(Company) Induction. Policies These can be found on all notice boards and you must spend the time to read them. Company have the following Policies: Health.
HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
SAFETY AND SECURITY. SAFETY These are hazards in any establishment and their prevention is of tremendous importance. The housekeeper, along with other.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Hazardous Substances. Employer’s Responsibility Every employer has a duty to ensure that their employees and others are not exposed to risks to their.
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Hong Kong Polytechnic University General safety induction - supplement of the new employee safety checklist.
Safety & Security Contractor Induction Property Management.
© Imperial College London 1 Requirements and Regulations & Safety in the Laboratory Dr. Ann Maconnachie Departmental Safety Officer.
Laboratory Safety Advice to Students on Safety in the Geography Science Laboratories Safety and Security Handbook UNIVERSITY OF CAMBRIDGE DEPARTMENT OF.
Safe Working Procedure – Confined Spaces
Safe Learner Induction Stage 1 (complete) Harry Wheatcroft Safety Advisor.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Health & Safety COSHH & PPE.
Material Safety Data Sheets Why do you as a Manager, cook or CN Helper need to know about Material Safety Data Sheets.
Material Handling. Introduction Handling and storing materials include a wide variety of tasks like: Hoisting tons of steel with a crane Driving a truck.
Risk Management (Safe Work Method Statements)
HEALTH AND SAFETY AT WORK ACT (HASWA). What does it do ? HASWA is there to secure the health and safety of people at work. HASWA is there to secure the.
Student Health & Edinburgh Napier University Health & Safety Team | Edinburgh Napier University.
School of Engineering & Electronics Safety Presentation.
Construction Site Safety
Standard 29 CFR Part Hazard Communication.
Engineering Health, Safety & Environmental
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
Week 3 OHS Ms. Vishali.
Hansen – Managing Safely 1 The Construction (Health, Safety, and Welfare) Regulations 1996 Mark Mallen Health And Safety Manager Fenlock Hansen Ltd.
NEC Site Induction: Organiser & Contractor Construction (Design & Management) Regulations CDM.
Preventing Slips & Trips at Work
Safety Induction to the Lift & Escalator Industry
Life Saving Rules Motiva Enterprises.
OHS&W IN THE ART ROOM. STORAGE Shelves and racks should be stable and ideally built in or fixed to walls Ensure that storage racks are in a safe and tidy.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK I On arriving at site, please contact your host via Reception Your host will provide a full.
Control of Substances Hazardous to Health
Hazard Communication Presentation Presented by: Western Assurance Corp Desert Utility & Paving, LLC and Century Club Construction, LLC Design © 2005, 2012.
-Safety device or equipment -Administrative control -Personal protective equipment (PPE)
Construction Site Safety
Site Safety, Health & Environmental Induction. Management Commitment to H&S Operate in accordance with Health & Safety best practice Develop and maintain.
3D LEISURE - Health & Safety Refresher Training Manual.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
CONSTRUCTION BASICS STAYING SAFE ON SITE By COLDROP.
Procedure for Using SCAG Mower (Revision 1 – 11th November 2010) Toolbox Talk.
BMS4667 Laboratory Leadership and Management Dr. David Ricketts.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
SCOTTISH BORDERS SAFETY FORUM WORKING SAFELY WITH WORK EQUIPMENT Compiled by Donald A Mackay Mainetti UK Ltd.
Cleaning Chemicals PPE Administration Engineering Substitution
Construction Site Induction A guide to “HOW TO” “HOW TO” by Coldrop.
CDM Site Induction SCS FORMULATE HALL 1, RICOH ARENA 15 – 16 NOVEMBER 2016 CDM SITE INDUCTION.
We always have time to work safely
Handout 1: Health and safety at work
Student Health & Edinburgh Napier University
C.O.S.H.H Awareness Session
Safety Considerations
STAYING SAFE ON SITE By COLDROP
Student Health & Edinburgh Napier University
NSW Construction Induction Green Card
Welcome to ‘project name’
Health and Safety Induction
Personal Protective Equipment
Safety is part of our culture at Halliburton
Health and Safety Induction
Cleaner Colleague Induction Tour: Trainer Guide
Induction Tour: Trainer Guide
Safety Orientation for Construction.
Legal and Organisation requirements for data recording
ULTIMA BUILDING GROUP PTY LTD
Health and Safety - Richard Quenby
Michaela Thwaite v3 31/05/2019 Induction Tour
Presentation transcript:

