1 Italian Lab Meeting-CETARA 13-14 September 2010
Padova Scanning lab. Umut KOSE INFN-Padova Italian Lab Meeting-CETARA September 2010

2 Italian Lab Meeting-CETARA 13-14 September 2010
Microscopes Scanning was stopped about 1 month due to some hardware problems (Bari meeting). Thanks to Gabriele, with his help the problem understood (X-axis encoder is broken) and solved. The scanning resumed 5 August. For a quick solution, we exchange the stage with the new one which was bought for the second microscope. Therefore the construction of the second mic. delayed for awhile. Broken stage have been sent to MICOS company, Germany on 30 August. We are waiting for detail information. Microscopes Italian Lab Meeting-CETARA September 2010

3 Italian Lab Meeting-CETARA 13-14 September 2010

4 Italian Lab Meeting-CETARA 13-14 September 2010
Some questions.. What kind of events would be glued, edge or all? Not glued!!! Not glued!!! Italian Lab Meeting-CETARA September 2010

5 Italian Lab Meeting-CETARA 13-14 September 2010
Brick Handling: For several bricks, emulsion films was not in a correct order!!!! What happens? Can we see the web page in which all CS scanning results stored, from outside of LNGS? Glued!!! Not glued!!! Italian Lab Meeting-CETARA September 2010

6 Italian Lab Meeting-CETARA 13-14 September 2010
Quick check of CS predictions 70% CC  71% with muon  45% 4/4 and 55% ¾ 77% of the tracks 4/4 + 23% 3/4 43% convergence pattern seen (%67 with muon + 33% no muon) 29% single track on CS (75% muon + 25% hadron) and (25% 4/4 + 75% 3/4) 30% NC  45% of the tracks 4/4 + 55% 3/4 50% convergence pattern seen Italian Lab Meeting-CETARA September 2010

7 Italian Lab Meeting-CETARA 13-14 September 2010
Software: SYSAL.net cuba-libre edition.. Last version of ScanGrid.. Standard scanback location procedure is followed.. Updated decay search procedure .. Man power: 1 expert + 1 shifter Looking for Master/Ph.D students Current speed 4events/week Italian Lab Meeting-CETARA September 2010

8 Italian Lab Meeting-CETARA 13-14 September 2010
2009run CC NC Total Events 29* 10 39 CS-ECC connected 27 7 34 Not connected 2 3 5 Located in ECC 21* 26 Penetrating the brick 4 6 Interesting event 1*** 1 *2 black CS events. ***there is a problem to extract downstream brick by the BMS Italian Lab Meeting-CETARA September 2010

9 Italian Lab Meeting-CETARA 13-14 September 2010
Charm candidate 1ryvertex pl51 base 0.0394 0.0609 2.9 (muon) 2.8 0.8 1.9 0.1355 1.4(parent) Event number: Brick number: Black CS Event type: CC 1ry vertex at pl51 base Decay vertex between pl51-52 in lead Decay vertex pl52-51 in lead plate 0.0319 0.2462 2.2 0.0996 0.2041 0.9 1.5 Trident topology Trident topology, FL: 750micron. No nuclear fragments were observed on pl52. To do full kinematic analysis of the event, downstream brick is requested. Italian Lab Meeting-CETARA September 2010

10 Italian Lab Meeting-CETARA 13-14 September 2010
2010run CC NC Total Events 1 CS-ECC connected Not connected Located in ECC Penetrating the brick Interesting event Italian Lab Meeting-CETARA September 2010

11 Italian Lab Meeting-CETARA 13-14 September 2010
Future prospects Start scanning with second microscope, When 2nd mic. ready for scanning, plate changer would be attached and configured. With current speed 4 events/week could be finished. With second microscope we could increase the number of located events.. Italian Lab Meeting-CETARA September 2010