MOM report Mico Meeting 8/3/2010. DS is down: – beamline highly penalised  all detectors suffer – calibration at low rate only – problem is too high.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
March 24th 2010MICE CM26 - Riverside1 MOM Report m. apollonio – Imperial College.
Important concepts in software engineering The tools to make it easy to apply common sense!
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
November 4th 2009MICE CM25 - RAL1 Commissioning Needs – MICO83 m. apollonio  g. cecchet.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
The USB Charging Station (TUCS) Basheer and Connor’s Make Project.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
BY: JOE MARTIN AND MOODY Pronoun Reference. Pronouns Pronouns are substitute for nouns. Short hand  Instead of saying the object or the person’s name.
4 CAPS PROJECTS By: Lev Kavs. What I have done so far  Figured out what environment I will be using(Eclipse)  Set up my environment (3x)  Fixed missing.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
The Hands of Time The long hand is the minute hand.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Update on STAR AGS/RHIC Time Mtg February 18, 2014 Bill Christie Summary: We started looking for collisions Thursday morning (2/13/14). Determined the.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Yeah but.. What do I do? Software Leadership Dan Fleck 2007.
Calorimeter Meeting 22 October 02 Stephanie Beauceron LPNHE - Paris 1 Attempts on: Response dependence on temperature Stephanie Beauceron LPNHE - Paris.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Unit Four Key to Study & Practice Unit Four Key to Study & Practice.
09/05/2006Project Status Report1 Nova DAQ Software Development Project Status Update for 09/05/2006 Gerald Guglielmo (CD/CEPA/OAA)
109 Wardens Survey – 16/17 Season End of Season Get Together –
CPass0/CPass1 on LHC12d/c Updated at 08:45 on 02/08
Week coordinator report - C. Marchand
Call to Fix Dell Printer Error Code
Optimizing PToF timing and averaging and saving
Presentation transcript:

MOM report Mico Meeting 8/3/2010

DS is down: – beamline highly penalised  all detectors suffer – calibration at low rate only – problem is too high N2 contamination causing blockage when cooling – 3 months have passed: not acceptable TGT is skipping counts (1 out of 2?) – not clear the reason why – “solution” : reducing the tgt dipping rate seems to cure the problem (pay in term of statistics) – not acceptable Documentation Check – After some changes occurred in the last month we need it! – There has been some change in DAQ  Doc updated – There is some little change in OLMon  Linda promised to update Docs – LumiMon have no documentation – We can survive with it BUT We wish to operate a detector, test it, take data More “dramatically”: we could need to switch off a detector cause is catching fire and we have no idea how to do it... LogBook – We had a stop last Friday which lasted >24h. – Yagmur fixed it but it took some time between getting aware of it (time zone lag) and actually doing it – This is a “temporary solution” since October. I got a mail from B. Martlew and Daresbury is not responsible anymore. – Do we accept to leave it like this? Slew Rate Control for PS Units & Flow Meters – Waiting for new flow-meters to substitute old faulty flowmeters – Danfysik promised to give us the SW for SRC for free – Who’s going to install this SW and make it work?

past (<6/3/2010) We had two short runs – Monday 1/3: 1000 pulses Discovered temp. Anomaly in BPM-Large  switched off (wait for A. Bross coming this week) From OLMon discovered half TOF0 channels off  put them back ON with minicom Would be great to have it into EPICS and be advised some channels are OFF. Pierrick is working on it. Not clear the reason why they went OFF – Friday 5/3: 1000 pulses Gate set back to 3.2 ms (it was 6 ms) TGT missing beats investigated. Reason for it unclear. P. Smith believes DAQ problem... run at 1 pulse / 5s

Plan (continuously revised) accommodatin g calibration runs for TOF0,1,2 & KL Shift (e,P) Matrix measurement When DS back on track