Capstone Workshop Henderson DUSEL Conceptual Design Mark Kuchta Mining Engineering Department Colorado School of Mines Lee Petersen, CNA Consulting Engineers.

Slides:



Advertisements
Similar presentations
Engineering Services Planning Limited
Advertisements

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Engineering Controls and Laboratory Design Session 4 Laboratory Safety Training.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Henderson Mine Site. Henderson Mine Central Campus Shaft Collar Elev 10,400 ft Shaft Bottom Elev 7,500 ft LA Ramp Primary Access Ramp 3600 ft Central.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Model for Sharing Facilities Bill Miller-U of M Lab Manager.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
November 11, 2004 Biogeohydrological Environment and Physical Aspects of the Henderson Mine Site Climax Molybdenum Company Henderson Operations.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Director’s Review of August 2-3, 2007 CLASSE ERL Conventional Facilities Donald Bilderback Cornell High Energy Synchrotron Source, School of.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Data Center Facility & Services Overview. Data Center Facility.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Logistics Workshops August 11-13, 2015.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
West Cambridge Data Centre Ian Tasker Information Services.
50% LBNE Concept Design LAr Infrastructure. Mechanical.
Long-Baseline Neutrino Facility LBNF Far Site CF Scope Joshua Willhite Interface and Logistics Workshops August 10-12, 2015.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Updated Design of Detector Hall
$150K Chicago/ANL seed funding for Braidwood site investigation
FCC Tunnel and Shaft Cross Sections
Wilson Hall Fire Protection Features
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
M&E SYSTEM.
Detector hall in mountain regions
Maintenance at ALBA facility: Strategy for the conventional services
Technology in Architecture
Prasanna Narangoda MSc, Bsc (Eng) Hons, C Eng MIESL, MASHRAE, APGBCSL, MLABSE 1 Delivered to UNIVOTEK 22 nd June 2019.
Presentation transcript:

Capstone Workshop Henderson DUSEL Conceptual Design Mark Kuchta Mining Engineering Department Colorado School of Mines Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Architects Dale Holland, Dunham Associates John Jenkins, ILF Craig Covil, ARUP

Capstone Workshop 2 Engineering Design Team Colorado School of Mines: Mark Kuchta, Scott Kieffer, (Mining Engineering, Geotechnical Engineering) Henderson Mine: Chip deWolfe, + Staff (Mining Engineering, Safety) CNA Consulting Engineers: Lee Petersen (Engineering Team Leader, Civil Engineering) Dunham Associates: Dale Holland (Mechanical/Electrical Engineering) Miller Dunwiddie Architecture: Greg Hulne (Architect) ILF Consultants: John Jenkins (Internal Shaft Design) ARUP: (Cost review, construction management plan)

Capstone Workshop 3 Conceptual Design Overview Shared Mine Infrastructure Mine Services Summary Rock Conditions DUSEL Access Ramps Campus Layouts (Upper, Central, Lower, Outposts) Development Sequence System Design Fire and Life Safety Concepts and Code Review Surface Facilities

Capstone Workshop 4 Shared Mine Infrastructure Overriding design criteria Safety Share infrastructure that is of benefit to share Keep the DUSEL and mine operations as separate as possible

Capstone Workshop 5 Site Overview

Capstone Workshop 6 Shared Mine Infrastructure Ventilation 150,000 cfm available for DUSEL Electricity 14 MW with 14MW backup available for DUSEL. Mine Dewatering About 3000 gpm pumping capacity available for DUSEL DUSEL estimated need 500 gpm URAD Water Treatment About 2000 gpm in excess capacity available for DUSEL

Capstone Workshop 7 Shaft Schedule: Man Cage Double Deck Man Cage Capacity 100 people Overall availability about 93.5% Normally available 24/7 Service Cage Capacity 100 People 30 Ton capacity Sling 50 tons with crosshead Cage – 23 ft. long X 8.5 ft Wide X 13 ft high Can move DUSEL supplies at 1140 tons/week to 7500 tons/week depending on shift schedule used. (SNOLab: 336 tons/week)

