7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.

Similar presentations


Presentation on theme: "7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic."— Presentation transcript:

1 7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic of Bulgaria 1.Construction of Wastewater Collection and treatment located in Pazardjik Republic of Bulgaria 2. Construction of Sewerage network system, Reconstruction of Water supply system, WW PS and Pressure pipe line at the Ivaylo District of the town of Pazardjik 3. Construction of Protection dike - closed

2 1.Works Contract Construction of Wastewater Collection and treatment located in Pazardjik, Bulgaria Commencement Date:20 th September, 2004 Completion Date: 31 th August 2008 Physical Execution:100 % Financial Execution:100 % Performance Certificate: 22 th December 2009

3 1. Works Contract Construction of Wastewater Collection and treatment located in Pazardjik, Bulgaria

4

5 Service Contract Construction of Wastewater Collection and treatment located in Pazardjik, Bulgaria The Contract is closed Financial Execution:100 %

6 2. Works Contract Construction of Sewerage network system, Reconstruction of Water supply system, WW PS and Pressure pipe line at the Ivaylo District of the town of Pazardjik Commencement Date:26 th October 2009 Completion Date:26 th February 2011 Physical Execution:100 % Financial Execution:100 % Somme additional works with total cost about 220 k€ are to be awarded to the Works contractor In order to be achieved fully the Works Contract’s aim. The financial recourses from the national budget are under ensuring.

7 2. Works Contract Construction of Sewerage network system, Reconstruction of Water supply system, WW PS and Pressure pipe line at the Ivaylo District of the town of Pazardjik

8

9 Service Contract Construction of Sewerage network system, Reconstruction of Water supply system, WW PS and Pressure pipe line at the Ivaylo District of the town of Pazardjik Commencement Date:30 th September 2009 Completion Date:30 th March 2011 Financial Execution:90 %

10 3. Works Contract Construction of Protection dike - closed

11 Compliance with Article 8 of the Financing Memorandum Art. 8.5 –The final payment shall be subject to the presentation by the final beneficiary of a specific operation and maintenance programme under terms acceptable by the commission. The mentioned programme has been sent to EC at the end of 2009.

12 Thank you for your attention!