PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

ZXM10 EISU Training.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
PowerEdge M-Series CMC Management
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Ports, Cables and Connectors
PALM-3000 Electronics PDR Stephen Guiwits Dean Palmer Ernest Croner 023 Robinson Room January 21, 2009.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
Chapter 22 All About SCSI.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Students: Nir Engelberg Ezequiel Hadid Supervisor: Mony Orbach In association with: September 28, Winter 2005.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K FPDP Carrier Board Review Dean Palmer Building 318, Room 125 November 10, :00 am – 12:00 pm.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 P3K Team Meeting #15 Stephen Guiwits Dean Palmer Ernest Croner Team Meeting # Cahill October 29, 2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 ATST/BBSO Visit Stephen Guiwits P3K System Hardware 126 Cahill February 11, 2010.
Understanding Networks II. Objectives Compare client and network operating systems Learn about local area network technologies, including Ethernet, Token.
Microprogrammes control the KOMBIS TMM8003. For the reliable operation of its systems and devices there are several programs located in two controllers.
The Components of a PC (By Lewis Barrett)
Computers Are Your Future Eleventh Edition Chapter 2: Inside the System Unit Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall1.
COMPUTER SYSTEM.
1 CCTV SYSTEMS PAN, TILT AND ZOOM CAMERAS. 2 CCTV SYSTEMS A PTZ camera is a pan, tilt, and zoom camera that is different from a fixed dome camera in that.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Motherboard AKA mainboard, system board, planar board, or logic board. It is printed circuit board found in all modern computers which holds many of the.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
ZTF Interconnecting Scheme Stephen Kaye
1 Chapter 7 - Networking Fundamentals Computer network: – Two or more computers connected together Each is a Node (other nodes: printers, network devices,
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 22 All About SCSI.
Jeffrey Hepworth Erik Mauer Brendan Murphy David Rodriguez VEND Team VEND‘etta’
1 Chapter 7 - Networking Fundamentals Computer network: – Two or more computers connected together Each is a Node (other nodes: printers, network devices,
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Computer system components By Corey Burton. GPU GPU stands for ‘graphics processing unit’. The GPU can help the computer run smoothly. GPU is used for.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
GBT Interface Card for a Linux Computer Carson Teale 1.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
Source Controller software Ianos Schmidt The University of Iowa.
Computer Hardware – System Unit
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Lesson 4—Networking BASICS1 Networking BASICS Network Architectures Unit 2 Lesson 4.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ALPAO ACEfast RTC Armin Schimpf, Mickael Micallef, Julien Charton RTC Workshop Observatoire de Paris, 26/01/2016.
Lecture 2 unit 1.
COMPUTER COMPONENTS Ms Jennifer Computer Components.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Computer Hardware – System Unit
CCS Hardware Test and Commissioning Plan
Introduction to Networks
Control System Summary of Changes Since PDR
Presentation transcript:

PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010

PALM-3000 Agenda P3K Electronics Team Overview of the P3K Architecture –RTC System –DM System –Cassegrain System Work Completed –What has been built and tested –Known Issues Work Remaining

PALM-3000 P3K Electronics Team Dean Palmer (JPL) Antonin Bouchez (CIT) Ernest Croner (CIT) Hector Rodriguez (CIT) Stephen Guiwits (JPL) 3

PALM-3000 P3K Architecture 4

PALM-3000 P3K Electronics and Interfaces Overview

PALM-3000 RTC System Cluster of 10 PC’s in the computer room Real-time calculations performed on 16 Nvidia GPU’s PC 0 provides the servo control, central scheduling, control of the cluster, and high-speed data link to mirror drivers (HODM, LODM, TTM) PC 1 – PC 8 provides GPU calculations PC 9 is dedicated to telemetry recording Cluster communication provided by the high speed Quadrics switch 1064 Mbytes/s 900 MB/S Sustainable RAID System –RAID 0 –Two partitions (High speed data / All other data) Optical Splitter provides duplicates frames to all 8 PC’s All PC’s running Red Hat Enterprise Linux 5 –Kickstart set up for automated, repeatable installations –Custom RPMS built and tested specifically for P3K 6

PALM RTC System PC 0 – 9 RAID System KVM Switch Quadrics High Speed Switch 16 Port Gigabit Ethernet Switch Optical Splitter

PALM-3000 HODM System 8 Xinetics Drivers Two full height racks (30U / 52.5”) Currently air cooled –Liquid cooled on telescope Serial Interface –Slow speed control SOR-422U Interface –High speed control –Custom built electronics 8

PALM-3000 HODM Interfaces Serial (Low Speed) –Used for start-up configuration and status monitoring –Serial Baud –Communicate with each driver through a terminal server Terminal server has 8 RJ 45 ethernet ports Each driver has a 9 pin DB 9 connector 9 pin – RJ 45 adapter required –Drivers have a Primary/Secondary configuration Specially developed by Xinetics for P3K SOR-422U (High Speed) –High speed interface between the RTC and the DM –Interface provided by the Xinetics Electronics –Procured Curtiss Wright FibreXtreme SL240 COTS transmit and receive cards and integrated them into custom electronics Able to sustain very high data rates Up to 247 MB/s per channel sustained data rate per channel Low latency (about 1us) 4 independent channels (2 for HODM, 1 LODM, 1 TT) 9

PALM-3000 Cassegrain System Rack 1 (currently being changed for liquid cooling) –Liquid cooled –Low order DM electronics –WFS Camera –PC 10