Capstone Workshop 8 Rock Handling System 80 ton trucks dump rock at crusher. Gyratory crusher reduces to –4 in. 1 mile PC1 and 10.5 mile long PC2 underground conveyors. 4 mile long PC3 surface conveyor to mill site. 40,000 tons per day capacity Mine currently producing about 30,000 tons per day Maximum planned DUSEL production 3,000 tons per day DUSEL rock will be dumped at the crusher on the 7065 level, A fee ($/ton) will be charged for rock removal

Capstone Workshop 9 Henderson DUSEL Layout Central Campus Elev ft, (4300 mwe) Midway Campus Elev ft, (5100 mwe) Lower Campus Elev ft. (5800 mwe) Internal Shaft Access Ramps EarthLab/ Geoscience Area Silver Plume Granite Silver Plume Granite Urad Porphyry 7065 Level 7500 Level Shaft Red Mountain Porphyry Henderson Granite Primos Porphyry Henderson Orebody Harrison Mountain Elev. 12,300 ft Red Mountain Elev. 12,300 ft 1 st Drill Hole 2 nd Drill Hole

Capstone Workshop 10 RQD DUSEL Exploration Hole 001 Section Plan RQD < 25 Average RQD = 92 (Very Good) Three < 10 ft fracture zones

Capstone Workshop 11 LA Ramp Primary Access Ramp Central Campus Elev. 6,800 ft (4300 mwe) Secondary Access Ramp PC2 Conveyor to Mill Site 7065 Level Crusher 7500 shaft station DC1 Ramp 7625 shaft station PC1 Conveyor Dedicated Exhaust Drift Exhaust air Fresh air Henderson DUSEL Central Campus Access

Capstone Workshop 12 Access Ramps Central Campus Elev ft Midway Campus Elev ft Lower Campus Elev ft EarthLab/ Geoscience Area 7500 Level 7065 Level Internal Shaft 2 nd Drill Hole 1 st Drill Hole Secondary Access Ramp Primary Access Ramp

Capstone Workshop 13 Ramps Central Campus Elev ft Primary Access Ramp (to main shaft) Ramp to Midway Campus Secondary Access Ramp (to crusher) Internal Shaft Exhaust Drift

Capstone Workshop 14 Internal Shaft (winze) – Top at Central Campus 20 ft diameter Concrete lined Capacity 5 ton Capacity 20 people Sink top down Keep sinking bucket for hoisting Lower Campus excavation rock

Capstone Workshop 15 Shaft Cross Section

Capstone Workshop 16 Access Ramp Cross Sections Muck HaulageShipping Container

Capstone Workshop 17 Upper Campus Layout 8100 Shop (2500 mwe) 7500 Level (3300 mwe) #2 Shaft Ventilation Shaft Mining Area PC2 Conveyor to Mill Site

Capstone Workshop 18 Upper Campus Layout

Capstone Workshop 19 Central & Lower Campus Isometric

Capstone Workshop 20 Central & Lower Campus Building Blocks

Capstone Workshop 21 Central Campus Layout

Capstone Workshop 22 Central Campus Layout w/ Large Multi-Purpose Detector

Capstone Workshop 23 Lower Campus

Capstone Workshop 24 Infrastructure Design Life Criteria Suggested initial design life (capacity only) Lab life—50? years Drift cross section—sized for full expansion Duct size—20 years Power conductors—20 years Power transformers—10 years Chiller piping—20 years Chiller plant—10 years Communications—10 years

Capstone Workshop 25 Lab vs. Infrastructure Development Plan

Capstone Workshop 26 Development Sequence

Capstone Workshop 27 Fire & Life Safety Concept

Capstone Workshop 28 Lower Campus FLS Provisions

Capstone Workshop 29 Lower Campus FLS Provisions

Capstone Workshop 30 Fire & Life Safety Next Steps Meeting with MSHA and OSHA Regional offices on March 30, 2006 Meeting with Clear Creek County building code officials on March 31, 2006 Objective—MOU defining jurisdictions, codes, etc.

