J. B. Hastings LCLS User October 12-13, 2004 LCLS User Program J. Hastings SLAC/SSRL.

Slides:



Advertisements
Similar presentations
Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Advertisements

FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
J. B. Hastings LCLS FAC October 29, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description Project.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
LCLS – the Initial Scientific Teams and Thrusts AMO scienceLou DimauroNora Berrah Coherent scattering of Brian StephensonKarl Ludwig nanoscale fluctuationsGerhard.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur X-ray April 7, 2005 LCLS Detector Development Plans John Arthur.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
John N. Galayda LCLS Facility Advisory Committee 7 April 2005 Linac Coherent Light Source Project Update Incident Budget Schedule.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
John N. Galayda LCLS Facility Advisory 12 October 2004 Linac Coherent Light Source Project Update Recent reviews Budget,
The Linac Coherent Light Source Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
April 1, 2014 Photon Science Research at SLAC Physics and Applied Physics Graduate Student Open House.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
1 BROOKHAVEN SCIENCE ASSOCIATES User Access and Beamline Development John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
Basic Energy Sciences Atomic, Molecular & Optical Sciences Fundamental Interactions Team Chemical Sciences, Geosciences, and Biosciences Division LCLS.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Basic Energy Sciences Next Generation Photon Sources for Grand Challenges in Science and Energy George Crabtree Marc Kastner Co-Chairs, New Era Subcommittee.
The SPARX FEL Project a source for coherent radiation production in the soft X-ray energy range.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
J. B. Hastings LUSI DOE Review July 23, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description.
Sébastien Boutet LUSI DOE Review July 23, 2007 CXI (WBS 1.3) 1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System Specifications.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
LCLS User Access Policy
MSc-Student Activities at the European XFEL
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
Atomic, Molecular, and Optical Sciences
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
LCLS Overview John N. Galayda, SLAC April 23, 2002
LCLS User Access Policy
Synchrotron Science and User Program at SSRL A Brief Overview for the Context of LCLS Presented to the DOE Review of the LCLS Project Keith O. Hodgson,
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Experimental Program and Endstations System (WBS ) J
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Project Transition to Operations 14 May 2008
Preliminary Project Execution Plan
MIE Physics Requirements
X-Ray Endstation Design & Management/Commissioning
LUSI Status and Early Science
X-Ray Endstation Systems (XES) 2006 Schedule
Welcome and Photon Science at SLAC – LCLS – SSRL – Science Initiatives
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
Presentation transcript:

J. B. Hastings LCLS User October 12-13, 2004 LCLS User Program J. Hastings SLAC/SSRL

J. B. Hastings LCLS User October 12-13, 2004 Outline The process Letters of Intent/review DOE Major Item of Equipment The results First experiments-SAC Response Theme area organization The challenges Schedule Detectors

J. B. Hastings LCLS User October 12-13, 2004 Letters of Intent Types Category A: Complete Endstation Category B: Specific Science Goals Category C: Technical Innovations Response Total of 32 received 256 Independent investigators 91 Institutions

J. B. Hastings LCLS User October 12-13, MarCall for letters of intent to be distributed widely 21-JunLetters of Intent due 8-9 JulySAC: review LOIs, review proposal guidelines 1-Aug LCLS/SSRL inform selected teams, move to proposal stage FebFull proposals due to LCLS/SSRL 15-FebSAC review of full proposals 1-MarProposals approved by LCLS/SAC 1-AprProposals submitted to funding sources 1-OctPlanned LCLS construction start OctPlanned LCLS operations start User Program Schedule Letters of Intent (as of Aug 04)

J. B. Hastings LCLS User October 12-13, MarCall for letters of intent to be distributed widely 21-JunLetters of Intent due 8-9 JulySAC: review LOIs, review proposal guidelines 1-Aug LCLS/SSRL inform selected teams, move to proposal stage 15-DecCD-0 for MIE 2005CD-1 for MIE; CD-2 and CD-3 for parts of MIE 1-OctPlanned LCLS construction start 1-OctPhase start of MIE OctAdditional starts for MIE OctPlanned LCLS operations start User Program Schedule Letters of Intent

