CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)

Slides:



Advertisements
Similar presentations
1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
Advertisements

Π 0 search N.Kitagawa Flab Nagoya University OPERA Emulsion Workshop 2008/01/22-23.
SUTS data taking and processing K.Morishima. Introduction to Morishima ・ Refresh ・ Development of Plate Changer ・ Development of Dry lens scanning ・ Development.
SUTS Data taking and processing with Monitoring K. Morishima Flab Nagoya Univ. OPERA Emulsion Workshop 2008/01/22-23.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Vertex location status of Japan Nagoya vertex hunting team Y.Nonoyama, K.Hamada, S.Takahashi, H.Kubota, R.Komatani 2009 Jan 22 OPERA Japan Meeting.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 20/01/2009 MIZUNAMI.
WG-3 summary CS scanning. People O.SatoNagoya Y.NonoyamaNagoya S.MiyamotoNagoya J.YoshidaNagoya T.FukudaNagoya T.NakanoNagoya S.AokiKobe Luigi Salvatore.
Performance of Compton Alignment in OPERA CS, 2008 run Seigo Miyamoto Jan., 2009, MIZUNAMI.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
Automatic Track Follow Program A program to trace a given set of tracks automatically –Event location for PEANUT and OPERA –DONUT “not-located” events.
CSd analysis Natalia for the European CS Scanning Team.
Report of the Oscillation Working Group and status of Charm study 1 F. Juget – D. Duchesneau Ankara, April 1rst 2009.
OPERA 2008 run: a report from the Swiss scanning lab Ciro Pistillo LHEP Bern university for the Swiss scanning team OPERA Collaboration meeting Ankara,
Reconstruction of neutrino interactions in PEANUT in general scanning (unbiased) mode Giovanni De Lellis on behalf of Andrea Russo Naples University.
CS LNGS Current status and perspectives.
Application of the Beta-ray alignment for the OPERA CSDs Seigo Miyamoto.
PEANUT Brick Scanning for NETSCAN by S-UTS Kunihiro Morishima F-Lab Nagoya University BL118 Peanut Fermi Lab 2007/01/22-23.
Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr Scanning Report from Salerno Brick scanning overview Pending Events An Interesting.
I. Kreslo, LHEP, Bern Bern Scanning Laboratory Hunting muonless interactions...
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
Summary of the event location in Europe Giovanni De Lellis.
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
CS Scan report at Nagoya Film samples August run Rock muon events Comic ray events October run Rock muon events 1 event (1 Brick) Cosmic.
Vertex localization in Lyon Emulsion Workshop 7th-9th Dec. 2006, Nagoya Luisa Arrabito – IPN Lyon.
Evaluation of SySal efficiencies for 1  sample Chorus Collaboration Meeting Ishigaki,7-8 April 2003 Emiliano Barbuto, Chiara Sirignano, Salvatore Sorrentino.
Physics coordination 21/1/09 D.Autiero, S.Dusini Introduction.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 02/04/2009 ANKARA.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
Received bricks: 94 ( ) (5 black CS) Extracted by mistake 1 ( 1 + 0) 93 ( ) Located in ECC: 72 ( ) (2 black CS) Located in dead material.
Rome scanning report After training ( Brick # , ev. # from Salerno: relocated ), 4 bricks assigned - 3 in this report [1 more assigned.
Status of Napoli scanning laboratory OPERA Emulsion Workshop, Nagoya, 7/12/2006 F. Di Capua on behalf of Napoli group.
CS general status on behalf of JAPAN CS Analysis task force team T.Fukuda, S.Miyamoto, Y.Sakatani, Y.Taira 2nd April, OPERA Collaboration
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
Status report from Swiss labs Ciro Pistillo LHEP Bern University Opera Emulsion Workshop Nagoya December 7 / 9.
Jean Favier OPERA Meeting Ankara 3/04/09 1 Some ECC features studied with GenIma Efficiency with no fog Efficiencies with fog Micro-track number versus.
CS to brick and track follow-up ● Cosmic ray test ● CS scanning ● CS to brick connection ● Track following Napoli Scanning Lab.
MonteCarlo simulation of neutrino interactions in PEANUT Giovanni De Lellis on behalf of Alberto Marotta and Andrea Russo Naples University.
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
CS Brick connection at Nagoya O.Sato
Reconstruction of neutrino interactions in PEANUT G.D.L., Andrea Russo, Luca Scotto Lavina Naples University.
1 Status of the ‘Oscillation Physics’ WG Recall of the organisation and activities of the group –Main subjects and general approach –Starting steps and.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
EM shower reconstruction and located neutrino event analysis Ciro Pistillo (Bern LHEP) on behalf of the Swiss OPERA groups.
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
G.Sirri – INFN Bologna videconf Fiducial Mark Finding with ESS 1/6 VersionDateBinarySourceConfigNote zip same as 62 Recommended.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
DB-based DAQ monitoring and Physics analysis tools Emiliano Barbuto European Emulsion Group (LNGS May 2003)
Status and results from OPERA Tomoko Ariga LHEP, University of Bern on behalf of OPERA Swiss groups of Bern and ETHZ.
Jean Favier LAPP CERN Physics and soft meeting 23/04/04 Why Monte-Carlo ? To understand and separate influences of parameters (ex: fog d, distorsions,m.i.p.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
Status of European Scanning System (Bari, Bern, Bologna, Lyon, Napoli, Neuchatel, Roma, Salerno) The final fast version is ready and working up to 20 cm.
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
LNGS Scanning Station Status Nicola D’Ambrosio (LNGS Group) Ankara, 2 April 2009.
Study of hadron interactions in OPERA-like bricks Aim: background study of   h, hhh decays 4 th September 2012 H. Shibuya, H. Ishida, T. Matsuo, T. Fukuda,
Event location and decay search in Switzerland Swiss group.
Emulsion Simulation Y. Caffari (IPN Lyon) F. Juget (IPH Neuchatel) A. Marotta (CNRS-IN2P3 Lyon) CERN 3-5/05/2006.
OPERA Physics Coordination, CERN, 03/05/2006 Effect of  and  radiation on the on-line emulsion scanning M. Cozzi for the Bologna group.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
T2K muon measurement 2014 Momentum module A.Ariga, C. Pistillo University of Bern S. Aoki Kobe University 1.
Swiss Scanning lab report A. Ariga for Swiss group.
N. Saoulidou & G. Tzanakos1 Analysis for new Period 3 Events N. Saoulidou and G. Tzanakos University of Athens, Department of Physics’ Div. Of Nuclear.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
The Status of the OPERA experiment II
OPERA Stato dell’esperimento Run 2007
Bari emulsion lab: status report
Italian Lab Meeting-CETARA September 2010
Presentation transcript:

CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 2 CS scanning protocol 1.CSd are scanned according to fog level – different cuts are applied for the two samples 2.Double base-track search (STANDARD) 3.Manual check validation 4.Event validation 5.In case of null (double bt) result: (MICRO) – Compton alignment – ¾ search 6.In case of null result after ¾ search: – we rescan the event according to its topology we expect to do it in 10% QE events (see Natalia’s talk) 7.request second brick and send the first back to detector (only after positive result of the second) 8.Support to the labs when the event is not located in ECC Automatic See Fabio’s talk

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 3 Current situation Currently using up to 7 microscopes for the scanning + 1 devoted to manual check 24/7 shift – coverage was around 85% before Christmas, significantly reduced afterwards Scanning Station is able to digest 50÷60 CSd/week in this condition SySal2000 (VS6, ST8.5) – Improvements excepted from the release made by Cristiano, tests foreseen

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 4 Present numbers of the 2008 run The status as of :00 LNGS time From , 72 development batches not uniformly distributed in time CS_DEVELOPED818 EVENTS712 CS_MEASURED709 BRICK_DEVELOPED *417 BLACK_CS25 BRICK_BACK8 * Including some ¾ search

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 5 Event classification 417 bricks were developed after positive result from the CS scanning: – STANDARD search: 402 – MICRO search: 15 Relative ratio may change since the micro-track search is in progress

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 6 Black CS 1154 is black!

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 7 High fog CS

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 8 High-fog CS scanning N (Fog > 10) = 104 (12.9 %) N (Fog > 20) = 44 (5.4 %) N (Fog > 30) = 18 (2.2 %) Current protocol: use ScanGrid when Fog > 10 grains/µm 3

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 9 CS scanning trend 3 weeks to complete the scanning of the 1 st extracted CSd (  140 remaining) 2 nd probable bricks being extracted (4 weeks for  200)

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 10 Estimates from the previous slide The scanning rate is 50÷60 bricks/week, enough to follow the extraction/development rate  to be doubled for 2009 run (including second brick extraction) The success rate ~ 60% can be slightly improved  ¾ routinely applied but still lengthy

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 11 Scanning speed Standard scanning ScanGrid Data from 7 microscopes, 2 microscopes are used with ScanGrid For the low fog CS, the nominal speed is affected by the reduction of scanning thresholds Scanning speed is strongly affected by fog level ScanGrid will be extensively used. Increasing computing power is planned: an upgrade of the LNGS planned in the coming weeks

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 12 Data quality: impact of the rescanning Scanning data quality (micro-track per view, emulsion thickness, reconstructed base-tracks) is monitored with an “online” tool Appropriate actions are taken when DQ is not satisfactory, such as CSD rescan on small areas Progressive reduction of rescanning while keeping constant the effectiveness

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 13 CS scanning data quality notch

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 14 CS track multiplicity

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 15 CSd-TT comparison: NC events Nearest CS track with respect to the centroid of the electronic prediction Accuracy ~ 9 mm in both projections

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 16 Analysis of the second extracted brick to evaluate the improvement in the location efficiency Events with a 2 nd brick extracted105 passing through track in 1 st brick11 1 st brick still under analysis19 1 st brick developed8 Both CS black1 Not measured…yet14 2 nd CS scanned52 2 nd brick developed20

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 17 Preliminary results MeasuredDevelopedRatio (%) 1 st brick  nd brick  st & 2 nd brick75.9 These estimations are VERY PRELIMINARY for the following reasons: some manual check not yet concluded some event validation not yet concluded 3/4 search not yet applied in case of null double base-track result So the value has to be considered as a lower limit

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 18 Complicated event #1 Two CSd measured: no convincing track to develop a brick

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 19 Complicated event #2 First brick extracted

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 20 Complicated event #2 Second brick extracted

20/01/2009 OPERA Collaboration Meeting in MIZUNAMI 21 Improvements and conclusions Shift coverage 24/7 (+15%) Increase number (+3 from Lyon) of microscope (+43%) Increase scanning speed (+13%) Total rate increase: + 85% Data quality improvements – Test new SySal2000, released by Cristiano – Procedure improvements: – Compton alignment and ¾ search