Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.

Slides:



Advertisements
Similar presentations
WORK PROGRESS OF KERALA TOWNS UPTO JANUARY Towns Scheme Sanctioned on 20 th Nov 2002.
Advertisements

Solar PV system - financial assistance and incentives
Sistan & Balouchestan Electric Power Distribution Company
Pakistan Services Roadmap ~ Implementation Priorities.
Dairy Entrepreneurship Development Scheme (DEDS).
Scheme of 1% Interest Subvention for Housing Loans upto Rs. 15 Lakh.
Implementing the SET-plan proposed Energy Efficiency Directive The proposed Directive establishes a common framework for promoting energy efficiency in.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
Donors’ Conference on Sustainable Energy for Kosovo
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Inita Paulovica Deputy Resident Representative Turkmenistan.
Centrally Sponsored Scheme for Integrated Development of Small Ruminants and Rabbits 1.
Increased Role of Finance Professionals in Power Sector – 12 th Plan & beyond Er. A. K. Bohra, Director, NESCO, WESCO, SOUTHCO and CEO, Central Services.
Mid Day Meal Scheme 1 Ministry of HRD Government of India PAB-MDM Meeting – Dadra & Nagar Haveli On
A Bridge to Universal Energy Access
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
National Mental Health Programme. Govt of India integrated mental health with other health services at rural level. It is being implemented since 1982.
EXPANDED PUBLIC WORKS PROGRAMMES INCENTIVE GRANT.
Indira Gandhi Matritava Sahyog Yojana (IGMSY) 28 th October, 2010 Ministry of Women & Child Development Government of India.
1 R-APDRP Part -A Karnataka June 2015.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Macro Implications of Micro-Participation: Participatory Management of Electricity Distribution in Eastern India Ashwini K Swain IPPG.
APDRP during 10 th Plan Programme launched in for implementation during X Plan with following objectives: Reduction of AT&C losses Reduce outages.
Commissioner, Indore Municipal Corporation
Copyright 2010, The World Bank Group. All Rights Reserved. Managing resources Finance – People – Knowledge Part 1 Strengthening Statistics Produced in.
India Smart Grid Summit - Towards Sustainable Energy Solution- Presented by: Pawan Kumar Agrawal Executive Director & Regional Business Leader, Infrastructure.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
0 We Create Possibility of a Better Tomorrow… An initiative of Ministry of Power Government of India Nodal Agency Power Finance Corporation Ltd. Restructured.
We create possibilities of a better tomorrow Power Finance Corporation Ltd. 23 rd December 2011 Noida, UP Restructured APDRP By - V K Shah Executive Director,
PFMRP Phase IV Brief Overview  PEFA, other diagnostic reports along with the CAG and PAC reports provided the frame of reference for development of PHASE.
A project implemented by the HTSPE consortium This project is funded by the European Union SECURITY AND CITIZENS SECURITY AND CITIZENSHIP CONSUMER
DIVISION OF REVENUE BILL VOTE 16: HIGHER EDUCATION AND TRAINING Presentation to Standing Committee on Appropriations 26 February 2010.
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
NATIONAL STUDENT FINANCIAL AID SCHEME NSFAS was established in 1999 as a public entity by an act of Parliament to provide for the granting of loans and.
ELECTRICITY LOSSES IN DISTRIBUTION COMPANIES IN KYRGYZSTAN NIKOLAY KRAVTSOV NGO "USTIN" KYRGYZ REPUBLIC BISHKEK, SEPTEMBER, 2011.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Enhancing Market Integrity Taxation 17 May 2006MENA/OECD Investment Programme Cairo, Egypt.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA MARCH-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Indian Power Sector Financing the Growth. Mission  Power for all by 2012 National Goal is to provide reliable, affordable and quality power for all by.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014(As on ) RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
Review, Planning & Monitoring meeting
The New Funding Formula for Higher Education Presentation to the Portfolio Committee on Education, Cape Town, Tuesday 24 August 2004.
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
COMMERCIAL BANKS & ECONOMIC DEVELOPMENT. Economic Development may be defined as a process whereby an economy’s National Income is carried on from a lower.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
2013/14 Annual Report Briefing for the Portfolio Committee On Higher Education and Training 5 November 2014.
Karnataka Public Financial Management and Accountability Study Launch Presentation September 14, 2004.
"Learning and achievements of SWA Global platform and its relevance to achieving Hygiene and Sanitation Development in India" India WASH Summit 17 th February.
Treasury of the Republic of Kazakhstan
Donor Coordination Process
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
PROGRESS REPORT ON THE SABC
2018 Impact Stories.
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA
Select Committee on Finance (SCoF) National Treasury 10 October 2007
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Africa Centers of Excellence Project Financial Management
Poverty Relief Program Presentation to. Portfolio Committee on
RAPDRP PART A IN KARNATAKA 25th Aug 2014
ANNUAL WORK PLAN & BUDGET ANDAMAN AND NICOBAR ADMINISTRATION
Overview of Energy efficiency sector
Presentation transcript:

Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of the programme shall be on establishment of base line data and fixation of accountability, and reduction of AT&C losses through strengthening & up-gradation of Sub-Transmission and Distribution network and adoption of Information Technology.  Project area shall be towns and cities with population of more than 30,000 (10,000 incase of special category states). Rural areas with heavy loads requiring feeder segregation may also be included in the project areas.  Projects under the scheme shall be taken up in Two Parts.  Part-A shall include the projects for establishment of baseline data and IT applications for energy accounting/auditing & IT based consumer service centers.  Part-B shall include regular distribution strengthening projects.

Proposed APDRP during 11 th Plan PART A (Base-line Data System): Automatic Meter Reading(AMR) on Distribution Transformers and Feeders. IT for integrating Meter reading, Billing & Collection, Energy accounting & auditing and Management Information System (MIS). GIS Mapping of the entire distribution network. Automatic Data Logging for all Distribution Transformers and Feeders. Supervisory Control And Data Acquisition (SCADA) system in big towns / cities. Establishment of IT enabled consumer service centers for redressal of consumer grievances # System Requirement Specification (SRS) Template for above under finalisation at MoP to be used by the State power utilities.

Proposed APDRP during 11 th Plan PART B (Distribution strengthening projects) : Renovation, modernization and strengthening of 11 kV level Substations, Transformers/Transformer Centers. Re-conductoring of lines at 11kv level and below. Load Bifurcation, Load Balancing. Aerial Bunched Conductors in thickly populated areas. HVDS (11kv) Installation of capacitor banks and mobile service centers etc. In exceptional cases, where sub-transmission system is weak, strengthening at 33 kV or 66 kV levels also to be considered.

Proposed APDRP during 11 th Plan  Initially 100% funds for Part A and 25% funds for Part B projects shall be provided through loan from the Govt. of India. For special category States, GOI loan for Part B projects will be 90%. The balance funds for Part B projects shall be raised from financial institutions..  The entire amount of loan for Part-A projects shall be converted into grant once the establishment of the required Base-line data system is achieved and verified by an independent agency.  Up-to 50% (90% for special category States) loan of Part-B projects shall be converted into grant in five equal tranches on achieving the 15% AT&C loss in the project area on a sustainable basis for a period of five years.

Proposed APDRP during 11 th Plan  If the utility fails to achieve or sustain the 15% AT&C loss target in a particular year, that year’s tranche of conversion of loan to grant will be reduced in proportion to the shortfall in achieving 15% AT&C loss target from the starting AT&C loss figure.  An amount equivalent to 2% of the portion converted from loan into grant for Part-B projects is proposed as incentive of utility staff in project areas where AT&C loss levels are brought below 15%.  APDRP Assistance to Private Distribution Companies.  A Steering Committee under Secretary (Power) shall sanction projects and monitor the implementation of the Scheme.  PFC shall be the nodal agency to operationalise the programme.

Proposed APDRP during 11 th Plan Eligibility Criteria for APDRP assistance The States / utilities shall be required to: Constitute the State Electricity Regulatory Commission Achieve the following target of AT&C loss reduction at utility level: Utilities having AT&C loss above 30%: Reduction by 2% per year Utilities having AT&C loss below 30%: Reduction by 1% per year Commit a time frame for introduction of measures for better accountability at all levels in the project area Submit previous year’s AT&C loss figures of identified project area as verified by an independent agency appointed by MoP by 30th June; Devise a suitable incentive scheme for staff in the project area linked to achievements of milestones as laid down in Part B of the scheme.

Preparation at Utility level for the “Restructured APDRP”  Identification of the Project areas i.e. towns having population more than Rural areas with heavy loads requiring feeder segregation may also be included in the project areas.  The ring fencing of the project area to measure energy flow should be initiated at the earliest.  The utilities should be able to measure the inflow and outflow from the project area.  The corresponding revenue collection should also be determined separately.  The energy flow to the project area and corresponding revenue collection should be verifiable by the independent agency appointed by MoP.  Dedicated IT Cell in each utility.  Training of utility staff to handle extensive IT component in re-structured APDRP.