To Be process Improvement Goal Target (from benchmark) for: Trend: Variability: LT DPMO or LT %defects= Yield (%)= Z LT = Z ST =(Z LT +1.5)= Gap (Improvement – Actual) DPMO gap or Defect reduction factor: Z gap= 6 Sigma tools necessary to meet performance objectives: Ground fruit: Logic and Intuition Low hanging fruit: Basic tools (Process Map, CE/CNX fishbone diagram, SOP, FMEA, Pareto, Histogram, Box plot) Bulk of Fruit Process Characterization and Optimization Sweet Fruit: Transform the project into a DFSS project Analyze Set expected performance

A-step 7: Identify X’s (root causes) Process (AS IS) detail analysis: Detailed process map Conclusion CTQ Intermediate distribution plot (continuous CTQ only) Conclusion Standard Operation Procedures analysis: Exist: Are applied: Incitation to apply them exist: Training has been given to operators: Policy analysis: Exist Are applied Analyze Process analysis

List of potential significant X’s Label C/N/X on your fishbone, then rate every X impact vs implementation (table below) Impact High Low Implementation Easy Hard Analyze Potential root causes A-step 7: Identify X’s (root causes)

Results of segmentation (continuous CTQ only) : (Box plots, Scatter plots, Distributions per X) Conclusion: Analyze Segmentation analysis A-step 7: Identify X’s (root causes)

Pareto chart of the CTQ categories: Conclusion: Pareto chart of the defect categories: Conclusion: FMEA: Conclusion: Analyze Pareto analysis A-step 7: Identify X’s (root causes)

Statistical Tests Performed Test X Factorsp value%contribution conclusion one sample or two sample T-test Annova one way Homogeneity of variance Chi square test Simple regression Non parametric data test ANOVA 2 ways GLM DOE screening Conclusion/Prioritized list of significant X’s: Financial benefits confirmation (Update your Business case): Analyze Hypothesis testing A-step 7: Identify X’s (root causes)

I-step 8: Screen potential causes. List improvement actions/projects List of Vital few Xs (screening DOE): Improvement action plan (Who What When): Improve Improvement actions

I13 X tolerance settings: I-step 9: Discover Variable relationships (if necessary) Transfer function: Proposed Solution: Optimal Settings Confirmation runs capability: I-step 10: Establish Operating Tolerances (if necessary) Improve Improved performance

Control Gage R&R on X’s C-step 11: Define and Validate Measurement System on X’s (if necessary) Control on one X (yes/no): If yes, X measurement system analysis: Data Collection plan for Repeatability & Reproductibility study: Data sample size = Date of data collection: Where data have been collected? How data have been collected? How many operators?How many repeats per operator? Gage R&R study – Continuous data: -Tolerance (USL-LSL): -Short method (yes/no): -Gage R&R as %contribution:Gage R&R as %tolerance: Nb of distinct categories: Gage R&R study – discrete data: If we have a Known sample (a reference), then how was built the known sample? Conclusion/decision taken (evidence that the measurement of our X is reliable):

C-step 12: Determine new Process Capability Process or Product new capability: Continuous CTQ: NORMAL Distribution Observed DPMO= Potential DPMO= ZLT = ZST (ZLT+1.5)= Discrete CTQ: Sample size:= Short term data or Long term data? Process capability Yield (%)= %defects= DPMO= Opportunities per unit= DPU= Equivalent ZLT= Equivalent ZST (ZLT+1.5)= 95% confidence interval on DPMO Statistical Confirmation of Improvement (by statistical test): Confirmation of improved performance Control Non NORMAL Distribution Observed DPMO= Equivalent Z LT = Equivalent Z ST (Z LT +1.5)=

C-step 13: Implement Process Control Control Charts (SPC) in place/review mechanisms: Mistake Proofing action taken: FMEA control actions in place: Process controls Control