Capstone Workshop 31 Henderson DUSEL System Design Ventilation System Electrical System Incl. redundant, backup and emergency systems Fire and Life Safety Compartmentalization Monitoring & alarm Fire suppression Fire separations Egress routes & exit indicators Security stations Refuge Chambers Evacuation Routes Water & Wastewater Systems Data Systems Personnel control Control room w/ CCTV Cameras Personnel monitors Paging system Emergency & rescue systems Ambulance & fire truck Emergency cabinets Blast doors

Capstone Workshop 32 System Conceptual Design Basic services: Provided to occupied Upper, Central and Lower campus areas Power, air, potable water, fiber communications, lighting, emergency safety systems and selected drainage Ventilation systems: Provided to Upper, Central & Lower Campuses Basic normal and emergency ventilation Distribution systems Central services: Terminate at the experiment caverns for tenant connections Fresh air, chilled water, power, process piping, communications, and safety systems

Capstone Workshop 33 Ventilation & Cooling Design Criteria Virgin rock surface temperatures: 90°F at upper campus 107°F at central campus 142°F at lower campus Projection of bore hole temperature readings Heat transfer coefficient Btu / hr-ft2 -°F after 720 days Based upon published data Mine ventilation air Supplied to the central campus at 78°F

Capstone Workshop 34 Ventilation Systems Access & egress tunnel ventilation Normal Upper, Central & Lower campus ventilation Interconnecting drifts ventilated using mine air (no A.C.) Caverns have conditioned air (chilled water coils, electric heating coils to control humidity, filtration) Clean space ventilation system Safety ventilation systems Compartmentalization smoke ventilation Smothering gas ventilation Central exhaust system Special exhaust system Special process exhaust, toilets, flammable liquid, etc. 10,000 cfm each at Central & Lower Campus

Capstone Workshop 35 Cooling Each campus will have a chilled water loop Estimated Immediate Cooling Load Upper Campus 25 Tons Central Campus 85 Tons Lower Campus 175 Tons Estimated Future Cooling Load Upper Campus 90 Tons Central Campus 395 Tons Lower Campus 430 Tons

Capstone Workshop 36 Plumbing Water systems Potable via bottles Non potable from mine system, stored in tanks Sanitary waste Lift station to a holding tank, periodic transfer to surface Gray water 500 gpm total flow Sumps at Central, Midway and Lower Campus Pumped into the Henderson mine water system

Capstone Workshop 37 Process Utilities & Fire Protection System Process utilities Central nitrogen gas system Compressed gas system Clean dry compressed air Cryogen relief De-ionized water system Fire protection system Each campus will have a wet pipe sprinkler system Drift standpipe systems Fire protection water storage tanks

Capstone Workshop 38 Lighting Normal lighting Caverns 30 foot-candles (either metal halide or fluorescent depending upon height) Office, lunch, shops at 50 fc Miscellaneous at 20 fc Egress routes at 1 fc Emergency lighting

Capstone Workshop 39 Power New feed from the surface at 13,800 V Unit substations at each campus 277/480V for lighting & power to mechanical systems 120/208V for receptacles Demand All campuses, immediate: 2975 kVA All campuses, future increment: 3990 kVA All campuses, total: 6965 kVA

Capstone Workshop 40 Emergency Systems Emergency power Fire alarm system Surveillance cameras Access control Security Duress alarm Asset locator Personnel emergency device & tracking

Capstone Workshop 41 Communications Backbone cabling Single-mode fiber 10-gigabit Ethernet 192 strands of fiber from surface and to each campus Campus cabling Category 6 unshielded twisted pair

Capstone Workshop 42 Site Placement Visitor Center – Interface with Public Parking – Relationship to Office Offices, Laboratories, Warehouse and Shops – Achieve a campus grouping of buildings Dormitory & Cafeteria - Location to be determined, near campus Future Expansion - Post Mine closure

Capstone Workshop 43 Surface Buildings Surface Building Program Visitor’s Centertotal 50,000 sfto yr 15 30,000 sf Admin/Offices/Laboratoriestotal 85,000 sfto yr 15 65,000 sf Dormitory & Cafeteriatotal 35,000 sfto yr 15 35,000 sf Assembly, Shops & Storagetotal 25,000 sfto yr 15 25,000 sf Existing Facilities (available after about 2026) Office Building87,759 sf Surface Shop26,000 sf Shaft Hoist House 9,600 sf Surface Warehouse14,000 sf Building reuse issues DUSEL program needs & phased buildout Existing building locations

Capstone Workshop 44 Surface Building Phased Buildout & Budget $ in thousands, 2006 $Between year 15 & year 20, existing Henderson Mine buildings become available for DUSEL re- development