Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, 2008 1 LTU/Undulator Commissioning Plans Heinz-Dieter.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
January 24, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Undulator BLM PDR Review 1 Undulator BLM PDR Review Heinz-Dieter Nuhn, SLAC / LCLS.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Undulator Physics April 29, 2004 Heinz-Dieter Nuhn, SLAC / SSRL Facility Advisory Committee Meeting Undulator Physics Diagnostics.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Paul Emma, et al. LCLS FAC May 13, LCLS Commissioning: Results & Plans P. Emma, for the LCLS Commissioning Team LCLS FAC.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Undulator Commissioning September 22, 2004 Heinz-Dieter Nuhn, SLAC / SSRL LCLS Commissioning Workshop Undulator / FEL Commissioning.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Undulator Overview FEL Performance Assessment
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
1 Heinz-Dieter Nuhn 1 Undulator Commissioning August 2009 FEL2009 Undulator Commissioning, Alignment and Performance Heinz-Dieter.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Introduction – November 14, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Beam Based Undulator Measurements Workshop 1 Introduction Heinz-Dieter.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
James Welch August 27,2009 FEL 2009 Undulator K-Parameter Measurements at LCLS J. Welch, SLAC National Accelerator Laboratory Contributors:
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
What did we learn from TTF1 FEL? P. Castro (DESY).
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Revised Commissioning Strategy
Commissioning Status of the LCLS Accelerator and Undulator Systems
Diagnostics overview and FB for the XFEL bunch compressors
Beam-Based Alignment Results
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
FEE Diagnostics and Commissioning
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Final Break Length Choice AC Conductivity Wakefields
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Presentation transcript:

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter Nuhn, SLAC / LCLS June 16, 2008 Overview Pre-Beam Checkouts LTU to Dump Commissioning (No Undulator Segments) Undulator Segments Commissioning Characterization of Spontaneous Synchrotron Radiation Characterization of SASE Overview Pre-Beam Checkouts LTU to Dump Commissioning (No Undulator Segments) Undulator Segments Commissioning Characterization of Spontaneous Synchrotron Radiation Characterization of SASE

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Related Presentations Paul Emma, Commissioning Results and Plans H. Tompkins, FEE/FEL Commissioning Overview Richard Bionta, FEE Diagnostics and Commissioning

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LCLS Installation and Commissioning Time-Line LTU/Und/Dump Install LTU/UndComm. Re-commission Inj/BC2 to SL2 First Light in FEE PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump FEH Install CD-4 (7/31/2010) X-Rays in NEH First Light in FEH NEH Operations/ Commissioning JFMAMJJASDJFMAMJJASONDJFMAMJJON A Down PPS AM now Linac/BC2 Commissioning FEEComm. May 2, 2008 FEH Hutch BO Undulator Seg. Install

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Beam-Based Commissioning A A B B C C D D A: LTU – Dump B: Undulator Segments C: Spontaneous X-Rays D: SASE A: LTU – Dump B: Undulator Segments C: Spontaneous X-Rays D: SASE e - -Beam X-Ray

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Installation and Conventional Alignment (=>Nov 08) All beamline components except Undulator Segments Pre-Beam Checkouts (Checklists will be prepared) (Oct-Dec 08) LTU Section Magnet Polarities / Motion (OTR, Collimators, Wire-scanners) / etc. Undulator Section Magnet Polarities / Motion (Girder, BFW, Slide) / ADS Calibration / etc. Pre-Undulator Commissioning with Beam (Jan 09 – Mar 09) LTU Section Undulator Section (w/o Undulator Segments) Motion Control / Beam Containment / Beam-Based Alignment / etc. Beam Dump Section Installation of Undulator Segments (Mar 09) Undulator Commissioning with Beam (Mar 09 – Apr 09) Beam Based Alignment / Undulator Slide Functions / Beam Stability Installation and Conventional Alignment (=>Nov 08) All beamline components except Undulator Segments Pre-Beam Checkouts (Checklists will be prepared) (Oct-Dec 08) LTU Section Magnet Polarities / Motion (OTR, Collimators, Wire-scanners) / etc. Undulator Section Magnet Polarities / Motion (Girder, BFW, Slide) / ADS Calibration / etc. Pre-Undulator Commissioning with Beam (Jan 09 – Mar 09) LTU Section Undulator Section (w/o Undulator Segments) Motion Control / Beam Containment / Beam-Based Alignment / etc. Beam Dump Section Installation of Undulator Segments (Mar 09) Undulator Commissioning with Beam (Mar 09 – Apr 09) Beam Based Alignment / Undulator Slide Functions / Beam Stability LTU/Undulator e - -Beam Commissioning Blocks A A B B