Welcome to Tulloch’s Site Induction WORK SAFELY

Introduction WORK SAFELY Induction training aims to improve the health, safety and environmental awareness of each individual on site. Safety is important, people die every week on UK construction sites. A number of those that die are very new to site and the environment around them. All personnel and visitors to site will be briefed on general site hazards, safety and environmental rules. It is each individual’s duty to take reasonable care for the health and safety of themselves and others around them. Method Statement briefings, Risk Assessment and Tool Box Talks will be given at regular intervals, you must ensure you understand these instructions and if you are in doubt, ask! Inform your supervisor if you see anything unsafe. Any persons suffering from a medical condition that may require special care must highlight this to site management in private, and this information will be kept confidential. WORK SAFELY

Site Rules All supervisors must report to the site office when first arriving for each shift and notify site management which personnel, under their control, are currently on-site. Any person deemed to be under the influence of intoxicating substances will face immediate removal from site, and further action could be taken. If in contact with the public or others, be polite and courteous at all times. All enclosed areas on-site are designated as No Smoking areas, including all containers, cabins and welfare facilities. WORK SAFELY

Plant and Equipment WORK SAFELY You MUST NOT operate any plant or equipment unless it has been inspected, it is serviceable and you have been trained and authorised to do so. Where a seat belt is fitted it must be worn by the operator at all times. Do not stand behind machines or vehicles when they are being loaded. No passengers are to be carried on dumpers, forklifts etc or in the cabs of JCBs or similar vehicles unless a passenger seat with seatbelt is provided. Mechanically operated plant must not be left unattended with the engine running. DO NOT leave keys in unattended plant. Any damage to plant or equipment should be reported immediately to site management. WORK SAFELY

Refuelling WORK SAFELY Prior to refuelling any plant, ensure that there are no persons smoking within the immediate area and that there are no other sources of ignition which may ignite any flammable vapour released. Check that the fuel being used is the correct type and mix for the plant being refuelled. Petrol MUST NOT be used in confined spaces or kept in storage areas that will allow a build up of flammable vapour. DO NOT leave any refuelling operation unattended. Ensure that all fuel containers are locked when not in use. All flammable liquids and gases must be stored in suitable containers with prominent hazard identification markings. WORK SAFELY

Excavations No excavation is to commence without first obtaining a Permit to Work from the site agent. All excavations must be suitably shored or battered back to a safe angle. No excavation may be entered unless a daily inspection has been carried out. Care should be taken to ensure that no excavation is left open without appropriate barriers to prevent falls. All excavations must be suitably fenced at the end of each shift. WORK SAFELY

Buried Services Before work starts the area should be CAT Scanned with location of services marked. All permits issued must be followed. All services must be exposed by use of a Soil Pick or similar. Do not use an excavator or power tool to dig, break out or scrape unless in agreement with method of work detailed in Permit to Excavate. Stop work immediately if you find anything suspicious or unexpected. Inform your supervisor. WORK SAFELY

Working at Height HSE hierarchy of control. Consider first: - suitable working platform with edge protection. - if not practicable provide: - nets, bean bags, air bags. - if still not practicable: - consider ladder for work of short duration. When working at height be aware of others who may be working below. Trestles should not be used above bottom setting and then only when level and a clear area is provided - consider scaffolding. Ladders must extend above the landing platform and be suitably tied or footed when in use - for short duration work only. WORK SAFELY

Scaffolding Scaffolding must only be accessed by the correct route and MUST NOT be altered by unqualified persons and only on the authority of site management. It is the responsibility of all personnel to ensure suitable scaffolding has been erected, where required, to conduct work safely. Any problems should be highlighted to site management immediately and any defective scaffolding should NOT BE USED until repaired by an authorised person. WORK SAFELY

