Concept Selection Matrix Compressor Mounting Method Concepts Bolt directly to floorPlace on floor, no bolts Place on top of concrete slab and rubber mat.

Slides:



Advertisements
Similar presentations
Acoustics 5 Materials Rino D.A. Fernandez, uap Class Instructor.
Advertisements

Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
DISPLACEMENT TRANSMISSIBILITY IN BASE EXCITATION
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Tom’s Tips for Silencing Your Model “A” 2014 Missouri Valley Region Membership Meet.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
FSO Installation Free Space Optics The Practical Aspect.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Earthquakes in San Francisco, California - Structural Engineering Solutions -
Chapter 33 Foundation Systems.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
  Prof. Dr. Mikayel Melkumyan President of the Armenian Association for Earthquake Engineering Senior Research Associate / Principal Investigator.
Team members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
Building Types.
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
Chapter 14 Notes. Parquet – Mastic – Resilient (Flooring)– Joist – Terrazzo–
2001 Winter Presentation. Site Location Site View.
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009.
Solar Power EDSGN 100 Sec. 13 Design Team 1 Kyle Feaster Alex Shivetts Kait Levin.
ASSIGNMENT Begin on page 197 “The Foundation”.
Group16: Assembly Fixture Design and Fabrication for 6 Pole Motor Magnets and their Retaining Parts Group Members: Jeffrey Morton John Pilgrim Marcus Rothberg.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
An Introduction to Pandrol’s PANGUARD System
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Design for Elderly and Disabled Environments: Making Homes More Comfortable and Accessible Windows Part 3 of 10.
STRUCTURE-BORNE SOUND INTRODUCTION IMPACT ISOLATION IMPACT ISOLATION CLASS (IIC) IIC IMPROVEMENTS IMPACT NOISES DESCRIPTION:  IMPACT NOISES ARE ERRATIC.
Kindergarten: Unit 08 Lesson 01 Partial 100s Chart How to create a Partial 100s Chart from the Five Frame Mat C.
Abdulaziz al- zahrani. Difference Between Split AC and Window AC.
Remove the seats from the car, there is no easy way to do this. Flip it up side down so it looks like [1] Both sides are done exactly the same, so.
January 11, 2013UL Vibration Test Apparatus1 Final Design.
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood.
Assignment 1 review. Relative importance Total Volume Material Strength (Yield) Extendable length Torque required Looks appealing33 5 Does not block sink59.
Caretakers House Demolition Decking to STEM and ARTS.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
C - Series Installation Installation of C-Series signs is quick, easy and can be accomplished by anyone with just a little mechanical aptitude. Before.
Safe by Design Safe by Design Operation Maintenance and Repair
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
Chapter 38 Alternative Layout Techniques. Introduction Basic methods for drawing a section with a concrete slab and truss roof –Will not meet needs of.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Floor Systems and Foundation Support
15 Engine Front End Construction Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives After studying.
Types of Door Closers. A door closer is a device that is fixed onto a door, to automatically close the door when it is opened.
Foundation Plan Layout
Macromizer Wheelbase Design EJL
By: Madison Lowery, Heather Davis and Micah Nowling
WHY? HOW? Test Valve Measure Vibrations Contain Valves
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Update of mounting system design
Biblio Summary on Vibration
Foundation Analysis Material options: Considerations:
Objective 6.02 part 1: Recognize components of construction
Know the Signs of a Bad Engine Mount in Your Car.
ActivRAC® 7M Mobilized Storage System
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Tuned Mass Damper Investigation for Apache Struts
BASEPLATES SLIDE SHOW.
INDUSTRIAL / COMMERCIAL Facility For Lease
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Kindergarten: Unit 08 Lesson 01 Partial 100s Chart
Ribbed Pad Isolator Ribbed Pads
Victor Nifo Jason Dyck Steve Micacchi
Neutron guide Shielding Concept
Pneumatic tools IR Range Overview Welcome remarks TBD. 01/12/06.
Presentation transcript:

Concept Selection Matrix Compressor Mounting Method Concepts Bolt directly to floorPlace on floor, no bolts Place on top of concrete slab and rubber mat – no bolts Mount to LORD vibration dampers CriteriaCriteria WeightRatingWeighted ScoreRatingWeighted ScoreRatingWeighted ScoreRatingWeighted Score Dampen vibrations transmitted to floor Clear building structure in basement Secure compressor to floor Easy to install Durability of Unit Noise Total Score Ranking 3421 Continue? NO YES

Shop Floor Shop Floor Compressor Frame LORD Vibration Mounts Mounted to LORD Vibration Bolts Preferred method

Compressor Frame Concrete Slab Concrete Slab Rubber Mat Floor Floor On top of concrete slab, and rubber mat - No bolts

Floor Floor Compressor Frame Bolted directly to floor

Floor Floor Compressor Frame Place directly onto floor – No bolts