6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.

Slides:



Advertisements
Similar presentations
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Advertisements

Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Overview of Mini-Edit and other Tools Access DB Oracle DB You Need to Send Entries From Your Std To the Registry You Need to Get Back Updated Entries From.
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
1 Lecture 19 Configuration Management Software Engineering.
Status of the PCI Test Stand Hardware status: Three known working PTS’s: 2 at FNAL, 1 at UIUC. Korean group working on one, LBL has one running yet? Adapter.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Integrating EPICS and LabVIEW on Windows using DCOM Freddie Akeroyd ISIS Computing Group.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Test Specifications A Specification System for Multi-Platform Test Suite Configuration, Build, and Execution Greg Cooksey.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
SPI NIGHTLIES Alex Hodgkins. SPI nightlies  Build and test various software projects each night  Provide a nightlies summary page that displays all.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
The Troubleshooting Process. Hardware Maintenance Make sure that the hardware is operating properly.  Check the condition of parts.  Repair or replace.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Microcontrollers, Basics Tips and Tricks with PIC MCUs
USB Project (6th August)
UCSB Hybrid Bonding & Testing
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Hardware Needs (Near Term)
On behalf of the US TOB testing group
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
UCSB Qualification Module Grading
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
FNAL Hybrid Testing Status
US Module Testing Progress Report
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04

Slide 2 With old software things were okay… Opens, shorts, and noisy channels detected Automatic XML uploading Cuts adjustable from configuration files Manual mode ARCS available for hardware troubleshooting Automatic report.txt file uploading to local database (UCSB only)

6/22/04 Slide 3 But pretty ghetto for the most part Hybrids that failed at -20… a mystery; simply swept aside. XML files contain only -Flagged channels-Pedestal -Operator-Noise -Test Script used -Tool ID -Date/Time of test

6/22/04 Slide 4 Even worse… False channel identification for six-chip hybrids (only seen in three cases) TESTWITHPA_val held at 0 regardless of test outcome Only two grades: PASS / FAIL –One or more shorted channels OR five or more noisy OR open channels -> Hybrid fails

6/22/04 Slide 5 Now Underlying DAQ library can be compiled * * Microsoft Visual C or higher required

6/22/04 Slide 6 Latest Teststation version in use at CERN is now operational and modifiable Labview source code can be changed and recompiled into an executable file –Allows UCSB/FNAL specific adjustments such as readout of air/water flow sensor in ACDC –MUX, PLL, DCU, etc. are now accessible through C++/labview interface * *Not possible with code currently in use at UCSB & FNAL; dll source was not available

6/22/04 Slide 7 Features of New Software PLL status check PLL Forcing (If necessary) Drifting Pedestal Check New Hybrid Grading: A/B/Fail XML generation (Not automatic yet) Manual mode disabled

6/22/04 Slide 8 PLL Failure? Take those old hybrids off the shelf Initialization now talks to PLL –Reads bit 0 of PLL Control and Status register 1 1 if PLL is “going” –the norm after reset sequence –PLL operation is controlled by auto calibration circuit 0 if PLL is “not going” –Occurs at -20 C –Requires PLL “forcing”: PLL operation is controlled by I2C interface Hybrid will initialize in cold

6/22/04 Slide 9 PLL comment in report & XML file Slight problem: For some reason pedestal and noise have increased edges with new software. Probably something simple.

6/22/04 Slide 10 Open Vias should be found Final report vi compares the average pedestal for each APV between tests If pedestal drifts, comment will be made in report.txt and XML file

6/22/04 Slide 11 New Grading: Agreement with CERN "TIB_P_4D", "TOB_P_4U".."TOB_S_4D", "TEC_4U" 0-2 noisy or open channels "A" hybrid 3-4 noisy or open channels "B" hybrid 5+ noisy or open channels“Failed” One or more shorted channels*“Failed” "TIB_S_6U".."TID_S_6D", "TOB_P_6U", "TEC_6U", "TEC_6D" 0-3 noisy or open channels "A" hybrid 4-6 noisy or open channels "B" hybrid 7+ noisy or open channels “Failed” One or more shorted channels* “Failed” *New code still allows for only one channel to be flagged as short. A consensus should be made as to what constitutes a short.

6/22/04 Slide 12 XML Generation Bruno Wittmer (teststation architect) is person associated with XML files XML files output by new software should contain everything in old files + * –Comments on PLL & Drifting Pedestal –TESTWITHPA_val indicating grade of hybrid Automatic uploading will be added *Still have not successfully generated XML file with new code

6/22/04 Slide 13 Additions to Code CVS repository at CERN contains all updates CVS tools available in linux * and Windows, making updating easy US can contribute *Documentation:

6/22/04 Slide 14 Equipment One spare peltier in US –Ours has failed due to overheating once ARC boards (Ask Tony) One spare crate at UCSB (belongs to Fermilab/going to Mexico City) NIM modules (1 of each used in pulser) Spare humidity & temperature sensors 2 peltier power supplies No spare chiller (Perhaps one should be purchased)

6/22/04 Slide 15 Documentation & AOB Documentation on ARCS, ACDC, XML files, etc. will be collected, organized, and posted on web Side by side updating of code at UCSB and Fermilab