Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Team Lightning Rod Launch Readiness Review Fall 2010 Rev C 11/2/2010 Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
AXIOM Balloon Sat Team #2 Critical Design Review October 17, 2006 Gateway To Space Fall 2006 Dustin MartinBen Anderson Drew GottulaJacob Rivera Adam TrevizoStefan.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Mate Launch Readiness Review Jason Schelz, Will Hakes, Emma Mossinger, Ethan Long, Brendon Barela, Amelia Weller 11/02/10.
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Hubble Jr. Conceptual Design Review Holly Zaepfel, Rachel Small, Kyle Norman, Ryan Del Gizzi, Chris Everhart, Evan Levy September 21, 2006.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Cydonia Final Review Presentation 6 December 2007 Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
Team Dionysus Critical Design Review Alijah Smith, Chris Koncilja, Elise Kowalski, Josh Tiras, Mike Beach, Becca Seigel 10/06/09.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Oddballs Critical Design Review Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend 10/18/07.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Team Cutthroat Conceptual Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn September 21, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Team Dionysus Launch Readiness Review Elise Kowalski, Michael Beach, Josh Tiras, Chris Konciljia, Alijah Smith, Becca Seigel November 5, 2009.
Design Review Corinne Desroches Saad Alqahtani Charles MacCraiger Alexa Warly Connor Jacobson Kyle Skjerven Matt Busby.
1 Student Hands On Training I (2009) BalloonSats & Ballooning BalloonSats & Ballooning.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Team Honey Badger R.A.H.D. Critical Design Review October 18, 2012 Josh Power Karyn Science Kyle Team Leader C+DH Annie C+DH Zach Budget + Science C&DH.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Junk in a Box Critical Design Review
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Team Go Go Gadgets Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team Honey Badger Conceptual Design Review
Critical Design Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006

Mission Overview Our aim is to detect the amount of cosmic rays during the period of launch and flight. –We will be taking the data we collect, and comparing it to altitude, as well as previous experiments. –We plan to take this information and look for irregularities and possible signs of solar flares.

Design RM-60 Geiger Counter Video Camera –2GB SD Memory Card HOBO Data Logger –Temperature Probe Timing Circuit –Power Supply Picture Camera –Film Insulation Foam Core Aluminum Tape Wires/Telephone Cord Heater

The Inner Workings

Geiger Counter The Geiger counter will be on the top of the satellite facing up. –From this position we can detect cosmic rays.

Block Diagram

Budget

Mass Budget

Schedule Oct. 3- Have design completed and parts ordered Oct. 7- Design Document Revision A completed Oct. 10- Ordered parts received, begin construction Oct. 12- Complete satellite prototype Oct. 13- Drop Test (one day for adjustments) Oct. 15- Design Document Revision B completed Oct. 16- Whip Test Oct. 17- Drag Test Oct.17- Critical Design Review Presentation Oct. 18- Subsystem Test (one day for adjustments) Oct. 20- Functional Test (one day for adjustments) Oct. 22- Cooler Test (one day for adjustments) Oct. 24- Mission Sim Test Oct. 26- Continue with last minute adjustments needed Nov. 5- Design Document Revision C completed Nov. 9- Have satellite finished ready to turn in on Nov. 10 Nov. 11- Launch Day! Nov. 15- Begin work on Design Document Revision D Nov. 30- Design Document Revision D completed Dec. 5- Final Team Presentation

Test Plan Oct. 13 Drop Test: The Drop Test will be performed outside the Engineering Center. The foam core structure and simulated mass, which will consist of rocks secured inside the box, will be dropped from approximately 15 feet onto concrete and then kicked down a flight of stairs to test the structural integrity of the design. Oct. 16 Whip Test: The Whip Test will take place outside the Engineering Center. The structure will have the secured simulated mass and the flight string secured through the aperture and will be swung in a circular motion to replicate the whipping motion throughout flight, namely after burst. Oct. 17 Drag Test: The Drag Test will take place around campus with the box and mass attached to a string fastened to a bicycle. This test will simulate the landing of the satellite and therefore test its structural integrity. Oct. 18 Subsystem Test: The Subsystem Test will be performed in the Brackett Lounge. All of the electronics in the box will be turned on at this time in order to verify their individual functionality. Oct. 20 Functional Test: The Functional Test will take place in the Brackett Lounge. All of the electronics in the box will be turned on at the same time to make sure that all of the systems work together, as they will need to during flight. Oct. 22 Cooler Test: The Cooler Test will take place in the Engineering Center. The complete satellite will be placed in a cooler with dry ice. All of the components will be turned on and will have to last three hours without shutting off or malfunctioning, as will be needed during flight. Oct. 24 Mission Simulation: The Mission Simulation will be performed in the Brackett Lounge. All of the electronics will be turned on for three hours with an extra half hour allotted for extended flight. If this test succeeds, the satellite will be ready to launch.

Expected Results Photography- We expect our still camera to take pictures of the ground out of the bottom of the satellite. The pictures will be taken every two minutes and successively illustrate the ascent. Video- We expect our video camera, trained on the horizon, to capture different layers of the atmosphere and into space. The camera will run nonstop from launch until memory runs out (we believe it will last until the satellite lands). Geiger Counter- We will run our RM-60 Geiger counter on a basic stamp set on intervals. We anticipate it will collect different magnitudes of radiation proportional to altitude gain. Structure- We believe the structure of our satellite will withstand the forces of launch, balloon burst, and landing. We expect it will be scuffed and the corners dented in, but no detrimental damage is anticipated.

Team Pictures