J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.

Slides:



Advertisements
Similar presentations
Research Opportunities at LCLS September 2011 Joachim Stöhr.
Advertisements

Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LCLS FAC October 29, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description Project.
David Fritz LCLS FAC Meeting Oct. 30, X-ray Pump-Probe Instrument David Fritz Instrument Overview Instrument Layout System.
J. B. Hastings LCLS User October 12-13, 2004 LCLS User Program J. Hastings SLAC/SSRL.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
J. B. Hastings LCLS FAC April 17, 2007 Coherent X-Ray Imaging Coherent Single Particle Imaging (WBS 1.3) J. B. Hastings*
LCLS Studies of Laser Initiated Dynamics Jorgen Larsson, David Reis, Thomas Tschentscher, and Kelly Gaffney provided LUSI management with preliminary Specifications.
Aymeric Robert XCS 11/12/2008 SLAC National Accelerator Laboratory 1 X -ray C orrelation S pectroscopy Instrument Aymeric.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 1 Diagnostics/Common Optics:
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
Sébastien Boutet LCLS FAC June Coherent X-Ray Imaging 1 LUSI Coherent X-ray Imaging Instrument Sébastien Boutet – CXI.
Sébastien Boutet LCLS FAC Meeting Oct 30, 2007 Coherent X-ray Imaging1 Coherent X-ray Imaging Instrument Sébastien Boutet Coherent.
David Fritz XPP June 17, The X-ray Pump-Probe Instrument Instrument Scientist: David Fritz Second Scientist:
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
D. M. Fritz LCLS FAC Meeting April 16, 2007 XPP Instrument X-ray Pump-Probe Instrument D. M. Fritz Pump-probe Experiments System.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
J. B. Hastings LUSI DOE Review July 23, 2007 X-ray Optics 1 X-ray Optics J. B. Hastings Beam definition Attenuators Slits Pulse picker.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Offset Monochromator.
Birth of the X-Ray Laser and a New Era of Science Joachim Stohr
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
David Fritz LUSI DOE Review July 23-24, 2007 XPP (WBS 1.2) Breakout 1 X-ray Pump-Probe (WBS 1.2) David Fritz System Specifications.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
J. B. Hastings LUSI DOE Review July 23, 2007 LUSI Overview 1 LUSI Overview J. B. Hastings Science Opportunities Project Description.
Yiping Feng LUSI DOE Review July 23, 2007 Diagnostics (WBS 1.5)1 Diagnostics (WBS 1.5) Yiping Feng Motivations System Specifications.
Sébastien Boutet LUSI DOE Review July 23, 2007 CXI (WBS 1.3) 1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System Specifications.
Sébastien Boutet LUSI DOE Review July 23, 2007 WBS 1.3 Breakout1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System description.
J. B. Hastings LUSI DOE Review July 23, 2007 X-ray Optics 1 X-ray Optics J. B. Hastings Beam definition Attenuators Slits Pulse picker.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS User Access Policy
Coherent X-ray Imaging Instrument
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
Experimental Facilities Planning
X-ray Pump-Probe (WBS 1.2) David Fritz
LUSI Diagnostics & Common Optics WBS 1.5
LCLS Instrument Development
LCLS Ultrafast Science Instruments
LUSI X-ray Pump-Probe Instrument WBS 1.2
Coherent X-ray Imaging WBS 1.3
X-ray Pump-Probe Instrument
Thomas Fornek Project Manager July 15, 2009
LINAC OPS Budget Review
X-ray Pump-Probe Instrument
Experimental Program and Endstations System (WBS ) J
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
X-Ray Endstation Design & Management/Commissioning
LUSI Status and Early Science
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review Action Item: LUSI Plans Planning assumptions Phase I Phase II Milestones January 2007 Lehman Review Response to Lehman Review Action Item: LUSI Plans Planning assumptions Phase I Phase II Milestones

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI SCOPE Atomic, molecular and optical science (AMOS) Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations (XPCS) Nano-particle and single molecule coherent x-ray imaging High energy density science (HEDS) Aluminum plasma classical plasma dense plasma high den. matter G=1 Density (g/cm -3 ) G =10 G=100 t=0 t=  SLAC Report 611 Letters of Intent  LCLS Scientific Advisory Committee (SAC) review  Defined Thrust Areas

J. B. Hastings LUSI Overview LCLS FAC March 20, SXR Imag Beam Delivery 2SXR Emission, AMOS (LCLS) Beam delivery (SXR P-P) 3XR pump-probe Full instrument 4XPCS Beam Delivery 5CXI Full instrument 6HEDS (Funded by others) 1SXR Imag Beam Delivery 2SXR Emission, AMOS (LCLS) Beam delivery (SXR P-P) 3XR pump-probe Full instrument 4XPCS Beam Delivery 5CXI Full instrument 6HEDS (Funded by others) LCLS LUSI HEDS (NNSA) Offset Monochromator Exp. Chamber Detector Beam Transport Project description (1)