J. B. Hastings LCLS User October 12-13, 2004 LCLS SAC Roger Falcone - UC Berkeley, USA, Chairperson Nora Berrah - Western Michigan University, USA Phil Bucksbaum - University of Michigan, USA Robert L. Byer - Stanford University, USA Hans Frauenfelder - LANL, USA Wayne Hendrickson - Columbia University, USA Stephen R. Leone - UC Berkeley, USA Margaret Murnane - University of Colorado- Boulder, USA Jochen R. Schneider - HASYLAB, Germany Francesco Sette - ESRF, France Sunil Sinha - UCSD, USA Dietrich von der Linde - University of Essen, Germany

J. B. Hastings LCLS User October 12-13, 2004 LCLS SAC Response Draft Final Report Identified 5 Thrust Areas Atomic Molecular and Optical Physics Pump/probe high-energy-density (HED) physics Nano-particle and single molecule (non-periodic) imaging Pump/probe diffraction dynamics Coherent scattering at the nanoscale

J. B. Hastings LCLS User October 12-13, 2004 LCLS SAC Response (cont’d) All LoI’s were reviewed and fit into thrust areas Supported Short pulse (beyond baseline) R&D Will enable new science LCLS efforts in AMO and detector development (endstation systems) important for early turn on

J. B. Hastings LCLS User October 12-13, 2004 Femtochemistry Pump/probe diffraction dynamics Nanoscale Dynamics Coherent scattering at the in Condensed matter nanoscale Atomic Physics Atomic Molecular and Optical Physics Plasma and Warm Dense Matter Pump/probe high-energy- density (HED) physics Structural Studies on Single Nano-particle and single Particles and Biomolecules molecule (non-periodic) imaging FEL Science/Technology Program developed by international team of scientists working with accelerator and laser physics communities SLAC Report 611 First Experiments-SAC Response

J. B. Hastings LCLS User October 12-13, 2004 Thrust areas: SSRL/LCLS Contact (1) Coherent scattering at G.B. Stephenson* S. Brennan the nanoscale K. Ludwig (2) Pump/probe diffraction K. Gaffney* A. Lindenberg dynamics D. Reis J. Larsson (3) High energy density R. Lee* J. B. Hastings (HED) physics P. Heimann (4) Nano-particle/single J. Hajdu* J. Arthur molecule(non-periodic) J. Miao imaging H. Chapman (5) Atomic, molecular, L. DiMauro* J. B. Hastings and optical science N. Berrah * Team leader

J. B. Hastings LCLS User October 12-13, 2004 Funded thru BES Science community develops the science case, provides the specifications The project engineering and management is the responsibility of SLAC/SSRL Full rigor of DoE review is in place Insures compatibility, common design, ease of maintenance Major Item of Equipment

J. B. Hastings LCLS User October 12-13, 2004 Permits common CD-0, CD-1 for all instruments CD-0 Dec 2004 ?? CD-1 April 2005 ? Instruments to be commissioned sequentially LCLS goal is initial phase of 2-3 complete instruments by CD-4

J. B. Hastings LCLS User October 12-13, 2004 Challenges: Schedule Now LCLS CD-4 LCLS Commissioning Start Earliest MIE Construction Start

J. B. Hastings LCLS User October 12-13, 2004 Detectors 2 dim. X-ray detectors 120 hz read out Low noise, << 1 photon Reasonable dynamic range ~ 500 x 500 pixels, ~ 100 x 100 µm pixel size Used for the following themes: AMOS cluster experiments HEDS shock experiments Pump-probe dynamics Nano and single particle imaging

J. B. Hastings LCLS User October 12-13, 2004 Time schedule By Oct. 15, 2004 Specifications to LoI groups Dec. 15, 2004 Detailed proposals due addressing: R&D Construction Integration (software and hardware) Jan-Feb 2005 Review by external advisory committee

J. B. Hastings LCLS User October 12-13, 2004 Detector Advisory Committee Advise both LCLS and the MIE on detector development Meets on a regular basis to evaluate progress on R&D and construction Membership Dr. Gareth Derbyshire, RALChair Prof. Y. Amemiya, Univ. of Tokyo Prof. Dr. A. Walenta, U. of Siegen Prof. Dr. L. Strüder, MPG Dr. E. Eikenberry, PSI

J. B. Hastings LCLS User October 12-13, 2004 Summary Strong science drivers We recognize that the endstations and source intimately coupled A lot of work and a short time to meet the LCLS CD-4 date with a 2-3 instruments ready to take data in a first phase