PALM-3000 Cassegrain System Rack 2 –Air cooled –Motion controllers –Motor cable break-out box –Laser sources 11

PALM-3000 Work Completed 12

PALM-3000 Work Completed RTC System (hardware, cabling, communications, kickstart) HODM System –Hardware –Communications Cassegrain Racks –Required lab components working During lab testing we didn’t have (or require) all components as some were still being used in the original AO system –Communications Control Computer –Software and hardware installed and configured –Currently used for running the AO system in the lab 13

PALM-3000 Known Issues 14

PALM-3000 Xinetics GenIII Drivers Stability –Idle issues. Random driver will fault when powered on and not used (no voltage applied) –Work well after running Multiple runs over a 48+ hour period –Thousands of commands sent to date –Serial interface has several bugs. We have been able to work around them so far. 15

PALM-3000 High Speed Interface Random data in one quadrant of the mirror –Doesn’t appear all the time –Working on finding out what the cause is Possibly in the FPGA portion of the high speed interface SOR-422U issue within the driver 16

PALM-3000 Work Remaining 17

PALM-3000 Work Remaining Move current hardware in CIT lab to Palomar LODM interface TTM interface Cabling –HODM –WFS –Motion Control 18 The following is a summary of work remaining to achieve first light

PALM-3000 Move CIT lab to Palomar 19 Ship everything currently in the lab at Caltech to Palomar Set up electronics and test with Palomar infrastructure (power, communications) and verify things are working as expected Integrate electronics with the components currently on the AO bench and verify things are working as expected

PALM-3000 Low Order Mirror Electronics Steps required to complete: Design receiver PCB required to take the place of the current board - done Send PCB out for fabrication - done FPGA programming Test completed board Retrofit current low order amplifier boards Assemble into rack enclosure 20 We require a new board to be built for communications with the low order deformable mirror electronics due to architecture changes. This will be a drop in replacement board allowing us to reuse our existing electronics and cabling with minor modifications.

PALM-3000 Tip Tilt Mirror Electronics Steps required to complete: Design PCB - done Send out PCB for fabrication - done Procured TTM PCB mounting enclosure - done Program FPGA – in progress Send TTM PCB mounting enclosure out for engraving Procure power source for mirror electronics Test completed board Assemble into mounting box Design and build interim cable 21 We require new electronics to communicate with our tip tilt mirror. These electronics will receive data from one of our RTC machines and send the data to the mirror.

PALM-3000 Cabling 22 In order to provide a save and efficient way for the Mt. Palomar staff to cable up the new system, we had to design a new cabling scheme for our new electronics. The HODM, Motor cables, and WFS cables require design and fabrication. HODM Xinetics shipped 99 Omnetics cable with the electronics. These cables are very fragile and take hours to connect We will: Reduce cables from 99 to 16 Reduces installation from < 2 hours to ~1 minute Use Hypertronics connectors 100,000 mating cycles Low insertion force ½ turn quick disconnects

PALM-3000 Cabling Motor cables We will: –Reduce 19 cables of different type connectors to 2 connectors (1 signal, 1 power) –Reduces installation time from < 20 minutes to ~ 1 minute –Use Hypertronics connectors 100,000 mating cycles Low insertion force ½ turn quick disconnects WFS cables –The wave front sensor camera came with a set of cables that are to short for use on the telescope as well as tedious to connect We will: –Reduce 19 cables of different type connectors to 2 connectors –Reduces installation time from < 20 minutes to ~ 1 minute 23

PALM-3000 Cabling High order deformable mirror (HODM) cabling –Bench interface Design cable box enclosure Plan integration of 99 Omnetics cables to the Mirror Interface Boards (MIB) – Spreadsheet mapping connections Modify 99 Omnetics cables and wire into MIB –Cut cables to appropriate length –Soldering open end to connectors located on the MIB Test signals from cable  MIB Assemble boards/cables with HODM bench enclosure –Rack interface Complete DIB cable design Design mounting box for the Driver Interface Boards (DIB) Assemble boards with support and enclosure in the racks 24

PALM-3000 Cabling HODM Cabling (Continued) –DM cables (16) Send out for fabrication - done Test finished 30’ DM cables Motor cabling –Plan integration of motors into two cables Signal Cable Power cable –Send motor cables out for fabrication Procured the long lead items ahead of time - done 25

PALM-3000 Cabling Motor cabling (Continued) –Bench interface Design bench side enclosure box Complete wiring design between motor connectors and Hypertronics cables Assemble wiring and connectors into bench enclosure –Rack interface Reusing the current motor interface box Design wiring inside the enclosure Assemble wiring and connectors in enclosure in rack –Test finished 30’ motor cables 26

PALM-3000 Cabling High Order Wavefront Sensor Cabling –Came with vendor supplied cables Need a faster way to hook up WFS cables –Designed interfaces for easy installation Bench and rack interfaces –Order parts – done –Assembling cables – in progress –Design and fabricate rack side interface panel Part of the enclosure design –Test final cables 27

PALM-3000 Questions, Comments, Suggestions

PALM-3000 Real-Time Operating System Suse Linux Enterprise Real-Time Linux (SLERT) –Set up kickstart for Suse 11 –Install and test Real-Time Kernel –Install and test Quadrics Drivers On all PC’s –Install and test CUDA Drivers On PC’s –Install and test EDT Drivers PC’s 1 – 8 only –Install and test Fiber Channel Drivers Telemetry computer only –Test AO software running on the real-time system 29