Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bari emulsion lab: status report

Similar presentations


Presentation on theme: "Bari emulsion lab: status report"— Presentation transcript:

1 Bari emulsion lab: status report
● Hardware and software ● Event location ● Decay search ● Brick exchange ● Lab organization OPERA Emulsion Scanning Meeting, Cetara, 13 September 2010

2 Hardware and Software 3 microscopes (oil objective)
2 microscopes equipped with TecnoCut Plate Changers (in tape configuration) used for scanning (all films currently being glued) 1 microscope used for the scanning of not glued films (a few bricks) Software: Chrysalis Momentum (with ScanGrid)  upgrade to Cuba Libre foreseen before the end of the year in parallel with foreseen stop for the installation of final DB storage array (?)

3 Analysis not possible (HF/Bad quality bricks)
Event location RUN 2008 CC NC Total Events 98 19 117 Analysis not possible (HF/Bad quality bricks) 2 Scanning started 92 17 109 CS to Brick ok 80 14 94 Located  interactions 71 10 81  interactions in dead material 1 Passing-through New brick requested 3 CS re-analysis requested 6 8

4 Run 2008 location summary 117 events (130 bricks)
Location fraction : 0.71  0.04 % Location efficiency (started bricks):  % located interactions (2 NC single hadron stops) 6 events not yet measured pending events 3 new bricks never delivered (events CC, CC, CC)

5 Analysis not possible + Poor events
RUN 2009 CC NC Total Assigned events (bricks) 114 30 144 (154) Delivered events 106 26 132 Analysis not possible + Poor events 3 1 + 1 4 + 1 Scanning started 99 20 119 CS to Brick ok 90 17 107 Scanning completed 9 1 10 Located  interactions 61 11 72  interactions in dead material 4 5 Passing-through New brick requested CS re-analysis requested 6

6 RUN 2010 CC NC Total Assigned events 5 1 6 Delivered events
Analysis not possible Scanning started CS to Brick ok Scanning completed Located  interactions  interactions in dead material Passing-through New brick requested CS re-analysis requested

7 Decay search CC NC Total Located 2008 + 2009 (ECC) 132 21 153
7 + 4 Brick Run Event type 65097 2008 CC, charm candidate 13058 NC, hadronic interaction 10010 CC, hadronic interaction 137454 2009 118858

8 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
Standard reconstruction ▪ Primary vertex with 8 prongs (lead plate between films 28 and 29) ▪ Secondary vertex with 5 prongs (neutral parent) ▪ One primary track clearly pointing to secondary vertex

9 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
Track SX SY I.P. (m) 419 -0.011 0.011 5.0 741 0.110 0.176 9.5 423 -0.030 0.069 6.7 485 -0.192 0.288 3.2 746 muon 0.075 -0.069 1.1 490 -0.217 0.194 195 -0.350 0.168 12.5 374 (-0.082) (-0.309)  (top micro only) After visual inspection ▪ Primary vertex with 8 prongs (1 ) confirmed in lead plate between films 28 and 29, depth ~ 875 m

10 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
Bologna Bari Napoli TX TY IP out of acceptance extra track to be confirmed in 29 ( ) top micro,  passing-through? TX TY IP not found

11 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
After visual inspection ▪ Secondary vertex: track 1054 (SB) starts in film 32 tracks 759 and 750 are ’s, film 32 track 830 starts in film 33 track 839 is a , film 34 track 830 starts in film 33 track 839 is a , film 34 disconnected from vertex

12 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
After visual inspection ▪ Primary vertex with 8 prongs (1 ) confirmed in lead plate between films 28 and 29, depth ~ 875 m ▪ Secondary vertex in lead plate between films 31 and 32, kink topology + gammas, parent track 419

13 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
After extra-track search ▪ 4 additional tracks selected Not done: study of extra-tracks follow-down of all tracks

14 Brick exchange PRELIMINARY! Event 234276347 Brick 44354 (Napoli)
Daughter particle: P = 0.94 [0.69, 1.48] GeV/c kink angle: 224mrad Pt = 0.21 [0.15, 0.33] GeV/c

15 Lab organization List of priorities: ● Completion of DS 2008
Scanning of 2009 bricks Start of DS 2009 (located events) ● Re-start of 2009 location DS 2009 Start of 2010 scanning ● Pending events (2008, 2009) Aim: reach a steady-state operation with event reconstruction and analysis performed at the same time


Download ppt "Bari emulsion lab: status report"

Similar presentations


Ads by Google