M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/2008 1 Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
MOM Report. Shield Wall – Gone Before During After 2.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
CMPB Alain Blondel 14 April STATUS OF MICE.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: -
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Timing and synchronisation J. Jones, A. Moss and E.W. Snedden April/May 2015.
MICE Target Report Video Conference 29/11/07
UITF Conduct of Operations Review
Presentation transcript:

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets Dry Run, ISIS Scheduling Meeting and other little things m.apollonio – MICE Operation Manager

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ AIMS - verify functionality of D1 – D2 magnets after resistor change (in view of the incoming run) - establish working currents - check water (after leak fixed) - measure magnetic field (check polarity) - Q4-6 to be tested - D1-2 soak test - Q1 soak test OPERATIONS 25/3 15:00  18:30 - temperature probes on D1 (flow+return pipes), run for ~2hrs - continuous monitoring (IR laser gun) - Hall probe measurements of the field - quick check of D2 (similar procedure)  discover B flip (cables inverted during some tests) -found instability both in D1 and D2 PS (oscillation) after 250 A (D1) and 100 A (D2) - MH and GC sent oscilloscope data to Danfysik, they cannot reproduce the oscillation but suggested some modifications 27/3 … so far - MH applied suggested modifications on D1 PS, we switch on as long as vacuum pipe ready - plan to test the other magnets … tonight 25/3 27/3 … and check polarity

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ RESULTS & PLANS - D1: max current 250 A (instead of 300). PS reaches a resonance instability - D2: max current 100 A (instead of 200). Ditto. - water: OK - For the time being be run at the above current (stable + safe) - Q1 to be soak-tested - Q4-6 ditto - Vacuum pipe being pumped, then leak test

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Machine Physics Mar-13-Thu Mar-14-Fri BM test  operate TGT + signal to synch. BM+ICmon

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ ISIS Schedule meetings – Agenda for MP [C.R.] - The agenda for the machine physics period has now been agreed. MICE shifts: - MICE has a short ~ 1-2 hour shift on Saturday evening 29th March (precise time TBC). It is quite possible that ISIS will not be running by this time. - MICE has two more shifts on Wednesday 2nd April from pm until on 3rd April, and Friday 4th April from pm until on 5th April. - I expect the machine will not be used between ~midnight and during the rest of the week. MICE Operations: - We agree to close the target gate valve during the user run - We agree to close the target gate valve until a radiation survey is made in the MICE hall with the synchrotron running. ISIS startup: - Main magnet will turn on at 8 pm on Thursday 27th March, after which time there will be restricted access to the synchrotron room. - There will be a vibration check ~ 8 am Friday morning; the ion source will be switched on; and there will be 1-2 hrs of testing in the injection linac. - Synchrotron beam will come on ASAP after this. Typically I would guess the DSA will be available until around noon on Friday, although it depends on how things go in the synchrotron. Regards, Chris PLANS - Q7-9 meant to be tested when????

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Target Today … [D. Findlay] Marco, Ken, Andy, I've been to look at the optical window underneath the MICE target. If you put a mirror underneath the port then shine a torch obliquely on the window (not on the mirror), you can clearly see dust on the interior surface of the window. The dust is not on the exterior surface — I cleaned the exterior surface of the window with alcohol and the dust was still there. But clearly you should go and look for yourselves. Sunil has seen it this morning as well. Although we're always careful about cleaning vacuum items before they go on to the machine, we can't be absolutely sure, I suppose, that the dust wasn't there to begin with and is therefore unrelated to the target operation — and after all, it's quite inconsistent with the absence of dust after ~1 million activations at Sheffield — but I do think it means we have to go very carefully from now on. Perhaps, in the circumstances, we should pull back the further dips we agreed yesterday to 5000, but we should certainly try and take a photo of the dust now with a flash camera and compare it with a similar photo after another 5000 dips. David

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ ISIS Vault

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ MICE Hall & DSA

m. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ / 3 BEAMLINE - D1 & D2 should be ON - Q1 as above - Q4-6 ? BEAM MONITORS - Fermilab BM 1 – 2 - IC Monitors (BC ) - GVA Monitor 2/4 & 4/4 DETECTORS - CKOV 1-2 connected (signal + HV) IC 2 + GVA1