Development of the Wastewater Collection and Treatment System in Szombathely County Town 2003/HU/16/P/PE/021 EXTENSION OF THE SEWER NETWORK IN THE WEST-TOWN.

Slides:



Advertisements
Similar presentations
Project Development at BKK Centre for Budapest Transport Gergely Horn Head of division BKK Centre for Budapest Transport
Advertisements

Bulgaria’s strategic road infrastructure challenges.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Development of Ventspils District Heating System in Latvia 2005/LV/16/C/PE/001.
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Reconstruction and Upgrading Works of the Wastewater Treatment.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Renovation Post-industral Area – Nowe Gliwice 2003/ /05.33 Phare 2003 ESC Formerly – Industry, Currently - Knowledge.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
State Fire and Rescue Service of Latvia CBSS Latvian activities.
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
1 E-Procurement in Azerbaijan Republic Challenges and perspectives Elshad Samedzade, PHD & Arzu Aliyev
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
WATER AND WASTEWATER Ltd. Rijeka REPUBLIC OF CROATIA Andrej Marochini, B.Sc.C.E.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Audit of Public Procurement
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
Guidelines for the administration of axis 4 LEADER 17th July 2014, Nitra Mgr. Veronika Korčeková, MA Ministry of Agriculture and Rural Development of the.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee March 22, 2011 Info Item: East Bethel Update Bryce.
ERDF for Education And Science Ministry of Education And Science 1st of October 2013.
Leader+ Steering Committee Meeting 12 March 2008, Brussels / Belgium Capitalisation of cooperation experience László Simon Hungary European Commission.
WATERCYCLE planning and managing water resources Adriatic New Neighbourhood Programme INTERREG/CARDS-PHARE Sisak-Moslavina County Koprivnica, 16 th January.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2014 till March 2015.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Hungarian proposals for the revision of EGTC Regulation and EGTC good practices Presenter: Dr. Erika Szabó Minister of State for Territorial Public Administration.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
EEA grants Conference in Bergen Norway, Bergen, April April 2012 Slovak National Focal Point – the Government Office of the Slovak Republic.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2013 till March 2014.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Brainstorm: Ideas for sustainability after ICT-AGRI-2 Antoinette Jordan, Dr Raymond Kelly TEAGASC ICT-AGRI-2 Governing Board meeting, Athens 5-6 October.
PRIME MINISTRY REPUBLIC OF TURKEY TURKISH STATISTICAL INSTITUTE Foreign Relations Department Projects Group TurkStat Meeting of the Policy Group on Statistical.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
Sustainable public transport – electric transport development project for the capital.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
Galati Municipality – project status - PCT meeting, Enns, 6-8 March
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
Non-profit Business Support Centres in Hajdú-Bihar and Bihor counties: Development of operation an cooperation facilities HURO/0802/108_AF Experiences.
Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.
Supply Chain Management of Second Line Drugs: Russian Example Dr Vadim V. Testov Central TB Research Institute, Moscow, the Russian Federation.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2015 till March 2016.
Monitoring Visit to NatRisk Project
Prof. dr. Giedrius Vanagas
EU Funds – Fraud and Fraud Prevention Tools
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
Water projects under The Cohesion Fund.
COHESION FUND MONITORING COMMITTEE
ESSnet on Linked Open Statistics
Dr. Katja Šnuderl, Contract manager
2015 January February March April May June July August September
Presentation transcript:

Development of the Wastewater Collection and Treatment System in Szombathely County Town 2003/HU/16/P/PE/021 EXTENSION OF THE SEWER NETWORK IN THE WEST-TOWN

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town Signing the Financing Memorandum, tasks of the contracting Tasks of the Project Implementation The Public Procurement Procedure and its phases Implementation Financial implementation Monitoring – checking – evaluation Completion of the Project Implementation of the Project

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town Preparation Works of the Development program financed by the Cohesion Found has been completed on 4th February 05. Predictable Date of Completion was 31st December 07 for the entire Project The total cost of Euro have been covered in 60% by the Cohesion Found, in 30 % by State Budget and in 10 % by the local Municipalities TENDERING

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town PUBLIC PROCUREMENT PROCEDURES PROCEDURES TARGETING WORKS OF IMPLEMENTATION: Development of the Sewage and Rainwater Collecting System in western part of Szombathely Upgrading the technology of Sewage Treatment Plant I. Upgrading of the mechanical pre-treatment system and the Sewage Treatment system II. Construction of new Composting Plant PROCEDURES TARGETING SERVICES: Expert’s Services of tasks of „Engineer” and Technical Surveyor Providing Services of Information and Public Relations connecting to the Project Expert’s Services for the Project Implementation Unit