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Project Description (2) SXR Imaging SXR emission X-ray Pump-probe LCLS AMOS XPCS Offset Monochromator X-ray transport tunnel XPCS HEDS (outsideFunding) Coherent X-ray Imaging

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Beam sharing to maximize science

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Offset monochromator Thin transmissive crystal

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Project Description (3) WBS 1.2 Hard X-ray Pump-probe

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Coherent (single molecule) Imaging

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Coherent (single molecule) Imaging

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Project description (4) WBS 1.3 Coherent x-ray imaging

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Project Description (5) WBS 1.4 XPCS Offset Monochromator XPCS Coherent X-ray Imaging

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Hard X-ray Intensity Monitor Compton backscatter from Be foil (up to 10 8 photons) Transmitting ( >98% w/ 100 micron Be) Position information available with use of diode array 5 micron accuracy for commercial fluorescence monitor Positional calibration performed with precision motion (< 2 µm) Compton backscatter from Be foil (up to 10 8 photons) Transmitting ( >98% w/ 100 micron Be) Position information available with use of diode array 5 micron accuracy for commercial fluorescence monitor Positional calibration performed with precision motion (< 2 µm)

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Hartman Wavefront Sensor Measurement made far from focal plane Single shot operation 120 Hz with CCD modification 1.5 nm and 0.15 nm operation with customization Measurement made far from focal plane Single shot operation 120 Hz with CCD modification 1.5 nm and 0.15 nm operation with customization Image obtained from Imagine Optics, Ltd

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 PriorFY2007FY2008FY2009FY2010FY2011FY March 1, 2007 Action Item Planning Assumptions 1) Funding profile 2)Instrument priorities 1)Coherent Imaging including particle injector 2)X-ray pump-probe including sample environments 3)XPCS complete to extent possible within funding 3) Establish a phased approach

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 CXI Phase I instrument located in Hutch 3 (temporary home, shared with XPP) X-ray beam focusingBe lens system for 1 and 2 micron foci Sample chamberSample diagnostics (ion and electron time of flight, visible light), raster stage for supported sample, port for particle injector, detector stage Beam diagnostics Control system DetectorShared use of LCLS 2 dimensional detector Delivered at CD-4a

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 XPP Phase I instrument located in Hutch 3 (permanent home) X-ray beam focusingBe lens system 8 circle diffractometer Laser opticsShare the laser system with the AMOS experiment Beam diagnosticsElectro-optic timing sensing Control system Detectorprototype for the LCLS 2 dimensional detector Delivered at CD-4a

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 CXI instrument located in Hutch 5: X-ray beam focusingBe lens system for 10 micron focus, Kirkpatrick Baez systems for 1 and 0,1 micron foci Sample chamberSample diagnostics (ion and electron time of flight, visible light), raster stage for supported sample, cryo-EM goniometer for nanosacle objects, the particle injector, detector stage and the precision instrument stand, capability to add laser sample alignment Beam diagnosticsIncident beam intensity, wavefront sensor to measure the focal spot size. Control systemComplete control system and data acquisition and storage DetectorShared use of LCLS 2 dimensional detector optimized for the needs of CXI Delivered at the end of the Project

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 XPP instrument located in Hutch 3 X-ray beam focusingBe lens system Offset monochromatorA large offset monochromator to both provide monochromatic operation of XRPP and permit beam sharing 8 circle diffractometer X-ray emission spectrometer Laser opticsDedicated laser system providing both OPA as well as harmonics Beam diagnosticsComplete diagnostic suite Control systemComplete control system and data acquisition and storage DetectorFull 1k x 1k 2 dimensional detector system Delivered at the end of the Project

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 XCS instrument located in Hutch 4 X-ray beam focusingBe lens system Offset monochromatorA large offset monochromator to permit ‘independent’ operation of XPCS as well as permit beam sharing, including vacuum beam transport Multi-circle diffractometer X-ray pulse split and delay Beam diagnosticsComplete diagnostic suite Control systemComplete control system and data acquisition and storage DetectorFull 1k x 1k 2 dimensional detector system Delivered at the end of the Project

J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 Schedule (milestones) CD-1 July 13, 2007 Conceptual design CD-2aDecember 3, 2007 Baseline established (Phase I) CD-3aMarch 31, 2008Construction start (Phase I) CD-4aFebruary 8, 2010Phase I complete CD-2bOctober 1, 2009Baseline established (Phase II) CD-3bMarch 31, 2010 Construction start (Phase II) CD-4bMarch 30, 2012Project complete Phase I Early FinishOctober 30, 2009 CD-1 July 13, 2007 Conceptual design CD-2aDecember 3, 2007 Baseline established (Phase I) CD-3aMarch 31, 2008Construction start (Phase I) CD-4aFebruary 8, 2010Phase I complete CD-2bOctober 1, 2009Baseline established (Phase II) CD-3bMarch 31, 2010 Construction start (Phase II) CD-4bMarch 30, 2012Project complete Phase I Early FinishOctober 30, 2009