Lifting Equipment Lifting equipment should not be used unless it has been inspected before use. Never use any lifting equipment unless it is correctly marked showing the SWL and it has a current test certificate. Any faults should be reported to your supervisor immediately. WORK SAFELY

Control of Substances Hazardous to Health Never use substances unless you have been informed of the safe method of work associated with the product. If required, additional personal protective equipment will be supplied and must be worn. Inform site management immediately if you feel unwell while using any substance. A suitable COSHH assessment should be carried out before use and communicated to users. Where possible, substances to be used at work should be kept in the marked / labelled containers provided:- WORK SAFELY

Personal Protective Equipment Safety helmet, safety footwear and high visibility vest or jacket must be worn at all times. The PPE for each task being undertaken, as identified in the appropriate Risk Assessment, MUST be worn. Any operative not complying with this rule will face disciplinary action. On receiving additional PPE the operative will be required to sign the PPE register. It is the responsibility of each employee to maintain the PPE supplied to them and report any defect to site management. WORK SAFELY

Welfare Facilities & Housekeeping Welfare facilities on site should be kept clean and tidy, this includes canteens, drying rooms, toilets etc. Keep the site tidy and do not leave rubbish or equipment where people can fall over it. Tools and equipment must be stored in a lockable container at the end of each day. Pathways, corridors and work areas should be kept clear. All site litter and rubbish should be disposed of in bins or skips provided. Remember to wash your hands before consuming food. WORK SAFELY

Manual Handling Avoid manual handling when ever possible. If manual handling is necessary then a manual handling assessment should be carried out. There is no safe weight when manual handling. Only lift what you are comfortable with and seek help if required. Always ensure you wear the correct PPE when manual handling, this includes gloves of the correct type to avoid lacerations to the hands. Where possible use mechanical means to avoid manual handling and reduce the risk of injury. WORK SAFELY

Site Vehicles and Plant Do not walk, stand or work near plant or vehicles in an area where there is danger of you being trapped or struck by moving plant. Follow all marked vehicle routes and instructions. Pedestrians must use designated routes only. All these routes will be highlighted on the site traffic management plan. Do not enter the working area of an excavator or crane, and never approach a machine or vehicle from behind, unless the operator has seen you. Only authorised and trained persons may use plant and machines or act as a banksman. Always use seatbelts when they are fitted. Do not reverse unless it is safe to do so and under the control of a banksman. WORK SAFELY

Environmental WORK SAFELY There will be no burning of materials on site at any time and no ‘hot work’ is to be carried out unless a permit is received from site management. Spill kits are available on site. All operatives should make themselves aware of where they are located. Drip trays must be used with static plant. Dust suppression must be used when cutting concrete products. Due to the proximity of existing watercourses or drainage systems all plant etc. is to be regularly inspected to ensure that there are no fuel or oil leaks that could cause contamination of these systems. Report all environmental incidents (spillages, seepages into watercourses etc) to your site management immediately they occur. WORK SAFELY

Accident and Incident Reporting All injuries must be reported to site management immediately and an entry made in the site accident book. Action to be taken in the event of major accidents / incidents is displayed on the site notice board. WORK SAFELY

Emergency Procedures A First Aid kit is held in the site office. Emergency telephone numbers, details of first aiders and location of the emergency assembly point can be found on the site notice board. In the event of a fire emergency, raise the alarm and make your way to the nearest assembly point. An entry must be made in the site accident book following any injury. Make yourself aware of emergency procedures for site detailed on the site notice board. WORK SAFELY

Additional Information Now you should make yourself aware of additional sheets / drawings displayed on the notice board. Names of Site Management. Contract / Brief description / Duration. Additional site specific risks / rules. Location of welfare & fire plan. Traffic Management Plan. Any doubts about above documentation should be discussed with site management. WORK SAFELY

Any questions? REMEMBER: IF YOU ARE UNSURE ABOUT ANYTHING, STOP WORK AND ASK YOUR SUPERVISOR, SITE MANAGEMENT OR CONTACT THE EHS DIRECTOR PLEASE NOW SIGN THE SITE REGISTER TO ACKNOWLEDGE YOUR ATTENDANCE, THANK YOU.