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU-to-Dump Pre-Beam Checkouts (Oct-Dec 08) Undulator Hall HVAC System checkout (before Girder installation) ADS (WPM & HLS) Control System checkout ADS commissioning EPICS Control System Checkout Network Configuration of IOC's Timing System Communication with ADS Checkout Verification of individual Device Operation Magnet Power Supplies and Interlocks Magnet Polarity Checkout Dipoles Quadrupoles Correctors (where power supplies available) BPM Cable Checkout Motion Checkouts Movable Collimator motion Wire Scanner motion & calibration Beam Finder Wire In/Out motion (BFW01 – BFW33) Girder Motion Control checkout (33 Girders using external pos. sensors) CAM Mover motion checkout Transverse slide motion checkout Compound motion checkout (Smooth beamline motion, System re-pointing) Undulator Hall HVAC System checkout (before Girder installation) ADS (WPM & HLS) Control System checkout ADS commissioning EPICS Control System Checkout Network Configuration of IOC's Timing System Communication with ADS Checkout Verification of individual Device Operation Magnet Power Supplies and Interlocks Magnet Polarity Checkout Dipoles Quadrupoles Correctors (where power supplies available) BPM Cable Checkout Motion Checkouts Movable Collimator motion Wire Scanner motion & calibration Beam Finder Wire In/Out motion (BFW01 – BFW33) Girder Motion Control checkout (33 Girders using external pos. sensors) CAM Mover motion checkout Transverse slide motion checkout Compound motion checkout (Smooth beamline motion, System re-pointing)

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU Commissioning with Beam (Jan-Mar 09) Perform radiation surveys in BTH/FEE, etc with beam in the dump (Stan Mao, et al.) Checkout BPMs (timing, scale, sign errors, etc.) Test MPS (toroid collimators, BPMs, loss monitors, magnets, trip the beam, etc?) Checkout optics using beam oscillation data (does a betatron oscillation fit the model well everywhere? – backwards quads?) Test/checkout BYKIK and its abort dump and logic (MPS). Test/checkout new OTR screens/cameras (OTR30, OTR33, and OTRDMP). Test/checkout new wire scanners (WS31, 32, 33, 34). Test/checkout new adjustable collimators (CEDL1, CEDL3, CX31, CY32, CX35, CY36) Commission new energy and launch feedback loops. Characterize beam, etc. Perform radiation surveys in BTH/FEE, etc with beam in the dump (Stan Mao, et al.) Checkout BPMs (timing, scale, sign errors, etc.) Test MPS (toroid collimators, BPMs, loss monitors, magnets, trip the beam, etc?) Checkout optics using beam oscillation data (does a betatron oscillation fit the model well everywhere? – backwards quads?) Test/checkout BYKIK and its abort dump and logic (MPS). Test/checkout new OTR screens/cameras (OTR30, OTR33, and OTRDMP). Test/checkout new wire scanners (WS31, 32, 33, 34). Test/checkout new adjustable collimators (CEDL1, CEDL3, CX31, CY32, CX35, CY36) Commission new energy and launch feedback loops. Characterize beam, etc. A A

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Undulator Beamline Commissioning to Main Dump with Beam but without Undulator Segments (Jan-Mar 08) Commission Radiation Monitors Get Beam through Undulator vacuum pipe with minimum losses. Checkout BPMs (timing, scale, sign errors, etc.) Commission Girder Motion with Beam Verify and calibrate steering effect of quadrupole motion Calibrate motion parameters (gain, pivot points etc.) Check BPM offset tracking Commission RF Cavity BPMs Check charge dependent response over entire charge range Use Girder Motion to calibrate position vs. readings Check and correct optics matching over entire operational energy range Commission Beam Based Alignment (BBA) Develop saved configurations for three different energies. Commission BBA GUIs and BBA procedure. Commission Beam Finder Wires Calibrate PMT signals. Commission BFW GUIs (Alignment and scanning capabilities) Commission ADS-based girder position stabilization feedback systems. Commission Tune-Up Dump in preparation for commissioning with Undulator Segments Commission Radiation Monitors Get Beam through Undulator vacuum pipe with minimum losses. Checkout BPMs (timing, scale, sign errors, etc.) Commission Girder Motion with Beam Verify and calibrate steering effect of quadrupole motion Calibrate motion parameters (gain, pivot points etc.) Check BPM offset tracking Commission RF Cavity BPMs Check charge dependent response over entire charge range Use Girder Motion to calibrate position vs. readings Check and correct optics matching over entire operational energy range Commission Beam Based Alignment (BBA) Develop saved configurations for three different energies. Commission BBA GUIs and BBA procedure. Commission Beam Finder Wires Calibrate PMT signals. Commission BFW GUIs (Alignment and scanning capabilities) Commission ADS-based girder position stabilization feedback systems. Commission Tune-Up Dump in preparation for commissioning with Undulator Segments A A