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town On 28th November 03 the Financing Memorandum of the Project has been signed by the European Comission On 11th February 04 the Financing Memorandum of the Project has been signed by the Republic of Hungary On 28th May 04 a Consortium Agreement has been signed by the Municipalities involved into the Development for the implementation of the Project. In this Agreement Szombathely County Town has been nominated as a Gestor. The agreement bonds the VASIVÍZ ZRt for cooperation on the course of implementation. The preparation of the Project has been completed on 4th February 05 by signing the Financing Memorandum made between Szombathely County Town and the Ministry of Environment and Water The first Service Contract of the Project has been signed on 22nd September 05 to provide Expert’s Services by the Canor International Ltd. for the tasks of „Engineer” Implementation of the Project

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town On the 9th December 05 the winner of the Public Procurement Procedure for PR Services, namely the Medius Iroda signs the Service Contract with the Beneficiary On 9th March 06 the TECHNOPLUS Környezetvédelmi Technológiai Fejlesztő Kft. contracts for Expert’s Services for the Project Implementation Unit working in the Mayor’s Office of Szombathely Picture- Ákos Senviczki : „Cleaning the Sewer”

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town On 9th March 06 the Contact for the Extension of the Sewage Collecting System in the west-town has been signed by the „Borostyánkő Konzorcium-2005” (Swietelsky Építő Kft. és a TEERAG-ASDAG AG Niederlassung Burgenland ).

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town EXTENSION OF THE SEWER NETWORK IN THE WEST-TOWN

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town On 6th April 06 with the participation of Róbert Rakics, the under secretary of the Ministry of Environment and Water, furhtermore, dr. György Ipkovich, Mayor, the solemn act of locating the foundation-tube in frame of EXTENSION WORKS OF THE SEWER NETWORK IN THE WEST-TOWN has been done at Szombathely, in the crossroads of Szent Gellért and Körmendi streets On 19th April 06 there was a Public Day held in the salon of the Trade School and Hostel of Horticulture and Land Survey. Guest’s inquiry have been satisfied with informations given by the Mayor, Tamás Horváth Site Manager ("BOROSTYÁNKŐ-2005" Konzorcium ) and Róber Krenner Head of Services of VASIVÍZ ZRt. On 6th September 06, in frame of Press Conference, in the Wedding Saloon of the City Hall dr. György Ipkovich, Mayor, András Csermely vice- Mayor, József Wagner the Head of Vasivíz ZRt., furhermore, János Takács, the Manager in charge of the "BOROSTYÁNKŐ-2005" Konzorcium – as the Contractor responsible for the running sewer-constructing Works, have informed Representatives of the local and national Media about the progress of the Project Main milestones of the Project

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town On 9th January 07 the No. 1. Amendment of the Contract „Extension of the Sewer network in west-town” has been signed. The amended Date of Completion is 18th April 07. On 12th April at 17, there was a Public Day in the first floor Conference Room, held by the Municipality of Szombathely County Town about the progress achieved in project of Development of the Wastewater Collection and Treatment System in Szombathely County Town and about the questions taking effect to the Public On 18th April 07 in the frame of „Extension of the Sewer network in west- town” Contract, the implemented facilities have been taken over On 30th May 07 sharply at 10 at the pumping station (located in the crossroads of Körmendi str. and Szent Gellért street) the celebration of taking over the facilities connecting to the Extension Works of the Sewer network in west-town was held in the presence of Representatives of the Contractor (Borostyánkő 2005 Konzorcium - Swietelsky Kft, Teerag Asdag Ag) the Representatives of the Consortium of Settlements established for the implementation of the Project, furthermore, in the presence of Representatives of the Operator Main milestones of the Project

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town Progress of the Works 1st July 06 – 31st March 07 The netto value of the Contract signed with the Borostyánkő 2005 Konzorcium was ,- EUR. Construction of the Main sewer and the sewers was completed on 31st December 06. By this time the pumping station and the underpass have been completed as well. The Taking over process has been started on 22nd March 07.

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town 1st April 07 – 30th June 07 Works of „Extension of the Sewer network in west-town” have been completed. The Taking over process was successful. Certification of Taking Over has been released by the Engineer on 18th April 07. Application for the Amendment of Water Permit has been submitted to the Authorities. The procedure of Taking Over was on 30th May 07.

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town Resulst achieved With the aim of the project a new main sewer, a pumping station and cca 6,5 km of sewer reconstruction have been implemented in the town Main sewer has been built at the Körmendi street at the lenght of approximately 1 km (1.145 m).. Streets affected by the sewer reconstruction: Győrffy, Táncsics M., Avar, Somlay A., Szent László király, Gagarin, before the Monument, Bartók B. krt. until Kenderesi str., Arany J., Tompa M., Árpád, Szinyei M. P., Szabadságharcos and Katona J. (altogether: 6503 m lenght) As the result of the Project, in rainy weather the flood does not jeopardises anymore the plots located in the west-town Picture- Borbála Pajor : „Make your choice!”

2003/HU/16/P/PE/021 – Extension of the Sewer network in west-town Source: Thank you for your kind attention!