Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
Eric Bong LCLS FAC Injector-Linac April 7, 2005 LCLS Injector/Linac Systems Update E. Bong LCLS FAC April 7, 2005 LCLS.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
C.Limborg-Deprey LCLS FAC, Oct Oct 27th Injector Physics C.Limborg-Deprey GTL final design Wakefield budget Final.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
CBETA Technical Review
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac LLP Outline LINAC Long Lead Procurements
Linac Physics, Diagnostics, and Commissioning Strategy P
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
E-Beams Systems Manager
LCLS Injector System Overview D. H
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Injector Physics C.Limborg-Deprey Feb.8th 2006
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC October 27, 2005 LCLS

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design Installation Dates/Progress Region Design Diagnostics Gun, Linac & RF

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector and Linac Installation Dates (RF phase:  rf = 0 is at accelerating crest) SLAC linac tunnel research yard Linac-1Aug-Nov2006Linac-2July-Sep2007Linac-3July-Sep2007 BC-1 Aug- Nov 2006BC-2July-Sep2007 LTU Oct 2007 Dec 2007 DL-1Aug-Nov2006 undulator SLAC linac 21-1b21-1d X RF Gun Nov b24-6d25-1a30-8c E-Dump Dec 2007 Feb 2008 Inj Vault Jun-Jul2006 L0a&b rfgun Installation in SLAC linac tunnel only during down-time Linac-X Aug-Nov2006 Linac Down: August – November 2006 July – September 2007

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Installation Drive Laser May 2006 Laser Launch July 2006 Gun Region July 2006 Accel Region June 2006 Heater Region June 2006 Wall Region October 2005 Injection Region Aug-Nov 2006 Spect Region Aug-Nov 2006 Waveguide through wall and up penetration October 2005 Gun installation November 2006 Following Hot Test in Klystron Lab Injector Commissioning Start December 2006

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Region Design Status (2006 Install) Gun RegionIn Process Accelerator RegionIn Process Heater RegionIn Process Wall RegionComplete Insertion RegionIn Process Spectrometer RegionNot Started L1Complete LXComplete BC1Articulation Complete, beamline incomplete Seeking engineering support from other SALC groups

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Vault Integration of region layouts, piping, cable trays, laser transport, waveguide and floor stands. Tray and water install first Cable plant install to precede beamline component install

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Waveguide Design Installation penetration-wall October ’05 Installation Vault & Gallery Spring ’06 Design effort broken into penetration- wall runs, Gallery and Vault runs. Detail drawings complete for penetration and gallery runs 3-D Layout integrated into Injector system assembly Gun and structures fed from Li-20-6, 7 & 8 klystrons, T-Cav fed from Li-20-5d structure exhaust.

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Gun Region Installation July 2006 except gun November 2006 Region PDR October 31 Device reviews November Gun review complete Solenoid on order YAG/OTR optics package design by Klystron engineering Spectrometer bend in-house design Base support integrated with launch optics table support Laser on-axis, not grazing incidence

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Accelerator Region Installation June 2006 Dual feed structure design and details complete and in fabrication Quads on order Solenoid on order L0a and solenoid on common support girder to allow relative alignment in lab prior to install.

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Heater Region Design Beamline segment Between Accelerators and Shielding Wall Installation June 2006 Undulator installation 2007 Transverse structure on hand. Quads on order OTR actuator design complete Bend magnet specification complete ready to order Need optics, chamber and steering coil & support designs

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Wall Region Spans through shielding walls separating Injector Vault form Linac Housing. October 2005 installation includes pipes through walls and stopper. Required for installation in vault during Linac run. Balance of installation August Completed device designs: quadrupole, stopper, wire scanner, OTR actuator and component supports.

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Insertion Region Uses OTR, Wire Scanner & Quad design from Wall Region Installation ’06 Down Layout and interference study in progress

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Spectrometer Region Mechanical Design not started Uses Quadrupoles, BPMs and YAG/OTRs & steering coils from other region designs New Bend, Dump/FC, chambers and supports Installation Aug-Nov 2006 Need additional engineering support matrixed from SLAC

Eric Bong LCLS FAC Injector-Linac October 27, 2005 L1 Region Design Installation ’06 down Detail Drawings Complete except SA- BPM modification Uses existing shortened accelerator sections, injector quadrupoles and BPM bodies

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Install ‘06 Down. XL4 Klystron fabrication complete. Waveguide fabrication starting. Waveguide details and structure support design complete. X-Band System Design (LX)

Eric Bong LCLS FAC Injector-Linac October 27, 2005 BC1 Region Design Beamline segment from X-Band system to structure Li21-2b. Installation – August 2006 Compressor articulation, mangets and chambers on order Compressor diagnostics incomplete Downstream emittance section design incomplete. Uses existing wire scanner, quadrupole, stopper and BPM designs. Collaboration with UCLA on single shot bunch length monitor in place. However, mechanical design for BC1 instance not started.

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Installation October 2005

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector/Linac Diagnostics Wire Scanners mechanical design released, ready to build BPMs Small Aperture BPM on order (delivery 6 weeks late) Large Aperture BPM ready to detail (FDR) SA Mod for L1 need design work Torroids Ready to release RFQ for build to spec Additional requirement for BCS at gun just recieved Profile Monitors Actuator bodies on order, OTR head design complete Optics design starting (Klystron) Need YAG head design

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector/Linac Diagnostics Collimators BC1 movable collimator design started but halted to pursue Injector design Need collimator PRD Stoppers Wall PPS stopper complete Gun Spectrometer FC in design SAB Spectrometer FC need design BC1 stopper use existing Linac design Purchasing Establish multi-year delivery contracts to bulk-purchase diagnostics items

Eric Bong LCLS FAC Injector-Linac October 27, 2005 RF Gun & Solenoid RF Gun design reviews complete in final detail. Fabrication, assembly to solenoid & alignment to complete for August HP testing in Klystron test lab Need design of bulk cooling water system for klystron lab hot test and vault installation

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Dual Feed Structure Design L0a and L0b both dual feed structures Reviews of RF and mechanical designs complete Detail drawings complete and released Testing of existing structures completed Fabrication of dual feed parts starting

Eric Bong LCLS FAC Injector-Linac October 27, 2005 RF Design LLRF preliminary design review held Waveguide coupler design and fabrication complete Construction of the PEPII phase shifter RF chassis is complete, calibration next month. Phase shifter control board fabrication next month. 476MHz master amplifier chassis in process of being tested in the Lab. A 1:1 model of the S-band (2856 MHz) Phase Detector Cavity is being manufactured to start testing in October. The main RF parameters of the phase detector cavity calculated with Superfish program were presented during the "LCLS LLRF Preliminary Design Review"

Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design Injector Design / Diagnostics / Gun & Linac RF Design Conclusion Progress is being made toward completing beamline and component design for 2006 installation supporting January 2007 commissioning but with some risk Additional engineering manpower required for SAB Spectrometer, BC1 Downbeam segment, BC1 Chicane diagnostics and BC1 Single Shot Bunch Length Monitor Vendor delivery delays could be critical Injector Vault cable tray and water installation must be expedited