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Install Undulator Segments (Mar 09) Mount Undulator Segments onto girders Segments will be stored in Undulator Hall before installation System is designed to be Self-Aligning Re-check slide motion clearance Expect to install 3 Segments / day Mount Undulator Segments onto girders Segments will be stored in Undulator Hall before installation System is designed to be Self-Aligning Re-check slide motion clearance Expect to install 3 Segments / day

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, First Beam Through Undulator Segments (Mar 09) Conditions for First Beam: All Undulator Magnets Rolled-Out Single Shot Operation (low charge) Send single electron bunch through undulator Read and evaluate as much diagnostics as possible along undulator (such as BPMs, beam loss monitors, toroids) Identify and remove sources of beam loss – if any Iterate Goal: Get beam through vacuum chamber with minimum losses. Reminder: Main Constraint is to Protect Undulator from Radiation Damage Conditions for First Beam: All Undulator Magnets Rolled-Out Single Shot Operation (low charge) Send single electron bunch through undulator Read and evaluate as much diagnostics as possible along undulator (such as BPMs, beam loss monitors, toroids) Identify and remove sources of beam loss – if any Iterate Goal: Get beam through vacuum chamber with minimum losses. Reminder: Main Constraint is to Protect Undulator from Radiation Damage B B

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, First Undulator Segments Commissioning (Mar – Apr 09) Undulator Segments still in Roll-Out position Run BBA Roll-In Individual Undulator Segments Transport beam through individual Undulator Segments Start at slot #33 (last Undulator Segment) Check and correct trajectory change. Run BBA with Undulator Segments inserted. Check Segment alignment with BFWs Undulator Segments still in Roll-Out position Run BBA Roll-In Individual Undulator Segments Transport beam through individual Undulator Segments Start at slot #33 (last Undulator Segment) Check and correct trajectory change. Run BBA with Undulator Segments inserted. Check Segment alignment with BFWs B B

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Commissioning of X-Ray Diagnostics (May – Jun 09) Direct Imager Slit Solid Attenuator Gas Attenuator Gas Detector Beam-Based K Measurement Components Direct Imager Slit Solid Attenuator Gas Attenuator Gas Detector Beam-Based K Measurement Components Minimum Requirement See presentations by Tompkins and Bionta X-Ray Diagnostics is located after last Undulator Segment in Front-End Enclosure (FEE)

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, X Ray Diagnostics (FEE) Solid Attenuator Gas Attenuator Slit Start of Experimental Hutches 5 mm diameter collimators Muon Shield Hard X-Ray Offset mirror system Total Energy Thermal Detector WFOV NFOV Gas Detector e-e- Direct Imager Hard x-ray Monochromator (K Spectrometer) Soft X-Ray Offset mirror system See presentations by Tompkins and Bionta

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Characterization of Spontaneous Radiation (May – Jun 09) Initially at 1.5 Å to reduce damage issue Start at low charge Repetition rate of 10 Hz or lower will be sufficient Start to characterize radiation at last undulator Measure: total spontaneous energy / pulse spontaneous beam direction temporal variation in spontaneous beam parameters spatial distribution around first spontaneous harmonic spontaneous radiation spectrum wavelength of first harmonic first harmonic wavelength spread Characterize radiation from each individual Undulator Measure relative K of Undulator pair. Initially at 1.5 Å to reduce damage issue Start at low charge Repetition rate of 10 Hz or lower will be sufficient Start to characterize radiation at last undulator Measure: total spontaneous energy / pulse spontaneous beam direction temporal variation in spontaneous beam parameters spatial distribution around first spontaneous harmonic spontaneous radiation spectrum wavelength of first harmonic first harmonic wavelength spread Characterize radiation from each individual Undulator Measure relative K of Undulator pair. Limited capability using K Spectrometer C C

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, K Measurement: 2-Segment Scheme Measure synchrotron radiation spectrum produced by two undulator segments, and scan K of one segment K’s are matched when spectrum has the steepest slope on high energy side of 1st harmonic peak. Match segments pair-wise until all segments are measured. undulator segments (33 total) segments under test C C

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Angle-Integrated Spontaneous Spectrum for 2 Undulators with  K/K =  0.2 to +0.2% 0.1% rms e  energy jitter 0.003% rms e  energy meas. resolution 2% rms charge jitter 0.5% charge meas. res. 0.5  rms angle jitter 10 5 photons/pulse/0.01% 100 photon noise 100 beam pulses with natural energy jitter only 0.1% rms e  energy jitter 0.003% rms e  energy meas. resolution 2% rms charge jitter 0.5% charge meas. res. 0.5  rms angle jitter 10 5 photons/pulse/0.01% 100 photon noise 100 beam pulses with natural energy jitter only  = 0  K/K =  0.2%  K/K =  0.2%  K/K = 0% ~10 6 photons/nC/0.01%BW  x =  3 mm Simulations P. Emma C C

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Characterization of SASE (Jul – Aug 09) Initially at 15 Å to maximize SASE gain Start with reduced number of undulators Redo BBA after change of undulator configuration Verify that electron beam meets requirements Find SASE signal using Direct Imager Use Laser-Heater modulation to control gain (7 Hz Lock-In Detection) if necessary Repetition rate of 30 Hz (to support Lock-In Detection) Optimize gain (through electron beam quality and BBA) Measure gain length etc… Initially at 15 Å to maximize SASE gain Start with reduced number of undulators Redo BBA after change of undulator configuration Verify that electron beam meets requirements Find SASE signal using Direct Imager Use Laser-Heater modulation to control gain (7 Hz Lock-In Detection) if necessary Repetition rate of 30 Hz (to support Lock-In Detection) Optimize gain (through electron beam quality and BBA) Measure gain length etc… D D

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Measurements along undulator Intensity (L G, Saturation) Measurements after undulator Photon wavelength Photon wavelength spread Pulse intensity Pulse duration Pulse centroid and direction Spatial distribution Jitter Measurements along undulator Intensity (L G, Saturation) Measurements after undulator Photon wavelength Photon wavelength spread Pulse intensity Pulse duration Pulse centroid and direction Spatial distribution Jitter FEL Measurements Undulator Regime Exponential Gain Regime Saturation 1 % of X-Ray Pulse Electron Bunch Micro-Bunching D D

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, SASE Characterization with FEE Diagnostics X-ray beam diagnostics located in FEE, down stream of last Undulator Segment Obtain necessary z-dependent information through SASE gain shut-off at selectable points along undulator line by Introduction of trajectory distortion or Roll-out of individual undulator segments X-ray beam diagnostics located in FEE, down stream of last Undulator Segment Obtain necessary z-dependent information through SASE gain shut-off at selectable points along undulator line by Introduction of trajectory distortion or Roll-out of individual undulator segments D D

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Measurement of SASE Gain Length Using Rollout Undulator Segments can be rolled-out by remote control. Roll-out will start at the last Segment. Rolled-out Segments will not effect radiation produced by earlier segments. D D

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Plans for LTU/Undulator commissioning have been worked out and include Detailed pre-beam checkout LTU-Main Dump commissioning without Undulator Segments installed. Installation of Undulator Segments. Undulator Segment Commissioning Characterization of Spontaneous Radiation will be combined with commissioning of X-Ray diagnostics suite in FEE Beam based K-measurement method included. Characterization of SASE will start at 15 Å Gain length measurements will use FEE x-ray diagnostics combined with z-dependent SASE gain cut-off Plans for LTU/Undulator commissioning have been worked out and include Detailed pre-beam checkout LTU-Main Dump commissioning without Undulator Segments installed. Installation of Undulator Segments. Undulator Segment Commissioning Characterization of Spontaneous Radiation will be combined with commissioning of X-Ray diagnostics suite in FEE Beam based K-measurement method included. Characterization of SASE will start at 15 Å Gain length measurements will use FEE x-ray diagnostics combined with z-dependent SASE gain cut-off Summary D D C C B B A A

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, End of Presentation

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Application Software Development LTU Emittance Measurement (Loos – extension of existing GUI) Undulator Steering and re-Pointing (Nuhn) Beta-Matching into the Undulator – with variable mean beta (Loos) Beam-Based Alignment of the FEL Undulator (Loos) Beam-Finder Wire Application – Centering & Emittance (Loos/Nuhn) K-Measurement Application (Welch/Nuhn) There will probably be more … LTU Emittance Measurement (Loos – extension of existing GUI) Undulator Steering and re-Pointing (Nuhn) Beta-Matching into the Undulator – with variable mean beta (Loos) Beam-Based Alignment of the FEL Undulator (Loos) Beam-Finder Wire Application – Centering & Emittance (Loos/Nuhn) K-Measurement Application (Welch/Nuhn) There will probably be more …

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Undulator Segment and TLD Replacement Program

Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, Measurement of SASE Gain Length with Trajectory Distortion GENESIS Simulations by Z. Huang Quadrupole Displacement at Selectable Point along Undulator D D